|
Case Number | | BLD2009-00183
|
|
Description | | REPLACE (4) CREOSOTE PILINGS W/(4) CHEMONITE PILINGS
|
|
Last Name | | QUATSAP POINT LLC
|
|
Received Date | | 6/22/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2008-00088
|
|
Description | | Shoreline Exemption and Flood Development Permit to replace 4 existing creosote pilings with 4 chemonite pilings on existing dock.
|
|
Last Name | | QUATSAP POINT LLC
|
|
Received Date | | 12/18/2008 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2003-00026
|
|
Description | | Proposed to replace two (2) deteriotated piling on existing dock. The current pilings are deteriorated and require replacement. The applicant is proposing to remove the creosote pilings and replace them with Chemonite treated piliings. This proposal is classifed as a Shoreline Exemption pursuant to 3.402(6). In addition, this proposal is exempt from review under the State Environmental Policy Act pursuant to WAC 197-11-800(3).
|
|
Last Name | | SCHACHT, ATTORNEY IN FACT
|
|
Received Date | | 8/1/2003 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1979-10012
|
|
Description | | Construct a boat ramp and install a float structure
|
|
Last Name | | UDDENBERG
|
|
Received Date | | 8/30/1979 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SEP1975-00490
See SOM case for current septic system activity.
|
|
Description | |
|
|
Last Name | | UDDENBERG
|
|
Received Date | | 10/2/1975 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SOM1975-00490
|
|
Description | |
|
|
Last Name | | QUATSAP POINT LLC
|
|
Received Date | | 10/2/1975 12:00:00 AM
|
|
Status | | RNC
|
|
| | |
|
|
|
Case Number | | XMP1977-00009
|
|
Description | | Repair and replace existing bulkhead with replacement of a dock.
|
|
Last Name | | UDDENBERG
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|