|
Case Number | | FPA2611894
|
|
Description | | 101.1 ac Harvest / Stream Crossing 6 / 7,980ft Road Const.
RENEWAL - Effective 8/8/2014 / Expiration 8/8/2017
|
|
Last Name | | RAYONIER TMBLND OPER CO L P
|
|
Received Date | | 7/9/2012 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2611829
|
|
Description | | 165.5-acre timber harvest and 4510 feet of road construction.
|
|
Last Name | | RAYONIER TMBLND OPER CO L P
|
|
Received Date | | 6/19/2012 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2611765
|
|
Description | | 6/8/12: Application DENIED by DNR. The water type modification submitted with the FPA does not match the information submitted in the FPA. During the Water Type Review Team Meeting 6/7/12, the team disagreed with the Water Type Modification. The streams are not correctly mapped and it is unclear if the typing is adequate due to the lack of info for the streams being typed.
165.5-acre timber harvest and 4510 feet of road construction; replace 3 culverts and remove one culvert.
|
|
Last Name | | RAYONIER TMBLND OPER CO L P
|
|
Received Date | | 5/15/2012 12:00:00 AM
|
|
Status | | Denied
|
|
| | |
|
|
Case Number | | FPA2611570
|
|
Description | | 165.5-acre timber harvest; 4510 feet of road construction; 2 culvert replacements & 1 culvert removal.
|
|
Last Name | | RAYONIER TMBLND OPER CO L P
|
|
Received Date | | 1/25/2012 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | FPA2606457
|
|
Description | | Harvest if 175.5 acres and 5930 ft of road. permit renewed 12/06. Permit renewed 12/08.
|
|
Last Name | | RAYONIER TMBLND OPER CO L P
|
|
Received Date | | 12/7/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2606346
|
|
Description | | Harvest of 54.3 acres and 1500 ft of road.
|
|
Last Name | | RAYONIER TMBLND OPER CO L P
|
|
Received Date | | 9/20/2004 12:00:00 AM
|
|
Status | | INP
|
|
| | |
|