Case Number | | CAM2022-00175
|
|
Description | | Specifically, whether a geo-technical report will be required for the development of the northwest corner of the property and any additional environmental reports. Also, the setback requirements from the top of the bluff and the stream that bisects the property.
|
|
Last Name | | DAGEN
|
|
Received Date | | 4/19/2022 8:27:29 AM
|
|
Status | | M
|
|
| | |
|
|
|
Case Number | | SDP2003-00007
|
|
Description | | Shoreline Permit Application to transport clean sand and gravel extracted from the Shine Pit to inland water markets.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 3/28/2003 12:00:00 AM
|
|
Status | | PIA
|
|
| | |
|
|
Case Number | | ZON2003-00017
|
|
Description | | Conditional Use Permit to build a Central Conveyor and Pier to move sand and gravel from the T-ROC Operations Hub to Hood Canal for marine transport by barges and ships. The proposed 4-mile Central Conveyor originates at the southwest corner of the Shine Pit, travels south through the Thorndyke Block), bridges over Thorndyke Road, crosses a 14.7 acre parcel of waterfront property and terminates at the end of the proposed 1,000 foot Pier on Hood Canal.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 3/28/2003 12:00:00 AM
|
|
Status | | Withdrawn
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2002-00012
|
|
Description | | The Thorndyke Conveyor Project provides a system to transport aggregate materials from an existing gravel pit located in Jefferson County on land owned by Pope Resources and leased by Fred Hill Materials (FHM) to a marine loadout facility on the northwest shore of Hood Canal, approximately 3 miles south of the Hood Canal Bridge. The conveyor system is approximately 3.9 miles in length, beginning at the existing sand and gravel site, the Shine Pit, and extending to the west shore of Hood Canal at the "Thorndyke" Property located in Section 19, Township 28N, Range 1E, WM. The proposed Project consists of two elements, the North Conveyor and the South Conveyor. Environmental conditions reports have been prepared for the proposed project. These reports include a Marine Resources Report, a Preliminary Geotechnical Report, a Wetlands Report, and a Habitat Management Plan. A Biological Assessment Plan will be prepared in the near future.
|
|
Last Name | | FRED HILL MATERIALS, INC
|
|
Received Date | | 2/19/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA0216435
|
|
Description | |
|
|
Last Name | | JOHN COOPER
|
|
Received Date | | 6/8/1996 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|