Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
1/25/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Building Inspection
|
|
Date Completed:
|
| | |
11/17/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
10/14/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Miscellaneous inspection
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
10/3/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Wallboard Inspection
|
|
Date Completed:
|
| | |
10/2/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insulation Inspection
|
|
Date Completed:
|
| | |
9/26/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Miscellaneous inspection
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Foundation Inspection
|
|
Date Completed:
|
| | |
4/30/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
5/2/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
10/2/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
9/24/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
9/24/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
7/31/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-U
|
|
Date Completed:
|
| | |
9/24/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
7/23/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Application Received-UF
|
|
Date Completed:
|
| | |
7/23/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
7/31/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
7/22/2002
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
8/7/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
8/19/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
7/22/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
7/22/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
9/24/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
9/24/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
9/24/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
8/21/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Custom Condition
|
|
Wording
|
| | |
SEPTIC DESIGN SHOWS THAT SEPTIC TANKS COULD BE UNDER DRIVEWAY/PARKING AREA. DO NOT DRIVE OR PARK IN SEPTIC TANK AREA.
|
|
|
Title:
|
| | |
Bld building height
|
|
Wording
|
| | |
The building height is not to exceed 35 feet.
|
|
|
Title:
|
| | |
Custom Universal Condition
|
|
Wording
|
| | |
The applicant shall adhere to all of the conditions stipulated through the Hearing Examiners Findings and Decision dated 3/19/02.
|
|
|
Title:
|
| | |
Follow Flood Ordinance
|
|
Wording
|
| | |
Flood proofing measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance.
|
|
|
Title:
|
| | |
Res Construction Flood Damage
|
|
Wording
|
| | |
All new construction shall use construction methods which minimize flood damage.
|
|
|
Title:
|
| | |
Res Construction Elevated Floor
|
|
Wording
|
| | |
New construction shall have the lowest floor elevated to at least one foot above base flood elevation.
|
|
|
Title:
|
| | |
Flood Proof Requirement
|
|
Wording
|
| | |
Fully enclosed areas below the lowest floor that are subject to flooding are prohibited unless designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwater. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following criteria: a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one foot above grade. c. Openings may be equipt with screens, louvers, or other coverings or devices provided that they permit the automatic entry and exit of floodwater.
|
|
|
Title:
|
| | |
Materials and Methods
|
|
Wording
|
| | |
All new construction shall: a. be anchored to prevent flotation, collapse, or lateral movement of the sturcture. b. be constructed with materials and utility equipment resistant to flood damage and potential damage to adjacent properties. c. be constructed using methods and practices that minimize flood damage. d. have structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. e. electrical, heating, ventilation, plumbing, air-conditioning equipment, and other service facilities shall be designed and/or otherwise elevated or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
|
|
|
Title:
|
| | |
Flood Proofing
|
|
Wording
|
| | |
Flood proofing of structures shall be provided by one or more of the following methods: a. Landfill: (Note: Landfills are not permitted in the floodway.) The placement of fill may be utilized to elevate the structure and must comply with the standards and policies of the Jefferson County Shoreline Master Program, if applicable. b. Pole, pier or piling construction: The use of poles, piers, or piles for the foundation of the structure may be used to allow the unrestricted flow of flood waters during periods at a base flood. The lowest floor must be one foot above the base flood level. c. Parallel Foundation Walls: Foundation walls may be designed and constructed to provide open spaces through which water can flow unrestricted to equalize pressure. In velocity flood situations, it is important that all foundation walls be parallel to the flow of the floodwaters. d. Extended Foundation Walls and Basements: (Note: Extended foundation walls and basements are not permitted in the floodway.) The lowest habitable floor of a residence may be constructed on foundation walls that extend above grade to one foot above the height of the base flood provided that residential construction complies with the requirment of Section 5.101(2), "Residential Construction," regarding the design of enclosed areas.
|
|
|
Title:
|
| | |
Utilities-Flood
|
|
Wording
|
| | |
Utilities shall be designed as specified in Section 5.20 of Ordinance No. 18-1120-95.
|
|
|
Title:
|
| | |
Do Not Disturb Buffer
|
|
Wording
|
| | |
All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials.
|
|
|
Title:
|
| | |
Wetland Setback
|
|
Wording
|
| | |
A setback of 30-feet, measured perpendicularly from the wetland edge (also OHWM), shall be permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the wetland or its buffer is allowed.
|
|
|
Title:
|
| | |
Mark Wetland Buffer Drng Cnstrctn
|
|
Wording
|
| | |
Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer - Do Not Remove or Alter Existing Vegetation."
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
Stormwater Plan
|
|
Wording
|
| | |
A Small Parcel Sedimentation and Erosion Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
The Wetlands have been delineated by Olympic Wetland Resources. The report also included a plan to re-vegetate the disturbed areas. Both documents where part of the Conditional Use Permit (Zon02-00010) and all recommendations including monitoring shall be implemented with the re-vegetation plan.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
The proposed addition is consistent with the Conditional Use Permit approval (Zon02-00010). The proposed addition WILL NOT further encroach upon the associated estuary/wetlands then the original development and CUP approval.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
All generated Stormwater will not be discharged into the marine waters. If the proposal is proposing to collect and tightline stormwater into the marine water a permit shall be required.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on 7/22/02 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Wetlands (Category I and III), Shoreline (Conservancy), and Floodplain (Zone A).
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is proposing to create or add 720 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Small Parcel Sedimentation and Erosion Control Plan.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the building application on 7/22/02 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 9/24/02 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a residential addition only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|