|
|
|
Case Number | | SEP1976-00139
See SOM case for current septic system activity.
|
|
Description | |
|
|
Last Name | | HARRISON
|
|
Received Date | | 1/15/1976 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SOM1976-00139
|
|
Description | |
|
|
Last Name | | HARRISON
|
|
Received Date | | 1/15/1976 12:00:00 AM
|
|
Status | | RNC
|
|
| | |
|
|
Case Number | | XMP1976-00008
|
|
Description | | Construction of a rock and cement bulkhead substantially along the line of ordinary high water to protect waterfront lot from further erosion.
|
|
Last Name | | AUSTIN
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1974-10004
|
|
Description | | To retain existing bulkhead and fill, place rock ripe rap from ground level of bulkhead to MHHW line on bulkhead
|
|
Last Name | | MUSIEL
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1974-10006
|
|
Description | | To retain existing bulkhead and fill, place rock rip-rap from ground level of bulkhead to the MHHW line on the bulkhead
|
|
Last Name | | AUSTIN
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|