Cases Associated with Parcel No: 801251001

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.

Parcel Tags

Case Number  CAM2022-00493
Description  Current permitted mining operation that would like to expand operations by 15 acres. Operations would be conducted in phases with 10 acres of active mining occurring at a time. Please see attached documents for quick reference. What is required to expand operations? Can operations mine within the water table? If so what requirements will be needed for approval? How long does the permitting process take?
Last Name   MAHR
Received Date  11/9/2022 4:20:13 PM
Status  Pending
  

Case Number  ADR2018-00063
Description  New Address address assigned 85 Shine Ridge Rd.
Last Name  SETON
Received Date  5/14/2018 1:43:31 PM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  FPA2615094
Description  Harvest 122.6 acres
Last Name  POPE RESOURCES
Received Date  9/11/2017 12:00:00 AM
Status  Finaled
  

Case Number  FPA2612202
Description  129-acre spray.
Last Name  POPE RESOURCES
Received Date  2/25/2013 2:14:19 PM
Status  Finaled
  

Case Number  FPA2612151
Description  AMENDED 3/20/13: Adjust the road approach to the T-1210 with 700 feet new construction by moving it to the west by approximately 100 feet. Coming off the existing road from our original FPA. 78-acre even-age timber harvest and 700 feet of road construction.
Last Name  POPE RESOURCES
Received Date  1/16/2013 10:58:07 AM
Status  Finaled
  

Case Number  FPA2611866
Description  93 ac Harvest / 1,050ft Road Const.
Last Name  POPE RESOURCES
Received Date  6/28/2012 9:51:24 AM
Status  Finaled
  

Case Number  FPA2611834
Description  9-acre timber harvest (even aged).
Last Name  POPE RESOURCES
Received Date  6/19/2012 12:00:00 AM
Status  INP
  

Case Number  FPA2611268
Description  470-acre spray.
Last Name  POPE RESOURCES
Received Date  7/5/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2611173
Description  17-acre timber harvest and 980 feet of road construction (See MLA11-54/BLD11-63 for stormwater permit w/SEPA)
Last Name  POPE RESOURCES
Received Date  5/24/2011 12:00:00 AM
Status  Finaled
  

Case Number  BLD2011-00063
Description  Stormwater Permit with SEPA: The proposal is to grade and construct improvements in the 18-acres lying adjacent to and north of the 156-acre Wahl Extraction Area. These 18-acres recently obtained a Mineral Resource Lands Overlay (MRLO) designation through the Jefferson County Comprehensive Plan Amendment process and is also the location for Miles' new Shine Facility. Prior to grading, the 18-acres will be logged by Pope Resources (land owner) as part of their commercial forestry business. The new portion of T-1000 is located in an area that has been recently logged by Pope Resources. The new Shine facility is proposed to access SR 104 from private Forestry Road T-1000. The intersection of T-1000 with SR 104 is proposed to be relocated to MP 8.52 (approximately 1800 feet west of its current location). This application also includes grading and constructing the new intersection at SR 104 and approximately 1,000 feet of new road from the WSDOT right-of-way to the exiting T-1000 road. Approximately 9,000 feet of the exiting T-1000 road to the new Shine Facility will follow the existing route and grades. The northernmost portion will be improved with an asphalt surface for approximately 7200 feet. Proposed grading within the new Shine Facility includes 365,600 cubic yards of cut and 5,000 cubic yards of fill (360,600 net cut). Significant grading is not anticipated on the T-1000 except for the northernmost 1,000 feet of the new access road located at the new intersection with SR 104. Grading quantities for this 1,000 foot section of T-1000 are estimated at 2,300 cubic yards of cut and 20,600 cubic yards of fill (18,300 cubic yards net fill). Water quantity management of stormwater associated with the new intersection with SR 104 and 1000 feet of new road will be through the use of an infiltration pond designed according to the 2005 Department of Ecology Stormwater Management Manual for Western Washington. The remaining improvements to T-1000 will not result in any new impervious surfaces; and therefore, do not require any new stormwater management. Existing ditches and culverts will be cleaned and maintained as necessary to ensure continuous drainage of the roadway. The north portion of the new Shine Facility will be graded and will continue to drain to the east through the existing drainage pattern. New buildings proposed for this area will require stormwater management and could include roof downspout infiltration. The southern portion of the new Shine Facility will be graded to drain to an infiltration pond located in the NE corner of the Wahl Extraction Area.
Last Name  MILES SAND & GRAVEL COMPANY
Received Date  3/21/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610932
Description  376-acre spray/fertilizer
Last Name  POPE RESOURCES
Received Date  2/14/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610872
Description  69-acre timber harvest and 700 feet of road construction
Last Name  POPE RESOURCES
Received Date  12/15/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610650
Description  259-acre spray
Last Name  POPE RESOURCES
Received Date  8/2/2010 12:00:00 AM
Status  INP
  

Case Number  FPA261050
Description  259-acre spray
Last Name  POPE RESOURCES
Received Date  7/21/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609977
Description  AMENDMENT approved on 2/23/2010 to add 800 feet of new road to reduce yarding distance during harvest and will be abandoned at end of harvest activity. 85-acre timber harvest and 450 feet of road construction
Last Name  POPE RESOURCES
Received Date  12/29/2009 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609454
Description  568 acre Aerial Chemical application
Last Name  POPE RESOURCES
Received Date  7/28/2008 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609086
Description  411 acres of chemical spray
Last Name  POPE RESOURCES
Received Date  2/8/2008 12:00:00 AM
Status  Finaled
  

Case Number  FPA2608695
Description  311 acres of spray
Last Name  POPE RESOURCES
Received Date  7/19/2007 12:00:00 AM
Status  Finaled
  

Case Number  FPA2608596
Description  7 acres of timber harvest, pit expansion
Last Name  POPE RESOURCES
Received Date  6/7/2007 12:00:00 AM
Status  Finaled
  

Case Number  FPA2608339
Description  2 acre timber harvest and salvage
Last Name  POPE RESOURCES
Received Date  3/13/2007 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607825
Description  3 acre harvest
Last Name  POPE RESOURCES
Received Date  6/28/2006 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607641
Description  835 acre arial chemical
Last Name  POPE RESOURCES
Received Date  4/6/2006 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607396
Description  Arial Chemical spray - 347 acres fertilizer. Several parcels associated with this project
Last Name  POPE RESOURCES
Received Date  12/20/2005 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607145
Description  116 acres of harvest.
Last Name  POPE RESOURCES
Received Date  8/17/2005 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607146
Description  74 acres of harvest.
Last Name  POPE RESOURCES
Received Date  8/17/2005 12:00:00 AM
Status  Finaled
  

Case Number  FPA2606708
Description  TIMBER HARVEST 74 AC. ROAD CONSTRUCTION
Last Name  POPE RESOURCES
Received Date  5/10/2005 12:00:00 AM
Status  INP
  

Case Number  FPA2606391
Description  Harvest of 503 acres.
Last Name  POPE RESOURCES
Received Date  10/15/2004 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605722
Description  Aerial chemical application
Last Name  POPE RESOURCES
Received Date  11/3/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605703
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  10/15/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605256
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  4/21/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605260
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  4/21/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605105
Description  Salvage Harvest
Last Name  POPE RESOURCES
Received Date  4/16/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604834
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  8/20/2002 12:00:00 AM
Status  Finaled
  

Case Number  ZON2002-00049
Description  Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
Last Name  FRED HILL MATERIALS INC
Received Date  4/30/2002 12:00:00 AM
Status  DAP
  

Case Number  FPA2604540
Description  Aerial chemical application. Pirpose of operation is to reduce competing vegetation in forest plantations. Not all chemicals are intended for use at the same time. We will use chemicals appropriate to unit conditions through out the FPA's validity. All guidelines for aerial application per per WAC will be observed.
Last Name  POPE RESOURCES
Received Date  4/4/2002 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604293
Description  Chemical application
Last Name  POPE RESOURCES
Received Date  12/5/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604030
Description  Even Age Harvest
Last Name  POPE RESOURCES
Received Date  6/13/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2603172
Description  Forest Practice Application Class IVS.
Last Name  POPE RESOURCES
Received Date  3/1/2000 12:00:00 AM
Status  Finaled
  

Case Number  FPA2602625
Description  Forest Practice Application.
Last Name  OLYMPIC RESOURCE MANAGEMENT
Received Date  6/17/1999 12:00:00 AM
Status  Finaled
  

Case Number  FPA2601207
Description  
Last Name  OLYMPIC RESOURCE MANAGEMENT
Received Date  12/1/1997 12:00:00 AM
Status  Finaled
  

Case Number  FPA2600291
Description  
Last Name  POPE RESOURCES
Received Date  12/16/1996 12:00:00 AM
Status  Finaled