|
Case Number | | SDP2009-00067
|
|
Description | | SHORELINE EXEMPTION AND FLOOD DEVELOPMENT PERMIT FOR MOORING BUOY.
|
|
Last Name | | BROWN
|
|
Received Date | | 8/17/2009 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1999-00029
|
|
Description | | The proposal is to construct a rip-rap rock bulkhead 110 ft. in length and 6 ft. in height. The bulkhead would protect an existing single family home located at Black Point on the Hood Canal.
|
|
Last Name | | MILLER
|
|
Received Date | | 7/20/1999 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | XMP1992-00042
|
|
Description | | CONSTRUCT 110 FT RIPRAP/CONCRETE BULKHEAD ALONG OHWM IN COMMON WITH SFR.
|
|
Last Name | | MILLER
|
|
Received Date | | 6/18/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
|
Case Number | | SOM1988-00114
|
|
Description | | EES Only.
|
|
Last Name | | MILLER
|
|
Received Date | | 7/20/1988 12:00:00 AM
|
|
Status | | RCR
|
|
| | |
|
|
Case Number | | SEP1988-00114
See SOM case for current septic system activity.
|
|
Description | | monitoring inspection only, no septic records on file
|
|
Last Name | | MILLER
|
|
Received Date | | 7/13/1988 12:00:00 AM
|
|
Status | | N
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1978-10018
|
|
Description | | Placement of private mooring bouys
|
|
Last Name | | COLLINS
|
|
Received Date | | 6/16/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1979-00025
|
|
Description | | Concrete ramp boat launch
|
|
Last Name | | CLEMENTS
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|