Cases Associated with Parcel No: 601072011

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.



Case Number  BLD1999-00678
Description  Nursery building at Hatchery
Last Name  WA ST DOF
Received Date  10/8/1999 12:00:00 AM
Status  Finaled
  

Case Number  SDP1999-10003
Description  Replace a damaged vinyl structure and roof that covers an existing concrete slab. Replacement will be a conventional stick-framed wooden structure with colored metal siding and roofing. The structure will be sized at approximately 62' x 26' in plan, with a height of 17.25' above grade. The principal use of the structure will be to provide space for shellfish rearing equipment as an aquaculture facility.
Last Name  WA ST FISH & WILDLIFE
Received Date  3/23/1999 12:00:00 AM
Status  E
  

Case Number  XMP1998-00034
Description  Project repairs the existing septic system at the Pt. Whitney Shellfish Laboratory. Existing system will be abandoned in-place. Project includes installation of a new septic tank for the lab and admin. bldg., new septic tank for the interpretive center, and a new pump vault to the new drainfield.
Last Name  WA ST DOF
Received Date  7/16/1998 12:00:00 AM
Status  E
  

Case Number  SEP1998-00126
See SOM case for current septic system activity.
Description  SEP78-44 and SEP80-81 now filed here
Last Name  WA ST FISH & WILDLIFE
Received Date  6/3/1998 12:00:00 AM
Status  Finaled
  

Case Number  XMP1998-00009
Description  install three concrete slabs for emergency generator, electrical service panels, and two 500 gallon diesel fuel storage tanks
Last Name  WA ST FISH & WILDLIFE
Received Date  3/12/1998 12:00:00 AM
Status  E
  

Case Number  BLD1998-00145
Description  construct three concrete slabs for 2-500gal aboveground diesel storage tanks and 150 kw generator.
Last Name  WA ST DOF
Received Date  3/11/1998 12:00:00 AM
Status  Finaled
  

Case Number  XMP1996-00073
Description  Place 120 3.5' X 1'mesh bags into intertidal area to use for manila clam seed nursery during the winter 1996-1997.
Last Name  WA ST FISH & WILDLIFE
Received Date  10/16/1996 12:00:00 AM
Status  E
  

Case Number  BLD1996-00072
Description  Install new 1000 gal concrete fuel tank on concrete pad to provide heating oil to furnace in lab bldg.
Last Name  WA ST FISH & WILDLIFE
Received Date  2/14/1996 12:00:00 AM
Status  Finaled
  

Case Number  XMP1996-00003
Description  Install new 1000 gal concrete fuel tank on concrete pad to provide heating oil to furnace in lab bldg.
Last Name  WA ST FISH & WILDLIFE
Received Date  1/29/1996 12:00:00 AM
Status  E
  

Case Number  BLD1994-00732
Description  Rehabilitation of existing shellfish lab
Last Name  WA ST FISH & WILDLIFE
Received Date  10/20/1994 12:00:00 AM
Status  Finaled
  

Case Number  BLD1994-00704
Description  Residential Demolition
Last Name  WA ST DO CORRECTIONS
Received Date  10/6/1994 12:00:00 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  BLD1993-00317
Description  pole building for vehicle storage
Last Name  WA ST FISH&WILDLIFE
Received Date  5/17/1993 12:00:00 AM
Status  Finaled
  

Case Number  BLD1991-00381
Description  pole building - storage only
Last Name  WA ST FISH & WILDLIFE
Received Date  6/13/1991 12:00:00 AM
Status  Finaled
  

Case Number  XMP1989-00009
Description  PROPOSAL: To test a boat-mounted hydraulic/airlift clam harvester for use in harvesting juvenile razor clams for transplanting. The testing would be videotaped. There would be a maximum of 20 hours on-bottom times between mid-April and mid-May 1989.
Last Name  STATE DEPT OF FISH & WILDLIFE
Received Date  5/4/1989 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1989-00005
Description  PROPOSAL: The project is to construct a fuel tank storage shed with a containment dike for heating oil at the Point Whitney Shellfish Laboratory in Brinnon.
Last Name  STATE DEPT OF FISHERIES
Received Date  2/3/1989 12:00:00 AM
Status  E
  

Case Number  XMP1988-00009
Description  PROPOSAL: The proposal is to repair the dike surrounding the saltwater ponds at the Point Whitney Shellfish Laboratory 4.5 miles northeast of Brinnon on the western side of Dabob Bay. The repairs will consist of grading, filling, and rip-rapping the pond side of the dike.
Last Name  WA ST DOF
Received Date  3/17/1988 12:00:00 AM
Status  E