Cases Associated with Parcel No: 821302001

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.

Parcel Tags

Case Number  CAM2022-00493
Description  Current permitted mining operation that would like to expand operations by 15 acres. Operations would be conducted in phases with 10 acres of active mining occurring at a time. Please see attached documents for quick reference. What is required to expand operations? Can operations mine within the water table? If so what requirements will be needed for approval? How long does the permitting process take?
Last Name   MAHR
Received Date  11/9/2022 4:20:13 PM
Status  Pending
  

Case Number  ZON2022-00025
Description  Consistency Review to determine if Forest Practice Application FPA 2617433 requires additional stormwater permitting
Last Name  POPE RESOURCES
Received Date  6/27/2022 2:42:50 PM
Status  CLS
  

Case Number  FPA2616218
Description  harvest 92.2 acres, 1000 ft road construction
Last Name  POPE RESOURCES
Received Date  9/30/2019 12:00:00 AM
Status  Finaled
  

Case Number  FPA2614438
Description  124 ac Harvest
Last Name  POPE RESOURCES
Received Date  8/4/2016 12:00:00 AM
Status  Finaled
  

Case Number  FPA2613798
Description  65 ACRE HARVEST, 3400 FT ROAD CONSTRUCTION, 2 NP INSTALL CULVERT PUNCHES
Last Name  POPE RESOURCES
Received Date  8/24/2015 3:03:11 PM
Status  Finaled
  

Case Number  FPA2612076
Description  30 ac Harvest / 500ft Road Const. Amendment 6/3/2014 - add approx. 6 acres of area to the Harvest / 150' new Road Const. witha crossing over type Ns Stream
Last Name  POPE RESOURCES
Received Date  10/26/2012 12:00:00 AM
Status  Finaled
  

Case Number  FPA2611886
Description  15-acre timber harvest and 300 feet of road construction.
Last Name  POPE RESOURCES
Received Date  7/10/2012 10:22:24 AM
Status  Finaled
  

Case Number  FPA2611268
Description  470-acre spray.
Last Name  POPE RESOURCES
Received Date  7/5/2011 12:00:00 AM
Status  Finaled
  

Case Number  OTH2010-00033
Description  review for stormwater and water and septic
Last Name  MOUNTAIN QUARRY
Received Date  3/30/2011 12:00:00 AM
Status  CLS
  

Case Number  FPA2610932
Description  376-acre spray/fertilizer
Last Name  POPE RESOURCES
Received Date  2/14/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610872
Description  69-acre timber harvest and 700 feet of road construction
Last Name  POPE RESOURCES
Received Date  12/15/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610783
Description  One culvert removal: 12" x 30'
Last Name  POPE RESOURCES
Received Date  9/17/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610650
Description  259-acre spray
Last Name  POPE RESOURCES
Received Date  8/2/2010 12:00:00 AM
Status  INP
  

Case Number  BLD2010-00054
Description  The permitting action is the approval of a Stormwater Management Permit for a hard rock mining operation. The Applicant, Iron Mountain Quarry, proposes to conduct mining activities on the subject property in three (3) phases over approximately 40 years. The total project area is 142 acres; however, the first phase (Phase 1B) is approximately 69 acres and will include establishing the primary and secondary processing and stockpile areas, stormwater control ponds, a maintenance building and yard, and mining the southwest portion of the site. Mining for Phase 1B is expected to last approximately five to ten years. The second phase (Phase 1A) will mine the southeastern portion of the site, to the north of the stormwater control ponds. The third phase (Phase 2) will be to expand the Phase 1A area to the north, advancing generally from south to north. This permit approval is for Phase 1B only. The mine will generally operate during the hours of 6:30 AM - 4:30 PM Monday through Friday, with occasional Saturday operations. Approximately eight to ten employees will work at the site. According to the application, the mine will initially produce about 290,000 tons annually. As the economy and demand improve, the total could reach 400,000 tons. Volume in the winter months would be between 8,000 and 16,000 tons per month and during the summer between 26,000 and 52,000 tons per month. In addition to mining equipment, the new processing facility will contain rock conveyors and crushers, a scale house and a maintenance building. The scale house and the maintenance building will each have toilet facilities with an associated septic system; water will be provided via well. A well will also be used for water used in dust control. The proposed action requires approval of a Stormwater Management Permit and issuance of a building permit by Jefferson County. It also requires the following permits from other agencies: " Sand and Gravel General National Pollutant Discharge Elimination System (NPDES) permit by the Washington Department of Ecology, " Surface Mining Permit by the Washington Department of Natural Resources, " Air Permit from Olympic Region Clean Air Agency, " Reclamation Permit by the Washington Department of Natural Resources, " Forest Practices Permit by the Washington Department of Natural Resources, " Jurisdictional Determination by the U.S. Army Corps of Engineers. The following additional permits/approvals may be needed: " Hydraulic Project Approval from the Washington Department of Fish and Wildlife, " Section 404 Permit from the U.S. Army Corps of Engineers, " Section 401 Water Quality from the Washington Department of Ecology, " Developer Agreement from Washington State Department of Transportation
Last Name  MOUNTAIN QUARRY
Received Date  2/25/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609977
Description  AMENDMENT approved on 2/23/2010 to add 800 feet of new road to reduce yarding distance during harvest and will be abandoned at end of harvest activity. 85-acre timber harvest and 450 feet of road construction
Last Name  POPE RESOURCES
Received Date  12/29/2009 12:00:00 AM
Status  Finaled
  

Case Number  PRE2009-00023
Description  MINERAL RESORCE OPERATIONS ON 142 ACRE SITE
Last Name  MOUNTAIN QUARRY
Received Date  7/20/2009 12:00:00 AM
Status  Finaled
  

Case Number  ZON2008-00032
Description  COMP PLAN AMENDMENT~~THE PROPOSAL IS TO ESTABLISH A MRLO ON PARCELS DESIGNATED FOREST LANDS (MINERAL RESOURCE LAND OVERLAY)
Last Name  POPE RESOURCES
Received Date  2/29/2008 12:00:00 AM
Status  Finaled
  

Case Number  PRE2007-00032
Description  Develop and Operate a Hard Rock Quarry at the exiting Shine Quarry just north of SR 104 about 3 miles west of Shine.
Last Name  POPE RESOURCES
Received Date  8/3/2007 12:00:00 AM
Status  M
  

Case Number  FPA2608695
Description  311 acres of spray
Last Name  POPE RESOURCES
Received Date  7/19/2007 12:00:00 AM
Status  Finaled
  

Case Number  FPA2608627
Description  12 acres of timber harvest, 350 feet of road construction
Last Name  POPE RESOURCES
Received Date  6/21/2007 12:00:00 AM
Status  Finaled
  

Case Number  BLD2004-00355
Description  The proposal is for the Shine Quarry to expand from 20 acres to 40 acres. A revised DNR Reclamation Permit is required. DNR will conduct SEPA for this proposal. A Stormwater Permit is required from Jefferson County.
Last Name  LARRANCE
Received Date  6/2/2004 12:00:00 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  FPA2605611
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  8/18/2003 12:00:00 AM
Status  Finaled
  

Case Number  OTH2003-00005
Description  Filed to SEP01-65. WET SEASON EVALUATION
Last Name  POPE RESOURCES
Received Date  1/21/2003 12:00:00 AM
Status  Finaled
  

Case Number  ZON2002-00049
Description  Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
Last Name  FRED HILL MATERIALS INC
Received Date  4/30/2002 12:00:00 AM
Status  DAP
  

Case Number  FPA2604540
Description  Aerial chemical application. Pirpose of operation is to reduce competing vegetation in forest plantations. Not all chemicals are intended for use at the same time. We will use chemicals appropriate to unit conditions through out the FPA's validity. All guidelines for aerial application per per WAC will be observed.
Last Name  POPE RESOURCES
Received Date  4/4/2002 12:00:00 AM
Status  Finaled
  

Case Number  FPA2603738
Description  
Last Name  POPE RESOURCES
Received Date  8/15/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604135
Description  Chemical application
Last Name  POPE RESOURCES
Received Date  8/15/2001 12:00:00 AM
Status  Finaled
  

Case Number  BLD2001-00364
Description  MAN HOME INSTALLATION FOR VISITOR CENTER
Last Name  POPE RESOURCES
Received Date  6/22/2001 12:00:00 AM
Status  Finaled
  

Case Number  BLD2001-00365
Description  PORCH & RAMP
Last Name  POPE RESOURCES
Received Date  6/22/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2601185
Description  
Last Name  POPE RESOURCES
Received Date  11/14/1997 12:00:00 AM
Status  Finaled
  

Case Number  BLD1992-00293
Description  commercial mobile office
Last Name  POPE RESOURCES
Received Date  5/12/1992 12:00:00 AM
Status  Finaled