Parcel Tags

Case Number  ZON2021-00013
Description  TYPE V COMPREHENSIVE PLAN AMENDMENT - MINERAL RESOURCE OVERLAY. The Applicant requests an amendment to the Jefferson County Comprehensive Plan and Zoning Map to include land for Mineral Resources Land (MRL) overlay. MRL is used to “overlay” or designate the property as a mineral resource extraction area as an interim use. The underlying land use designation of Commercial Forestry (CF80) would still exist, and forestry would remain the subsequent use after mineral resource extraction and reclamation are complete. The amendment to the Jefferson County Comprehensive Plan and Zoning Map would allow the Applicant to seek the project-specific approvals for mineral resource extraction. The MRL overlay designation in this proposal will add approximately 200 acres to MRL overlay designated property at the locations shown on the map exhibits. The geographic area proposed for addition to the MRL overlay is located in the vicinity of existing MRL overlay areas, where there is an existing mineral extraction facility. Properties surrounding the proposed MRL overlay area are in forestry use. Future uses of the proposed MRL overlay, on an interim basis, are expected to include sand and gravel extraction and processing, which will coincide with existing forestry uses on areas not being actively mined. The proposed MRL overlay area is owned by Rayonier. Mineral resource extraction and associated activities within this area will be conducted by Miles Sand & Gravel Company.
Last Name  POPE RESOURCES
Received Date  3/1/2021 9:35:13 AM
Status  Pending
LaserFiche Links  View LaserFiche Documents

Case Number  PRE2021-00004
Description  Comprehensive Plan Amendment for Mineral Resource Land Overlay, Shine Wahl Mine Expansion
Last Name  POPE RESOURCES
Received Date  2/10/2021 11:18:36 AM
Status  M
LaserFiche Links  View LaserFiche Documents

Case Number  CAM2021-00018
Description  Discussion on expansion on the current Shine Wahl Mine, located at 1500 Wahl Lake Rd. What steps for the application? What information does the county need? Comp Plan amendment requirements?
Last Name  POPE RESOURCES
Received Date  1/20/2021 5:19:49 PM
Status  M
LaserFiche Links  View LaserFiche Documents

Case Number  FPA2615094
Description  Harvest 122.6 acres
Last Name  POPE RESOURCES
Received Date  9/11/2017 12:00:00 AM
Status  Finaled
  

Case Number  FPA2612765
Description  76 ac Harvest / 700ft Road Const. Amendment 3/24/2012 - fixing an error that occured when printing the original map - no additional acreage
Last Name  POPE RESOURCES
Received Date  2/4/2014 12:00:00 AM
Status  Finaled
  

Case Number  USR2013-00041
Description  PUBLIC WATER SUPPLY SANITARY CONTROL INSPECTION
Last Name  MILES SAND AND GRAVEL
Received Date  12/2/2013 2:23:02 PM
Status  Pending
  

Case Number  USR2012-00021
Description  NOW FILED WITH GROUP B MILES SAND AND GRAVEL New road on south side of 104, yellow gate, follow road to gravel operation on right, well on left. DECOMMISSIONING of USR12-17, (previous attempt to deepen existing well)
Last Name  POPE RESOURCES
Received Date  8/28/2012 2:56:13 PM
Status  Finaled
  

Case Number  FPA2611900
Description  AMENDMENT: add additional chemical (Drift Control Agent). 403-acre spray. (3 year approval).
Last Name  POPE RESOURCES
Received Date  7/17/2012 10:51:20 AM
Status  Finaled
  

Case Number  USR2012-00017
Description  NOW FILED WITH GROUP B MILES SAND AND GRAVEL new well for gravel operation. USR12-13 attempt at reconstruction didn't work. MAY BE PUBLIC WATER SUPPLY
Last Name  POPE RESOURCES
Received Date  7/5/2012 4:40:55 PM
Status  Approved
  

Case Number  USR2012-00013
Description  NOW FILED WITH GROUP B MILES SAND AND GRAVEL RECONSTRUCTION, possible public water supply for IMQ. (UNSUCCESSFUL, SEE USR13-21
Last Name  POPE RESOURCES
Received Date  5/29/2012 12:00:00 AM
Status  Approved
  

Case Number  FPA2611568
Description  AMENDMENT: Approved by DNR 4/27/12 (extend the T-2102 an additional 300 feet). 107-acre timber harvest; 2050 feet of road construction & 1 culvert installation.
Last Name  POPE RESOURCES
Received Date  1/25/2012 12:00:00 AM
Status  Finaled
  

Case Number  FPA2611396
Description  One culvert replacement (Thorndyke Creek)
Last Name  POPE RESOURCES
Received Date  8/18/2011 12:00:00 AM
Status  Finaled
  

Case Number  BLD2011-00171
Description  PROPOSAL: Miles Sand & Gravel Co. (MS&G) has submitted a Type I Stormwater Permit subject to the State Environmental Policy Act (SEPA) to revise the sequence of mining in the existing Wahl Lake Extraction Mineral Resource Land Overlay (MRLO) as originally approved under MLA03-00377 on July 19, 2005 to commence mining operations within a 165- acre Mineral Resource Land Overlay referred as the Wahl Extraction Area.
Last Name  MILES SAND & GRAVEL COMPANY
Received Date  6/29/2011 12:00:00 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  PRE2011-00016
Description  PRE APPLICATION TO INSTALL ASPHALT & CONCRETE BATCH PLANTS
Last Name  POPE RESOURCES
Received Date  6/29/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2611173
Description  17-acre timber harvest and 980 feet of road construction (See MLA11-54/BLD11-63 for stormwater permit w/SEPA)
Last Name  POPE RESOURCES
Received Date  5/24/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2611125
Description  43-acre timber harvest
Last Name  POPE RESOURCES
Received Date  5/10/2011 12:00:00 AM
Status  Finaled
  

Case Number  BLD2011-00063
Description  Stormwater Permit with SEPA: The proposal is to grade and construct improvements in the 18-acres lying adjacent to and north of the 156-acre Wahl Extraction Area. These 18-acres recently obtained a Mineral Resource Lands Overlay (MRLO) designation through the Jefferson County Comprehensive Plan Amendment process and is also the location for Miles' new Shine Facility. Prior to grading, the 18-acres will be logged by Pope Resources (land owner) as part of their commercial forestry business. The new portion of T-1000 is located in an area that has been recently logged by Pope Resources. The new Shine facility is proposed to access SR 104 from private Forestry Road T-1000. The intersection of T-1000 with SR 104 is proposed to be relocated to MP 8.52 (approximately 1800 feet west of its current location). This application also includes grading and constructing the new intersection at SR 104 and approximately 1,000 feet of new road from the WSDOT right-of-way to the exiting T-1000 road. Approximately 9,000 feet of the exiting T-1000 road to the new Shine Facility will follow the existing route and grades. The northernmost portion will be improved with an asphalt surface for approximately 7200 feet. Proposed grading within the new Shine Facility includes 365,600 cubic yards of cut and 5,000 cubic yards of fill (360,600 net cut). Significant grading is not anticipated on the T-1000 except for the northernmost 1,000 feet of the new access road located at the new intersection with SR 104. Grading quantities for this 1,000 foot section of T-1000 are estimated at 2,300 cubic yards of cut and 20,600 cubic yards of fill (18,300 cubic yards net fill). Water quantity management of stormwater associated with the new intersection with SR 104 and 1000 feet of new road will be through the use of an infiltration pond designed according to the 2005 Department of Ecology Stormwater Management Manual for Western Washington. The remaining improvements to T-1000 will not result in any new impervious surfaces; and therefore, do not require any new stormwater management. Existing ditches and culverts will be cleaned and maintained as necessary to ensure continuous drainage of the roadway. The north portion of the new Shine Facility will be graded and will continue to drain to the east through the existing drainage pattern. New buildings proposed for this area will require stormwater management and could include roof downspout infiltration. The southern portion of the new Shine Facility will be graded to drain to an infiltration pond located in the NE corner of the Wahl Extraction Area.
Last Name  MILES SAND & GRAVEL COMPANY
Received Date  3/21/2011 12:00:00 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  FPA2610650
Description  259-acre spray
Last Name  POPE RESOURCES
Received Date  8/2/2010 12:00:00 AM
Status  INP
  

Case Number  FPA261050
Description  259-acre spray
Last Name  POPE RESOURCES
Received Date  7/21/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610504
Description  38-acre timber harvest and 400 feet of road construction
Last Name  POPE RESOURCES
Received Date  4/28/2010 12:00:00 AM
Status  Finaled
  

Case Number  ZON2010-00026
Description  COMP PLAN AMENDMENT
Last Name  POPE RESOURCES
Received Date  3/1/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610348
Description  33-acre timber harvest and 400 feet of road construction
Last Name  POPE RESOURCES
Received Date  1/27/2010 12:00:00 AM
Status  Finaled
  

Case Number  FPA2610302
Description  26-acre timber harvest and 950 feet of road construction
Last Name  POPE RESOURCES
Received Date  12/30/2009 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609454
Description  568 acre Aerial Chemical application
Last Name  POPE RESOURCES
Received Date  7/28/2008 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609166
Description  705 acres of chemical spray
Last Name  POPE RESOURCES
Received Date  3/13/2008 12:00:00 AM
Status  Finaled
  

Case Number  FPA2609164
Description  22 acres of timber harvest
Last Name  POPE RESOURCES
Received Date  3/12/2008 12:00:00 AM
Status  Finaled
  

Case Number  FPA2608192
Description  108 acre timber harvest, 905 ft rd construction
Last Name  POPE RESOURCES
Received Date  12/8/2006 12:00:00 AM
Status  Finaled
  

Case Number  FPA2606611
Description  Harvest of 22 acres
Last Name  POPE RESOURCES
Received Date  4/6/2005 12:00:00 AM
Status  INP
  

Case Number  FPA2606496
Description  Harvest of 22 acres for pit expansion (Wahl Lake)
Last Name  POPE RESOURCES
Received Date  1/10/2005 12:00:00 AM
Status  Denied
  

Case Number  FPA2605703
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  10/15/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605611
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  8/18/2003 12:00:00 AM
Status  Finaled
  

Case Number  BLD2003-00524
Description  LOCATION: Fred Hill Materials Inc. (FHM) has submitted a proposal on 165 acres referred as the Wahl Extraction Area. The 165 acres in portions of Section 1, Township 27 North, Range 1 West, lying approximately 1.25 miles west of the existing Shine Hub operated by FHM. The permit area includes a proposed 137-acre mining/excavation area, 19 acres identified as regulated critical areas and/or required mining setback areas, and a 60 foot easement from the extraction area to the Shine Hub that would total 9 acres. COMPREHENSIVE PLAN: The 165 acre area is designated Commercial Forest by the Jefferson County Comprehensive Plan. This area is also designated as Mineral Resource Lands Overlay (MRL) by Jefferson County's adoption of Ordinance 08-0706-04 on July 6, 2004, and is subject to 15 conditions of approval governing any activities conducted within the MRL. CASE HISTORY: This proposal was received on July 3, 2003. The case was placed on hold to wait for the issue related to the Comprehensive Plan Amendment (CPA) for a MRL (MLA 02-235) to be resolved. On October 14, 2004 the Western Washington Growth Management Hearings Board determined that the CPA for a MRL was in compliance with SEPA and the Growth Management Act. The application was taken off hold after the Hearing's Board decision. The application was routed on December 23, 2004 to agencies with jurisdiction and interested parties. A Threshold Determination of a Mitigated Determination of Non-Significance (MDNS) was issued on March 30, 2005. Based on comments received regarding impacts to the hydrology to Thorndyke Creek, the SEPA Responsible Official withdrew the MDNS in a Memo dated May 12, 2005. When the threshold determination was withdrawn, this in effect put the proposal at the very first step of SEPA, which is having to issue a Threshold Determination. The May 12, 2005 Memo also indicated that the current proposal would result in probable significant adverse impacts to groundwater movement, quality, and quality, which would result in a Determination of Significance. WAC 197-11-350(2) & (6) indicates that an applicant should be informed that a Determination of Significance is likely and be provided an opportunity to change a proposal to address the issues that consider a Determination of Significance. On June 1, 2005 an on-site meeting was held with DCD, The Port Gamble S'Klallam Tribe, WA State Department of Fish & Wildlife and the applicant to examine issues related to impacts that mining would have on the hydrology of Thorndyke Creek and a unnamed tributary to. Part of the concern expressed was that there was no site specific data that documented the relationship between surface and groundwater to in-stream flows. Also, there was not field documentation on how long it took water to pass through the material found within the Wahl Extraction area. In addition, although the MRL was 500 feet from Thorndyke Creek, mineral extraction was proposed approximately 200 feet within the riparian zone of unnamed tributary to Thorndyke creek. The applicant has modified their proposal to re-sequence the areas to be mined by starting near center of the MRL at the eastern edge instead of the southeastern corner (See Reclamation Sequence Map dated June 17, 2005). This would move the initial mining areas from 200 to 500 feet from the riparian fringe of the unnamed tributary. In addition, and would change the timing of when the area closest to the unnamed tributary from the first to the last area to be mined, contingent on the results from the monitoring data. Group 2 is not be part of this stormwater permit and would not occur for at least five years and would allow the review groundwater monitoring data that had been developed per condition 15.08-0706-04 The final area to be mined (Group 3) would be the area closest to the unnamed tributary and would not occur until approximately 10 years of monitoring data was collected. The groundwater monitorin
Last Name  FRED HILL MATERIALS INC
Received Date  7/3/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605386
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  5/29/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2605372
Description  Aerial Chemical Application and Even-aged Harvest
Last Name  POPE RESOURCES
Received Date  5/19/2003 12:00:00 AM
Status  Finaled
  

Case Number  PRE2003-00014
Description  To construct a 1.25-mile conveyor to move sand and gravel from a new mining extraction area to the existing Shine Pit. The conveyor will be located in a 9-acre easement and the Wahl Extraction Area will be a 156-acre permit. All areas are located in a mineral resource land overlay.
Last Name  FRED HILL MATERIALS
Received Date  3/28/2003 12:00:00 AM
Status  Finaled
  

Case Number  FPA2603640
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  10/22/2002 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604925
Description  Aerial Chemical Application
Last Name  POPE RESOURCES
Received Date  9/26/2002 12:00:00 AM
Status  Finaled
  

Case Number  ZON2002-00049
Description  Comprehensive Plan Land Use Map designation of approximately 6,240 acres as Mineral Resource Overlay District.
Last Name  FRED HILL MATERIALS INC
Received Date  4/30/2002 12:00:00 AM
Status  DAP
  

Case Number  FPA2604135
Description  Chemical application
Last Name  POPE RESOURCES
Received Date  8/15/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2604058
Description  Road Construction for access to future conveyor belt and future gravel mining
Last Name  POPE RESOURCES
Received Date  6/19/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2603857
Description  
Last Name  POPE RESOURCES
Received Date  4/18/2001 12:00:00 AM
Status  Finaled
  

Case Number  FPA2602017
Description  Forest practice application.
Last Name  POPE RESOURCES
Received Date  10/21/1998 12:00:00 AM
Status  Finaled