|
Case Number | | FPA2616293
|
|
Description | | harvest 12 acres
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 11/22/2019 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | CAM2018-00758
|
|
Description | | Questions re: subdivision of property into 80 acre pieces zoned CF-80 for residential use. Does it conflict with JCC 18.15.150?
|
|
Last Name | | BRACKETT
|
|
Received Date | | 11/21/2018 8:40:26 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | FPA2612621
|
|
Description | | 110 acre harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 1/27/2014 8:20:20 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2612699
|
|
Description | | 56 ac Harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 1/13/2014 8:48:44 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2612093
|
|
Description | | 124-acre even-aged timber harvest and 1600 feet of road construction.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 11/13/2012 8:29:51 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2611268
|
|
Description | | 470-acre spray.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 7/5/2011 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2610848
|
|
Description | | 67-acre timber harves and 900 feet of road construction.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 11/24/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2610504
|
|
Description | | 38-acre timber harvest and 400 feet of road construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 4/28/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2607937
|
|
Description | | 853.5 acre spray
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/21/2006 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2607344
|
|
Description | | FPA class III 36 acre timber harvest, 1000 ft road construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 11/9/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2605452
|
|
Description | | Aerial Chemical Application, Even-aged Harvest and Temporary Road Construction
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/24/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2605386
|
|
Description | | Aerial Chemical Application
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 5/29/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2605256
|
|
Description | | Aerial Chemical Application
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 4/21/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2605260
|
|
Description | | Aerial Chemical Application
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 4/21/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2003-00017
|
|
Description | | Conditional Use Permit to build a Central Conveyor and Pier to move sand and gravel from the T-ROC Operations Hub to Hood Canal for marine transport by barges and ships. The proposed 4-mile Central Conveyor originates at the southwest corner of the Shine Pit, travels south through the Thorndyke Block), bridges over Thorndyke Road, crosses a 14.7 acre parcel of waterfront property and terminates at the end of the proposed 1,000 foot Pier on Hood Canal.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 3/28/2003 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | FPA2604834
|
|
Description | | Aerial Chemical Application
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/20/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2002-00049
|
|
Description | | Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 4/30/2002 12:00:00 AM
|
|
Status | | DAP
|
|
| | |
|
|
Case Number | | PRE2002-00012
|
|
Description | | The Thorndyke Conveyor Project provides a system to transport aggregate materials from an existing gravel pit located in Jefferson County on land owned by Pope Resources and leased by Fred Hill Materials (FHM) to a marine loadout facility on the northwest shore of Hood Canal, approximately 3 miles south of the Hood Canal Bridge. The conveyor system is approximately 3.9 miles in length, beginning at the existing sand and gravel site, the Shine Pit, and extending to the west shore of Hood Canal at the "Thorndyke" Property located in Section 19, Township 28N, Range 1E, WM. The proposed Project consists of two elements, the North Conveyor and the South Conveyor. Environmental conditions reports have been prepared for the proposed project. These reports include a Marine Resources Report, a Preliminary Geotechnical Report, a Wetlands Report, and a Habitat Management Plan. A Biological Assessment Plan will be prepared in the near future.
|
|
Last Name | | FRED HILL MATERIALS, INC
|
|
Received Date | | 2/19/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2604029
|
|
Description | | Timber Harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/19/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2603854
|
|
Description | | CHEMICAL APPLICATION
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 4/11/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2602047
|
|
Description | | Renewal for road construction portion of original permit
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 12/21/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2601957
|
|
Description | | Forest practice application.
|
|
Last Name | | ALDANAJ
|
|
Received Date | | 9/1/1998 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|