|
|
Case Number | | SQG2015-00197
|
|
Description | |
|
|
Last Name | | Lobo Del Mar
|
|
Received Date | | 12/8/2015 12:00:00 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | SDP1988-10018
|
|
Description | | REPAIR AND EXTEND TWO PIERS, AND TO CONSTRUCT A FLOATING DOCK ON PORT TOWNSEND BAY.
|
|
Last Name | | NEWELL
|
|
Received Date | | 7/7/2015 1:20:01 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | CAM2014-00133
|
|
Description | | What permits on these parcels - 15 minute CAM
|
|
Last Name | | PANZER
|
|
Received Date | | 3/3/2014 2:45:18 PM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SOM2013-01053
|
|
Description | | new septic installed under SEP13-00088. structures on 602 and 707, DF on 704
|
|
Last Name | | PANZER
|
|
Received Date | | 10/25/2013 1:32:13 PM
|
|
Status | | RCR
|
|
| | |
|
|
Case Number | | SEP2013-00088
See SOM case for current septic system activity.
|
|
Description | |
|
|
Last Name | | THANEM
|
|
Received Date | | 7/22/2013 10:51:03 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2013-00026
|
|
Description | | Shoreline Exemption for New Mooring Buoy #67 to be used for residential purposes only
|
|
Last Name | | THANEM
|
|
Received Date | | 5/14/2013 3:39:19 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2013-00025
|
|
Description | | Shoreline Exemption for Mooring Buoy #68 to be used for residential purposes only
|
|
Last Name | | THANEM
|
|
Received Date | | 5/14/2013 3:37:11 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2013-00024
|
|
Description | | Shoreline Exemption for replacement Mooring Buoy #69 for residential use only
|
|
Last Name | | THANEM
|
|
Received Date | | 5/14/2013 3:16:09 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2013-00023
|
|
Description | | Shoreline Exemption - for residential use only - Replacement Mooring Buoy #70
|
|
Last Name | | THANEM
|
|
Received Date | | 5/14/2013 3:06:38 PM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2013-00010
|
|
Description | | Propose to construct a single floating dock 6' x 80' to attach to an existing concrete pier connected by an aluminum ramp
|
|
Last Name | | THANEM
|
|
Received Date | | 4/11/2013 4:14:34 PM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2007-00029
|
|
Description | | Shoreline exemption to rebuild ramp and floats and flood development permit.
|
|
Last Name | | NEWELL
|
|
Received Date | | 4/16/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SEP2000-00117
See SOM case for current septic system activity.
|
|
Description | | Expired & Archieved, on 9/3/13
Scanned on 6/22/07
|
|
Last Name | | ARTHUR
|
|
Received Date | | 5/15/2000 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | SDP1975-10009
|
|
Description | | To repair pier and add to it one 74 foot long ramp with raising-lowering and mechanism at outer end of ramp, plus two 18 pile dolphins to hold barges in position while being unloaded.
|
|
Last Name | | COTTON
|
|
Received Date | | 5/5/1975 12:00:00 AM
|
|
Status | | E
|
|
| | |
|