Cases Associated with Parcel No: DISCOVERYBAY

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.



Case Number  XMP1999-00001
Description  Installation of a single buoy for anchorage of a personal vessel within the waters of the State.
Last Name  GRAHAM
Received Date  1/5/1999 12:00:00 AM
Status  Finaled
  

Case Number  XMP1996-00014
Description  To repair an existing bulk head to prevent damage to a residence.
Last Name  MCCLELLAND
Received Date  4/4/1996 12:00:00 AM
Status  E
  

Case Number  ENV1995-00011
Description  The Discovery Bay Watershed Mamagement Plan is a community - based resource plan to help manage non-point pollution. The water quality control strategy is submitted to comply with the regulations of WAC 400-12. The implementation strategy uses voluntary actions of the property owners to manage development of the watershed. Education and technical assistance will be provided to the community and volunteers through the Extension Service. The implementation strategy is not regulatory. The concept is to create a "bottom up approach" which will focus on widespread community education during the first six months and community based planning during the second six months. This approach has already been proven as ssuccessful in the Discovery Bay community.
Last Name  COOPERATIVE EXTENSION SERVICE
Received Date  10/26/1995 12:00:00 AM
Status  Finaled
  

Case Number  XMP1992-00036
Description  Routine maintenance of the marina access channel and the adjacent sediment bypass harvest area.
Last Name  CAPE GEORGE COLONY CLUB
Received Date  3/23/1992 12:00:00 AM
Status  E
  

Case Number  XMP1989-00027
Description  Testing an underwater cable embedment machine.
Last Name  JACOBSON BROTHERS INC.
Received Date  7/7/1989 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1988-00002
Description  PROPOSAL: The proposal is to extract and remove the rails, hardware, and ties from the railroad right-of-way from Junction City to Discovery Junction adjacent to Discovery Bay. The heavy equipment used, as well as the materials removed, will travel or be stored on the right-of-way. The old roadways paralleling the right-of-way will be restored, and the right-of-way will be cleared and regraded to natural conditions.
Last Name  RECOVERY, INC.
Received Date  1/7/1988 12:00:00 AM
Status  E
  

Case Number  SDP1987-10014
Description  Extension of northern jetty of the Cape George Marina and a sediment harvest.
Last Name  CAPE GEORGE COLONY CLUB
Received Date  12/7/1987 12:00:00 AM
Status  E
  

Case Number  XMP1986-00047
Description  Dock work - Replanking and stringer replacement.
Last Name  BRODERS
Received Date  12/2/1986 12:00:00 AM
Status  E
  

Case Number  XMP1986-00024
Description  Repair groin adjacent to the north channel of marina
Last Name  CAPE GEORGE COLONY CLUB
Received Date  6/9/1986 12:00:00 AM
Status  E
  

Case Number  XMP1986-00008
Description  Long line mussel cultivation proposal
Last Name  BRODERS
Received Date  3/4/1986 12:00:00 AM
Status  E
  

Case Number  XMP1986-00011
Description  Conduct an oyster growing test.
Last Name  MADSEN
Received Date  3/3/1986 12:00:00 AM
Status  E
  

Case Number  XMP1986-00012
Description  Temporary marking buoys in the water to locate salmon rearing test pen sites.
Last Name  SEA FARM OF NORWAY, INC.
Received Date  3/3/1986 12:00:00 AM
Status  E
  

Case Number  SDP1986-10003
Description  CONDUCT SALMON REARING TEST AT THE NORTHERN END OF DISCOVERY BAY
Last Name  SEA FARM OF NORWAY, INC
Received Date  1/29/1986 12:00:00 AM
Status  E
  

Case Number  SDP1978-10001
Description  Construct wood walkway for beach access
Last Name  EVANGELICAL METHODIST CHURCH INC
Received Date  1/12/1978 12:00:00 AM
Status  E
  

Case Number  SDP1976-10021
Description  Add approximately 90 feet of floating dock to present docking facility, gas dock, and 3 covered moorages.
Last Name  BARRETT
Received Date  5/3/1976 12:00:00 AM
Status  E
  

Case Number  SDP1974-10014
Description  Clam Farm operation including beach rehabilitation and mooring and unloading facilities.
Last Name  GUNSTONE JR
Received Date  5/1/1974 12:00:00 AM
Status  E