Case Number | | XMP1999-00001
|
|
Description | | Installation of a single buoy for anchorage of a personal vessel within the waters of the State.
|
|
Last Name | | GRAHAM
|
|
Received Date | | 1/5/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1996-00014
|
|
Description | | To repair an existing bulk head to prevent damage to a residence.
|
|
Last Name | | MCCLELLAND
|
|
Received Date | | 4/4/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | ENV1995-00011
|
|
Description | | The Discovery Bay Watershed Mamagement Plan is a community - based resource plan to help manage non-point pollution. The water quality control strategy is submitted to comply with the regulations of WAC 400-12. The implementation strategy uses voluntary actions of the property owners to manage development of the watershed. Education and technical assistance will be provided to the community and volunteers through the Extension Service. The implementation strategy is not regulatory. The concept is to create a "bottom up approach" which will focus on widespread community education during the first six months and community based planning during the second six months. This approach has already been proven as ssuccessful in the Discovery Bay community.
|
|
Last Name | | COOPERATIVE EXTENSION SERVICE
|
|
Received Date | | 10/26/1995 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1992-00036
|
|
Description | | Routine maintenance of the marina access channel and the adjacent sediment bypass harvest area.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 3/23/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1989-00027
|
|
Description | | Testing an underwater cable embedment machine.
|
|
Last Name | | JACOBSON BROTHERS INC.
|
|
Received Date | | 7/7/1989 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1988-00002
|
|
Description | | PROPOSAL: The proposal is to extract and remove the rails, hardware, and ties from the railroad right-of-way from Junction City to Discovery Junction adjacent to Discovery Bay. The heavy equipment used, as well as the materials removed, will travel or be stored on the right-of-way. The old roadways paralleling the right-of-way will be restored, and the right-of-way will be cleared and regraded to natural conditions.
|
|
Last Name | | RECOVERY, INC.
|
|
Received Date | | 1/7/1988 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1987-10014
|
|
Description | | Extension of northern jetty of the Cape George Marina and a sediment harvest.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 12/7/1987 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00047
|
|
Description | | Dock work - Replanking and stringer replacement.
|
|
Last Name | | BRODERS
|
|
Received Date | | 12/2/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00024
|
|
Description | | Repair groin adjacent to the north channel of marina
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 6/9/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00008
|
|
Description | | Long line mussel cultivation proposal
|
|
Last Name | | BRODERS
|
|
Received Date | | 3/4/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00011
|
|
Description | | Conduct an oyster growing test.
|
|
Last Name | | MADSEN
|
|
Received Date | | 3/3/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00012
|
|
Description | | Temporary marking buoys in the water to locate salmon rearing test pen sites.
|
|
Last Name | | SEA FARM OF NORWAY, INC.
|
|
Received Date | | 3/3/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1986-10003
|
|
Description | | CONDUCT SALMON REARING TEST AT THE NORTHERN END OF DISCOVERY BAY
|
|
Last Name | | SEA FARM OF NORWAY, INC
|
|
Received Date | | 1/29/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10001
|
|
Description | | Construct wood walkway for beach access
|
|
Last Name | | EVANGELICAL METHODIST CHURCH INC
|
|
Received Date | | 1/12/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1976-10021
|
|
Description | | Add approximately 90 feet of floating dock to present docking facility, gas dock, and 3 covered moorages.
|
|
Last Name | | BARRETT
|
|
Received Date | | 5/3/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1974-10014
|
|
Description | | Clam Farm operation including beach rehabilitation and mooring and unloading facilities.
|
|
Last Name | | GUNSTONE JR
|
|
Received Date | | 5/1/1974 12:00:00 AM
|
|
Status | | E
|
|
| | |
|