|
|
Case Number | | PRE2021-00023
|
|
Description | | CMT FACILITY
|
|
Last Name | | OSTERMAN
|
|
Received Date | | 7/6/2021 8:24:39 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | ZON2021-00033
|
|
Description | | CODE INTERPRETATION - Lumber Mills Definition includes CMT mills.
|
|
Last Name | | OPG PROPERTIES LLC
|
|
Received Date | | 5/25/2021 8:57:26 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2614248
|
|
Description | | 65 ac Harvest
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 5/16/2016 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2009-00368
|
|
Description | | Stormwater Permit with SEPA: The proposal is a 24.7-acre expansion of Miles Sand and Gravel Company's Shine Facility. The expansion is comprised of Reclamation Segments Z1 (10 acres), Z2 (10 acres) and Z3 (4.7 acres). Sand and gravel will be extracted from this new acreage and then conveyed to existing facilities for processing.
Native material will be utilized to finish ground slopes in preparation for reclamation. The cut and fill method will be used at this site. Final grades will have a 2.5:1 (40%) average slope at mining boundaries.
West Shine Creek, approximately 0.75 miles east and some 200-feet lower than the acreage proposed, flows into Squamish Harbor, which lies approximately 1 mile east of the proposed expansion area. Pheasant Lake is approximately 0.75 miles southwest of the proposed expansion, Mud Lake lies approximately 0.60 miles south of the proposed expansion and Twin Lakes is approximately 0.40 miles west of the proposed expansion.
Depending on market demands, mining operators and aggregate truck operators at the Shine Facility, process and haul sand and gravel upwards to 24 hours a day, 7 days per week. Noise is generated by mining and processing equipment (i.e. loaders, bulldozers, rock crushers, wash plants, conveyors and other equipment) and haul trucks. A study of the noise level generated by the Shine Facility operations and received by the neighboring properties was done in October 2002 (Environalysis 2002). A supplemental study was done in 2004 when a new rock crusher was added to the operation (Environalysis 2004). Both studies confirmed that the operations at the Shine Pit (including extraction) do not exceed the Washington State Department of Ecology Noise Standards as adopted by Jefferson County Unified Development Code (UD) during any time of the day, night or weekend. A 48-hour Noise Monitoring study was conducted from June 27-29, 2006 (Environalysis, 2006). This study re-confirmed acceptable noise levels within the pit and therefore, implicitly on Shine and South Point Roads. Moving to this proposed mining area will not create noise not already generated by existing operations. Because of the location and surrounding topography of the proposed mining area, what noise (if any) neighboring properties receive from current mining extraction activities will likely be lowered.
Miles is currently working under Department of Ecology (DOE) San and Gravel Permit No. WAG 50-1120. This stormwater report covers a further expansion to Miles' Department of Natural Resources (DNR) Reclamation Permit, as required by DOE. As of May 2000, permit coverage was extended to Ace Paving Company for an asphalt batch plant located adjacent to and subleased from Miles. Ace Paving Company has subsequently received a separate permit, WAG 50-1237. Both Ace Paving and Miles will continue to monitor discharges from the Ace Paving portion of the permitted site. Stormwater generated within the Ace Paving permit area is discharged to process water ponds for the mining operation and is ultimately discharged to the northerly infiltration pond where infiltration to groundwater occurs. Miles monitors all discharges to groundwater that result from mining operations. All Stormwater generated on-site is infiltrated to groundwater per the existing permit. No discharge to surface water is anticipated at this project location. Type 1 Stormwater, generated off-site to the west, is also infiltrated on-site. Type 2 Stormwater from the actively mined portion of the project is infiltrated within the excavation area. Grading in the active mining area prevents stormwater from leaving the site, allowing infiltration for the entire area of exposed soils within the excavation area. Type 2 Stormwater from stockpile areas is intercepted and directed to the infiltration areas. Stormwater quality enhancement treats Type 3 Stormwater from the impervious areas surrounding the operations facilities. A sedimentatio
|
|
Last Name | | MILES SAND & GRAVEL CO
|
|
Received Date | | 10/28/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2008-00117
|
|
Description | | Stormwater w/SEPA: Stormwater Permit with SEPA: Fred Hill Material Inc. (FHM) leases from Pope Resources who owns the 72,000 acre Hood Canal Tree Farm. FHM mineral extraction and processing areas (referred to as the Shine Hub) totals 211.5 acres and is designated a Mineral Resource Overlay District (MRL).
The current proposal by FHM is to add 10 acres of additional mineral extraction area (pit area), adjacent to the Shine Hub. These areas would be comprised of two 5-acre segments (V & W). This would bring the total area to 221.5 acres currently regulated under a DNR Reclamation permit. This area has been logged by Pope Resources through Forest Practice Application (FPA). The additional pit area is located in a Commercial Forest designation, where mining is a permitted activity provided that no more than 10 acres is disturbed at any one time. Disturbed area is defined by RCW 78.44.031(5) and is determined by the WA State Department of Natural Resources through their Reclamation Permit.
The current mineral extraction is occurring in Segments R, S, T, & U where a good deposit of gravel had been located. This area is located behind a berm south of the Shine Hub. The proposed expansion (Segments V & W) are located north of Segments R, S, T, & U (see Reclamation Sequence Map). The extraction would start at the west boundary of the existing Shine Pit and continue eastward through two reclamation segments of approximately 5 acres each. The mining will utilize the cut-to-grade method. The grade of the mining slopes will "daylight" at the edge of the boundary of the new mining area, without a reclamation setback. The maximum depth of mining within this expansion will be approximately 50 feet. The finished floor of the mine will have a vertical separation of more than 100 feet above the seasonal high groundwater table (see cross sectional map for more details). Final reclamation will be done in a manner to emulate the natural sinuous lopes of the surrounding terrain. The final floor and finished slopes of the mine will be contoured to vary in elevation and be graded to naturally sweep into adjacent terrain. After the area is mined, stored topsoil would be spread over the area, forest debris spread over the area, a cover crop established, and then replanted with Douglas Fir for the subsequent use for timber production. It is anticipated that all of the mineral extraction (segments V & W) south of the Shine Hub would be reclaimed by winter of 2008 (per the Reclamation Sequence Map).
The Wahl Extraction area (approved through MLA03-377 on July 18, 2005) is located near Thorndyke Creek and its unnamed Tributary. The applicant has indicated that they are not seeking to mine within the Wahl Extraction Area at the present time because they want to obtain base line surface and groundwater monitoring data before mineral extraction occurs. This will help ensure that the impacts associated with mineral extraction can be separated from the natural hydraulic conditions.
Jefferson County has a Stormwater Permit to review and is the lead agency for the environmental review of the proposal under SEPA. Jefferson County is issuing a MDNS for this proposal.
The threshold determination for this proposal incorporates the Final Modified MDNS issued for Ace Paving Conditional Use Application (ZON 98-41) within the 144 acre mineral extraction and processing area, which was issued by Jefferson County DCD on June 1, 1999. Documents referenced in this notice are available the Jefferson County DCD during office hours.
The applicant will require an amended WA State DNR Reclamation Permit and an amended NPDES General Sand and Gravel permit from the WA State Department of Ecology.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 3/27/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2608289
|
|
Description | | 176 acre chemical spray
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/13/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2607039
|
|
Description | | 115 acre harverst
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/2/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2606391
|
|
Description | | Harvest of 503 acres.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 10/15/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2002-00049
|
|
Description | | Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
|
|
Last Name | | FRED HILL MATERIALS INC
|
|
Received Date | | 4/30/2002 12:00:00 AM
|
|
Status | | DAP
|
|
| | |
|
|
Case Number | | FPA2603556
|
|
Description | |
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 8/21/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2600814
|
|
Description | |
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 7/10/1997 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|