Case Number  FPA2616293
Description  harvest 12 acres
Last Name  POPE RESOURCES
Received Date  11/22/2019 12:00:00 AM
Status  Finaled
  

Case Number  CAM2018-00758
Description  Questions re: subdivision of property into 80 acre pieces zoned CF-80 for residential use. Does it conflict with JCC 18.15.150?
Last Name  BRACKETT
Received Date  11/21/2018 8:40:26 AM
Status  M
LaserFiche Links  View LaserFiche Documents

Case Number  FPA2612621
Description  110 acre harvest
Last Name  POPE RESOURCES
Received Date  1/27/2014 8:20:20 AM
Status  Finaled
  

Case Number  FPA2612699
Description  56 ac Harvest
Last Name  POPE RESOURCES
Received Date  1/13/2014 8:48:44 AM
Status  Finaled
  

Case Number  FPA2612093
Description  124-acre even-aged timber harvest and 1600 feet of road construction.
Last Name  POPE RESOURCES
Received Date  11/13/2012 8:29:51 AM
Status  Finaled
  

Case Number  FPA2611268
Description  470-acre spray.
Last Name  POPE RESOURCES
Received Date  7/5/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610848
Description  67-acre timber harves and 900 feet of road construction.
Last Name  POPE RESOURCES
Received Date  11/24/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610504
Description  38-acre timber harvest and 400 feet of road construction
Last Name  POPE RESOURCES
Received Date  4/28/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607937
Description  853.5 acre spray
Last Name  POPE RESOURCES
Received Date  8/21/2006 12:00:00 AM
Status  Finaled
  

Case Number  FPA2607344
Description  FPA class III 36 acre timber harvest, 1000 ft road construction
Last Name  POPE RESOURCES
Received Date  11/9/2005 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605452
Description  Aerial Chemical Application, Even-aged Harvest and Temporary Road Construction
Last Name  POPE RESOURCES
Received Date  6/24/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605386
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  5/29/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605256
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  4/21/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605260
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  4/21/2003 12:00:00 AM
Status  Finaled
  

Case Number  ZON2003-00017
Description  Conditional Use Permit to build a Central Conveyor and Pier to move sand and gravel from the T-ROC Operations Hub to Hood Canal for marine transport by barges and ships. The proposed 4-mile Central Conveyor originates at the southwest corner of the Shine Pit, travels south through the Thorndyke Block), bridges over Thorndyke Road, crosses a 14.7 acre parcel of waterfront property and terminates at the end of the proposed 1,000 foot Pier on Hood Canal.
Last Name  FRED HILL MATERIALS INC
Received Date  3/28/2003 12:00:00 AM
Status  Withdrawn
  

Case Number  FPA2604834
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  8/20/2002 12:00:00 AM
Status  Finaled
  

Case Number  ZON2002-00049
Description  Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
Last Name  FRED HILL MATERIALS INC
Received Date  4/30/2002 12:00:00 AM
Status  DAP
  

Case Number  PRE2002-00012
Description  The Thorndyke Conveyor Project provides a system to transport aggregate materials from an existing gravel pit located in Jefferson County on land owned by Pope Resources and leased by Fred Hill Materials (FHM) to a marine loadout facility on the northwest shore of Hood Canal, approximately 3 miles south of the Hood Canal Bridge. The conveyor system is approximately 3.9 miles in length, beginning at the existing sand and gravel site, the Shine Pit, and extending to the west shore of Hood Canal at the "Thorndyke" Property located in Section 19, Township 28N, Range 1E, WM. The proposed Project consists of two elements, the North Conveyor and the South Conveyor. Environmental conditions reports have been prepared for the proposed project. These reports include a Marine Resources Report, a Preliminary Geotechnical Report, a Wetlands Report, and a Habitat Management Plan. A Biological Assessment Plan will be prepared in the near future.
Last Name  FRED HILL MATERIALS, INC
Received Date  2/19/2002 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604029
Description  Timber Harvest
Last Name  POPE RESOURCES
Received Date  6/19/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2603854
Description  CHEMICAL APPLICATION
Last Name  POPE RESOURCES
Received Date  4/11/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2602047
Description  Renewal for road construction portion of original permit
Last Name  POPE RESOURCES
Received Date  12/21/2000 12:00:00 AM
Status  Finaled
  

Case Number  FPA2601957
Description  Forest practice application.
Last Name  ALDANAJ
Received Date  9/1/1998 12:00:00 AM
Status  Finaled