Case Number | | BLD1999-00678
|
|
Description | | Nursery building at Hatchery
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 10/8/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1999-10003
|
|
Description | | Replace a damaged vinyl structure and roof that covers an existing concrete slab. Replacement will be a conventional stick-framed wooden structure with colored metal siding and roofing. The structure will be sized at approximately 62' x 26' in plan, with a height of 17.25' above grade. The principal use of the structure will be to provide space for shellfish rearing equipment as an aquaculture facility.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 3/23/1999 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1998-00034
|
|
Description | | Project repairs the existing septic system at the Pt. Whitney Shellfish Laboratory. Existing system will be abandoned in-place. Project includes installation of a new septic tank for the lab and admin. bldg., new septic tank for the interpretive center, and a new pump vault to the new drainfield.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 7/16/1998 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SEP1998-00126
See SOM case for current septic system activity.
|
|
Description | | SEP78-44 and SEP80-81 now filed here
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 6/3/1998 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1998-00009
|
|
Description | | install three concrete slabs for emergency generator, electrical service panels, and two 500 gallon diesel fuel storage tanks
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 3/12/1998 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1998-00145
|
|
Description | | construct three concrete slabs for 2-500gal aboveground diesel storage tanks and 150 kw generator.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 3/11/1998 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1996-00073
|
|
Description | | Place 120 3.5' X 1'mesh bags into intertidal area to use for manila clam seed nursery during the winter 1996-1997.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 10/16/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1996-00072
|
|
Description | | Install new 1000 gal concrete fuel tank on concrete pad to provide heating oil to furnace in lab bldg.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 2/14/1996 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1996-00003
|
|
Description | | Install new 1000 gal concrete fuel tank on concrete pad to provide heating oil to furnace in lab bldg.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 1/29/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1994-00732
|
|
Description | | Rehabilitation of existing shellfish lab
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 10/20/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
|
Case Number | | BLD1993-00317
|
|
Description | | pole building for vehicle storage
|
|
Last Name | | WA ST FISH&WILDLIFE
|
|
Received Date | | 5/17/1993 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1991-00381
|
|
Description | | pole building - storage only
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 6/13/1991 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1989-00009
|
|
Description | | PROPOSAL: To test a boat-mounted hydraulic/airlift clam harvester for use in harvesting juvenile razor clams for transplanting. The testing would be videotaped. There would be a maximum of 20 hours on-bottom times between mid-April and mid-May 1989.
|
|
Last Name | | STATE DEPT OF FISH & WILDLIFE
|
|
Received Date | | 5/4/1989 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1989-00005
|
|
Description | | PROPOSAL: The project is to construct a fuel tank storage shed with a containment dike for heating oil at the Point Whitney Shellfish Laboratory in Brinnon.
|
|
Last Name | | STATE DEPT OF FISHERIES
|
|
Received Date | | 2/3/1989 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1988-00009
|
|
Description | | PROPOSAL: The proposal is to repair the dike surrounding the saltwater ponds at the Point Whitney Shellfish Laboratory 4.5 miles northeast of Brinnon on the western side of Dabob Bay. The repairs will consist of grading, filling, and rip-rapping the pond side of the dike.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 3/17/1988 12:00:00 AM
|
|
Status | | E
|
|
| | |
|