Case Number | | SDP2018-00002
|
|
Description | | SHORELINE DEVELOPMENT- BULKHEAD REPAIR AND REBUILD-
REVIEW WITH BLD17-00558 & BLD17-00557
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 1/24/2018 7:38:02 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | BLD2018-00031
|
|
Description | | BULKHEAD REPAIR & REBUILD-
REVIEW WITH BLD17-00557
SHORELINE EXEMPTION
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 1/24/2018 7:35:35 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | BLD2017-00558
|
|
Description | | BULKHEAD REPAIR & REBUILD-
REVIEW WITH BLD17-00557
SHORELINE EXEMPTION
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 12/15/2017 1:21:57 PM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2017-00557
|
|
Description | | REMOVE DAMAGED AND STANDING SECTIONS OF 108 LF OF SOLDIER PILE- EXISTING CREOSOTE-TREATED WOOD PILES TO BE REPLACED WITH ROCK FOR ENVIRONMENTAL BENEFITS
& REPAIR 33 ABRADED WOOD SUPPORT PILES UNDER BUILDING BY INSTALLING CONCRETE JACKETS EXTENDING FROM PILE TOPS TO 2 FT. BELOW GRADE.
WITH SHORELINE EXEMPTION-
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 12/15/2017 12:36:38 PM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2017-00027
|
|
Description | | Remove and Replace damaged bulkhead
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 6/6/2017 1:39:21 PM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | ZON2016-00047
|
|
Description | | MOBILE FOOD TRUCK
|
|
Last Name | | HUIN
|
|
Received Date | | 7/16/2016 12:00:00 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | SEP2010-00146
See SOM case for current septic system activity.
|
|
Description | | Filed w/ SEP20-27
Transport line capped at both ends, permitted under SEP20-27. May be used in future.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 11/23/2010 12:00:00 AM
|
|
Status | | DCM
|
|
| | |
|
|
Case Number | | SEP2004-00305
See SOM case for current septic system activity.
|
|
Description | | Filed to SEP20-27. Tanks were left in place and connected to SEP20-27.
TRANSPORT LINE ONLY STILL IN PLACE
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN BOATBLD
|
|
Received Date | | 12/20/2004 12:00:00 AM
|
|
Status | | DCM
|
|
| | |
|
|
Case Number | | BLD2004-00607
|
|
Description | | Consistency Review with SEPA
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN BOATS
|
|
Received Date | | 9/28/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2004-00024
|
|
Description | | The Northwest School of Wooden Boat Building is proposing several modifications and expansions to the waterfront component of the newly remodeled and expanded campus. This waterfront proposal will include a public dock, gangway, public access boardwalk with observation platform, a mooring field and pump-out station. The proposal also includes the insertion of a concrete deadman to serve as a stabilization device for the buildings, removal of approximately 300-cubic yards of fill material and sea wall located between the two buildings, replacement of 78 creosote pilings with concrete pilings and restoration of the existing pier. The applicant proposes a 9-helical anchor screw mooring field, which encompasses a four (4) acre area located adjacent to the school facility. The pump-out station will allow use by vessels too large to access the Hadlock Marina facilities. The applicant is required to obtain the following permits:
-Shoreline Substantial Development Conditional Use Permit - Jefferson County
- Use Authorization Permit - Washington State DNR
- Hydraulic Project Approval - Washington State Dept. of Fish and Wildlife
- 401 Water Quality Certification- Washington State Dept. of Ecology
- Section 10 Permit- US Army Corps of Engineers
The Shoreline Permit is a Type III permit requiring public notice and a public hearing. The applicant has submitted detailed site plans and a biological evaluation for the proposal. State Environmental Review (SEPA) is required with the optional DNS process being used.
|
|
Last Name | | BROCK
|
|
Received Date | | 6/23/2004 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | ZON2004-00022
|
|
Description | | The public hearing has been cancelled due to the August 23, 2004 adoption of the UGA. The adoption established a new zoning district for the parcel, which allows for technical schools to be established without undergoing conditional use approval. The applicant has applied for a Conditional Use Permit to establish the NW School Heritage Campus. The proposal encompasses three (3) seperate phases for development. The total scope of work consists of construction of a parking lot, a pole building, and a vault toilet facility. This phase will utilize the upper portion of property and not include waterfront development. Phase II will include an addition to the waterfront Rudder Building and construction of a classroom, and metal shop on the upper portion of the property. Phase III includes an administration building and student housing/parking. The optional DNS process of WAC 197-11-355 was utilized and comments pertaining to SEPA were not received. A Final Determination of Non-Significance was issued on September 2, 2004. The applicant has submitted a geotechnical report to address the slope stability of the upper bench portion of their property.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN BOATS
|
|
Received Date | | 4/14/2004 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | PRE2003-00007
|
|
Description | | To temporary anchor a 60' x 15' dock seasonally in sounth Port Townsend Bay. The dock would be used as a location for the Wooden Boat Foundation's COmmunity Sailing Program. The dock would be located in 12 fathoms of water (MLLW datum), 300' directly offshore from docks and waterfront property owned by the NW School of Wooden Boat Building. The dock would be on location for 11 weeks, from JUne 15 through August 80 and secured with four anchors the dock is 70-ton concrete break water type structure manufactured by Bellingham Marine Industries.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 2/14/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2003-00006
|
|
Description | | First Phase of Improvement Projects on the waterfront and the upland 5-acre parcels
|
|
Last Name | | NW SCHOOL OF WOODEN BOAT BLDG
|
|
Received Date | | 1/23/2003 12:00:00 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SOM2001-00058
|
|
Description | | COMMERCIAL- drainfield on 989-400-603 that serves boat school on
989-400-702 & 703. see SOM2020-00027 for upper NW Boat School campus
|
|
Last Name | | JACKSON TRUSTEE
|
|
Received Date | | 5/31/2002 12:00:00 AM
|
|
Status | | RCR
|
|
| | |
|
|
Case Number | | SDP2002-10010
|
|
Description | | Revised Application for the erection of a Rubb THC (metal frames covered with PVL coated polyester membrane) 50'W x 70'L x 11'H sidewall temporary shelter for a period of two to three years. The proposal location has changed and the size of the temporary shelter has changed from 40 foot X 50 foot to 50 foot X 70 foot. This shelter will be used for boat construction and storage for the NW Wooden Boat School training program. There is no permanent construction planned for this leased property.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 5/30/2002 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | BLD2002-00156
|
|
Description | | TEMPORARY SHELTER
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 3/25/2002 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | SDP2002-00009
|
|
Description | | Shoreline Exemption for the repair and remodeling of a 3500 square foot wooden structure built in 1920. The previous owner used most of the building for storage, but with a small office and workshop. The building is being designed for Boat School classroom and shop activities. Interior construction includes totally new electrical, plumbing and heating. Restrooms will be ADA compliant. The classrooms and restroooms will be heated while the shop area remains unheated. Exterior repairs involve a new roof and porch, replacement of damaged siding, and relocation and addition of several windows and doors. The building will be ulilized for Boat School classroom and shop activites. There will also be replacement of a limited number of foundation beams, flooring and wall studs.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 2/28/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2002-00102
|
|
Description | | REMODEL RUTTER BUILDING - CHANGE USE TO BOAT SCHOOL CLASSROOM.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 2/27/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2001-00086
|
|
Description | | Repair of existing wooden structure and associated temporary boat shelters
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN
|
|
Received Date | | 12/21/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SEP2001-00058
See SOM case for current septic system activity.
|
|
Description | | Filed w/ SEP20-27. Drainfield for the wooden boat school buildings located on Water st.
|
|
Last Name | | NORTHWEST SCHOOL OF WOODEN BOATBLD
|
|
Received Date | | 4/20/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2000-00026
|
|
Description | | Building renovation.
|
|
Last Name | | SELL
|
|
Received Date | | 6/30/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE1994-00009
|
|
Description | | RESTAURANT, OFFICES, LIVING QUARTERS, SEAFOOD PROCESSING DOCK.
|
|
Last Name | | MARTIN
|
|
Received Date | | 3/17/1994 12:00:00 AM
|
|
Status | | M
|
|
| | |
|
|
|
Case Number | | XMP1980-00001
|
|
Description | | shoreline exemption - placement of a piling bulkhead and grading upland
|
|
Last Name | | KNUDSEN
|
|
Received Date | | 7/29/1980 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1980-00006
|
|
Description | | Piling bulkhead and grading of the upland
|
|
Last Name | | KNUDSEN
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|