|
Case Number | | SDP1976-10004
|
|
Description | | Replace fuel dock (wooden) with concrete float and 300 feet of concrete floats secured by 14 piles. Add another ramp and gangway at northerly end.
|
|
Last Name | | PORT TOWNSEND
|
|
Received Date | | 1/20/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|