Case Number | | IZA1993-00072
|
|
Description | | CELL TOWER
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/5/2020 11:04:26 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | CAM2019-00265
|
|
Description | | CELL TOWER - NEED TO ADD A GENERATOR- WILL BE GROUND WORK-
WHAT TYPE OF LAND USE PERMIT ARE REQUIRED- OR IS IT JUST A BUILDNG PERMIT-
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 5/9/2019 9:12:12 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | FPA2614438
|
|
Description | | 124 ac Harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/4/2016 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2614248
|
|
Description | | 65 ac Harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 5/16/2016 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2613798
|
|
Description | | 65 ACRE HARVEST, 3400 FT ROAD CONSTRUCTION, 2 NP INSTALL CULVERT PUNCHES
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/24/2015 3:03:11 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | OTH2010-00033
|
|
Description | | review for stormwater and water and septic
|
|
Last Name | | MOUNTAIN QUARRY
|
|
Received Date | | 3/30/2011 12:00:00 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | BLD2010-00054
|
|
Description | | The permitting action is the approval of a Stormwater Management Permit for a hard rock mining operation. The Applicant, Iron Mountain Quarry, proposes to conduct mining activities on the subject property in three (3) phases over approximately 40 years. The total project area is 142 acres; however, the first phase (Phase 1B) is approximately 69 acres and will include establishing the primary and secondary processing and stockpile areas, stormwater control ponds, a maintenance building and yard, and mining the southwest portion of the site. Mining for Phase 1B is expected to last approximately five to ten years. The second phase (Phase 1A) will mine the southeastern portion of the site, to the north of the stormwater control ponds. The third phase (Phase 2) will be to expand the Phase 1A area to the north, advancing generally from south to north. This permit approval is for Phase 1B only.
The mine will generally operate during the hours of 6:30 AM - 4:30 PM Monday through Friday, with occasional Saturday operations. Approximately eight to ten employees will work at the site. According to the application, the mine will initially produce about 290,000 tons annually. As the economy and demand improve, the total could reach 400,000 tons. Volume in the winter months would be between 8,000 and 16,000 tons per month and during the summer between 26,000 and 52,000 tons per month.
In addition to mining equipment, the new processing facility will contain rock conveyors and crushers, a scale house and a maintenance building. The scale house and the maintenance building will each have toilet facilities with an associated septic system; water will be provided via well. A well will also be used for water used in dust control.
The proposed action requires approval of a Stormwater Management Permit and issuance of a building permit by Jefferson County. It also requires the following permits from other agencies:
" Sand and Gravel General National Pollutant Discharge Elimination System (NPDES) permit by the Washington Department of Ecology,
" Surface Mining Permit by the Washington Department of Natural Resources,
" Air Permit from Olympic Region Clean Air Agency,
" Reclamation Permit by the Washington Department of Natural Resources,
" Forest Practices Permit by the Washington Department of Natural Resources,
" Jurisdictional Determination by the U.S. Army Corps of Engineers.
The following additional permits/approvals may be needed:
" Hydraulic Project Approval from the Washington Department of Fish and Wildlife,
" Section 404 Permit from the U.S. Army Corps of Engineers,
" Section 401 Water Quality from the Washington Department of Ecology,
" Developer Agreement from Washington State Department of Transportation
|
|
Last Name | | MOUNTAIN QUARRY
|
|
Received Date | | 2/25/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2009-00023
|
|
Description | | MINERAL RESORCE OPERATIONS ON 142 ACRE SITE
|
|
Last Name | | MOUNTAIN QUARRY
|
|
Received Date | | 7/20/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2008-00117
|
|
Description | | Stormwater w/SEPA: Stormwater Permit with SEPA: Fred Hill Material Inc. (FHM) leases from Pope Resources who owns the 72,000 acre Hood Canal Tree Farm. FHM mineral extraction and processing areas (referred to as the Shine Hub) totals 211.5 acres and is designated a Mineral Resource Overlay District (MRL).
The current proposal by FHM is to add 10 acres of additional mineral extraction area (pit area), adjacent to the Shine Hub. These areas would be comprised of two 5-acre segments (V & W). This would bring the total area to 221.5 acres currently regulated under a DNR Reclamation permit. This area has been logged by Pope Resources through Forest Practice Application (FPA). The additional pit area is located in a Commercial Forest designation, where mining is a permitted activity provided that no more than 10 acres is disturbed at any one time. Disturbed area is defined by RCW 78.44.031(5) and is determined by the WA State Department of Natural Resources through their Reclamation Permit.
The current mineral extraction is occurring in Segments R, S, T, & U where a good deposit of gravel had been located. This area is located behind a berm south of the Shine Hub. The proposed expansion (Segments V & W) are located north of Segments R, S, T, & U (see Reclamation Sequence Map). The extraction would start at the west boundary of the existing Shine Pit and continue eastward through two reclamation segments of approximately 5 acres each. The mining will utilize the cut-to-grade method. The grade of the mining slopes will "daylight" at the edge of the boundary of the new mining area, without a reclamation setback. The maximum depth of mining within this expansion will be approximately 50 feet. The finished floor of the mine will have a vertical separation of more than 100 feet above the seasonal high groundwater table (see cross sectional map for more details). Final reclamation will be done in a manner to emulate the natural sinuous lopes of the surrounding terrain. The final floor and finished slopes of the mine will be contoured to vary in elevation and be graded to naturally sweep into adjacent terrain. After the area is mined, stored topsoil would be spread over the area, forest debris spread over the area, a cover crop established, and then replanted with Douglas Fir for the subsequent use for timber production. It is anticipated that all of the mineral extraction (segments V & W) south of the Shine Hub would be reclaimed by winter of 2008 (per the Reclamation Sequence Map).
The Wahl Extraction area (approved through MLA03-377 on July 18, 2005) is located near Thorndyke Creek and its unnamed Tributary. The applicant has indicated that they are not seeking to mine within the Wahl Extraction Area at the present time because they want to obtain base line surface and groundwater monitoring data before mineral extraction occurs. This will help ensure that the impacts associated with mineral extraction can be separated from the natural hydraulic conditions.
Jefferson County has a Stormwater Permit to review and is the lead agency for the environmental review of the proposal under SEPA. Jefferson County is issuing a MDNS for this proposal.
The threshold determination for this proposal incorporates the Final Modified MDNS issued for Ace Paving Conditional Use Application (ZON 98-41) within the 144 acre mineral extraction and processing area, which was issued by Jefferson County DCD on June 1, 1999. Documents referenced in this notice are available the Jefferson County DCD during office hours.
The applicant will require an amended WA State DNR Reclamation Permit and an amended NPDES General Sand and Gravel permit from the WA State Department of Ecology.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 3/27/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2008-00032
|
|
Description | | COMP PLAN AMENDMENT~~THE PROPOSAL IS TO ESTABLISH A MRLO ON PARCELS DESIGNATED FOREST LANDS (MINERAL RESOURCE LAND OVERLAY)
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/29/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2007-00032
|
|
Description | | Develop and Operate a Hard Rock Quarry at the exiting Shine Quarry just north of SR 104 about 3 miles west of Shine.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/3/2007 12:00:00 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | FPA2608276
|
|
Description | | 460 acre fertilizer.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/7/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2608254
|
|
Description | | 120 acre chemical spray
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 1/24/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2002-00351
|
|
Description | | ANTENNA UPGRADE/REPLACEMENT OF EXISTING APPROVED FACILITY
|
|
Last Name | | AT&T WIRELESS SERVICES OF WA
|
|
Received Date | | 6/18/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2002-00049
|
|
Description | | Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 4/30/2002 12:00:00 AM
|
|
Status | | DAP
|
|
| | |
|
|
Case Number | | BLD1994-00410
|
|
Description | | Installation of prefabricated equipment shelter, communications tower & cellular antennas
|
|
Last Name | | CELLULAR ONE
|
|
Received Date | | 6/25/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|