Case Number | | CAM2022-00493
|
|
Description | | Current permitted mining operation that would like to expand operations by 15 acres. Operations would be conducted in phases with 10 acres of active mining occurring at a time. Please see attached documents for quick reference.
What is required to expand operations?
Can operations mine within the water table? If so what requirements will be needed for approval?
How long does the permitting process take?
|
|
Last Name | | MAHR
|
|
Received Date | | 11/9/2022 4:20:13 PM
|
|
Status | | Pending
|
|
| | |
|
|
Case Number | | ZON2022-00025
|
|
Description | | Consistency Review to determine if Forest Practice Application FPA 2617433 requires additional stormwater permitting
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/27/2022 2:42:50 PM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | FPA2616218
|
|
Description | | harvest 92.2 acres, 1000 ft road construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 9/30/2019 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2614438
|
|
Description | | 124 ac Harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/4/2016 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2613798
|
|
Description | | 65 ACRE HARVEST, 3400 FT ROAD CONSTRUCTION, 2 NP INSTALL CULVERT PUNCHES
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/24/2015 3:03:11 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2612076
|
|
Description | | 30 ac Harvest / 500ft Road Const.
Amendment 6/3/2014 - add approx. 6 acres of area to the Harvest / 150' new Road Const. witha crossing over type Ns Stream
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 10/26/2012 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2611886
|
|
Description | | 15-acre timber harvest and 300 feet of road construction.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 7/10/2012 10:22:24 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2611268
|
|
Description | | 470-acre spray.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 7/5/2011 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | OTH2010-00033
|
|
Description | | review for stormwater and water and septic
|
|
Last Name | | MOUNTAIN QUARRY
|
|
Received Date | | 3/30/2011 12:00:00 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | FPA2610932
|
|
Description | | 376-acre spray/fertilizer
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/14/2011 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2610872
|
|
Description | | 69-acre timber harvest and 700 feet of road construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 12/15/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2610783
|
|
Description | | One culvert removal: 12" x 30'
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 9/17/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2610650
|
|
Description | | 259-acre spray
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/2/2010 12:00:00 AM
|
|
Status | | INP
|
|
| | |
|
|
Case Number | | BLD2010-00054
|
|
Description | | The permitting action is the approval of a Stormwater Management Permit for a hard rock mining operation. The Applicant, Iron Mountain Quarry, proposes to conduct mining activities on the subject property in three (3) phases over approximately 40 years. The total project area is 142 acres; however, the first phase (Phase 1B) is approximately 69 acres and will include establishing the primary and secondary processing and stockpile areas, stormwater control ponds, a maintenance building and yard, and mining the southwest portion of the site. Mining for Phase 1B is expected to last approximately five to ten years. The second phase (Phase 1A) will mine the southeastern portion of the site, to the north of the stormwater control ponds. The third phase (Phase 2) will be to expand the Phase 1A area to the north, advancing generally from south to north. This permit approval is for Phase 1B only.
The mine will generally operate during the hours of 6:30 AM - 4:30 PM Monday through Friday, with occasional Saturday operations. Approximately eight to ten employees will work at the site. According to the application, the mine will initially produce about 290,000 tons annually. As the economy and demand improve, the total could reach 400,000 tons. Volume in the winter months would be between 8,000 and 16,000 tons per month and during the summer between 26,000 and 52,000 tons per month.
In addition to mining equipment, the new processing facility will contain rock conveyors and crushers, a scale house and a maintenance building. The scale house and the maintenance building will each have toilet facilities with an associated septic system; water will be provided via well. A well will also be used for water used in dust control.
The proposed action requires approval of a Stormwater Management Permit and issuance of a building permit by Jefferson County. It also requires the following permits from other agencies:
" Sand and Gravel General National Pollutant Discharge Elimination System (NPDES) permit by the Washington Department of Ecology,
" Surface Mining Permit by the Washington Department of Natural Resources,
" Air Permit from Olympic Region Clean Air Agency,
" Reclamation Permit by the Washington Department of Natural Resources,
" Forest Practices Permit by the Washington Department of Natural Resources,
" Jurisdictional Determination by the U.S. Army Corps of Engineers.
The following additional permits/approvals may be needed:
" Hydraulic Project Approval from the Washington Department of Fish and Wildlife,
" Section 404 Permit from the U.S. Army Corps of Engineers,
" Section 401 Water Quality from the Washington Department of Ecology,
" Developer Agreement from Washington State Department of Transportation
|
|
Last Name | | MOUNTAIN QUARRY
|
|
Received Date | | 2/25/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2609977
|
|
Description | | AMENDMENT approved on 2/23/2010 to add 800 feet of new road to reduce yarding distance during harvest and will be abandoned at end of harvest activity.
85-acre timber harvest and 450 feet of road construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 12/29/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2009-00023
|
|
Description | | MINERAL RESORCE OPERATIONS ON 142 ACRE SITE
|
|
Last Name | | MOUNTAIN QUARRY
|
|
Received Date | | 7/20/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2008-00032
|
|
Description | | COMP PLAN AMENDMENT~~THE PROPOSAL IS TO ESTABLISH A MRLO ON PARCELS DESIGNATED FOREST LANDS (MINERAL RESOURCE LAND OVERLAY)
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/29/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2007-00032
|
|
Description | | Develop and Operate a Hard Rock Quarry at the exiting Shine Quarry just north of SR 104 about 3 miles west of Shine.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/3/2007 12:00:00 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | FPA2608695
|
|
Description | | 311 acres of spray
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 7/19/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2608627
|
|
Description | | 12 acres of timber harvest, 350 feet of road construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/21/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2004-00355
|
|
Description | | The proposal is for the Shine Quarry to expand from 20 acres to 40 acres. A revised DNR Reclamation Permit is required. DNR will conduct SEPA for this proposal. A Stormwater Permit is required from Jefferson County.
|
|
Last Name | | LARRANCE
|
|
Received Date | | 6/2/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | FPA2605611
|
|
Description | | Aerial Chemical Application
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/18/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | OTH2003-00005
|
|
Description | | Filed to SEP01-65. WET SEASON EVALUATION
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 1/21/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2002-00049
|
|
Description | | Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 4/30/2002 12:00:00 AM
|
|
Status | | DAP
|
|
| | |
|
|
Case Number | | FPA2604540
|
|
Description | | Aerial chemical application. Pirpose of operation is to reduce competing vegetation in forest plantations. Not all chemicals are intended for use at the same time. We will use chemicals appropriate to unit conditions through out the FPA's validity. All guidelines for aerial application per per WAC will be observed.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 4/4/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2603738
|
|
Description | |
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/15/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2604135
|
|
Description | | Chemical application
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/15/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2001-00364
|
|
Description | | MAN HOME INSTALLATION FOR VISITOR CENTER
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/22/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2001-00365
|
|
Description | | PORCH & RAMP
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/22/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2601185
|
|
Description | |
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 11/14/1997 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1992-00293
|
|
Description | | commercial mobile office
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 5/12/1992 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|