|
Case Number | | USR2005-00111
|
|
Description | | decommissioning
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 11/16/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2005-00112
|
|
Description | | decommissioning public
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 11/16/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2003-00034
|
|
Description | | Shoreline Exemption - Replace an existing 5,000 gallon water storage tank with a new 17,200 gallon above ground water storage tank. This proposal has already undergone review and received approval by the Washington State Department of Health. This permit encompasses the following:
-Shoreline Exemption pursuant to Section 3.402(6) of the Jefferson County Shoreline Master Program.
-Building Permit
In addition, this proposal is subject to review of the State Environmental Policy Act (SEPA). Jefferson County has assumed lead agency status and has issued a Determination of Non-Significance (DNS). A building application, shoreline application and environmental checklist has been submitted in conjunction with this proposal.
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 10/22/2003 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD2003-00615
|
|
Description | | Replace an existing 5,000 gallon water storage tank with a new 17,200 gallon above ground water storage tank. This proposal has already undergone review and received approval by the Washington State Department of Health. This permit encompasses the following:
-Shoreline Exemption pursuant to Section 3.402(6) of the Jefferson County Shoreline Master Program.
-Building Permit
In addition, this proposal is subject to review of the State Environmental Policy Act (SEPA). Jefferson County has assumed lead agency status and the optional Determination of Non-Significance (DNS) of WAC 197-11-355 is being used. This may be your only opportunity to comment on the environmental impacts of this proposal. A building application, shoreline application and environmental checklist has been submitted in conjunction with this proposal.
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 9/26/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | OTH2002-00008
|
|
Description | | filed with USR02-12. Well site inspection for another well to serve Olympic Canal tracts.
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 3/15/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2002-00012
|
|
Description | | OTH02-8 Well site inspection filed with this case
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 3/7/2002 12:00:00 AM
|
|
Status | | Pending
|
|
| | |
|
|
Case Number | | SOM2000-00012
|
|
Description | |
|
|
Last Name | | OLY CANAL MAINTENANCE CO
|
|
Received Date | | 7/27/2000 12:00:00 AM
|
|
Status | | ACT
|
|
| | |
|
|
Case Number | | SEP2000-00012
See SOM case for current septic system activity.
|
|
Description | | Composting Toilet. System rated for Max 38 uses per day
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 1/31/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
|
Case Number | | BLD2000-00029
|
|
Description | | ADDITION TO EXISTING STRUCTURE FOR COMPOSTING TOILET SYSTEM
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 1/13/2000 9:16:17 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1999-10012
|
|
Description | | The proposal is to construct an addition to an existing structure in the Olympic Canal Tracts for purposes of accomodating a composting toilet system. This proposal is exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800 (2)(e).
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 12/1/1999 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | PRE1999-00052
|
|
Description | | To construct an addition to existing structure to accomodate composting toilet system.
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 9/17/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1997-00634
|
|
Description | | PROPANE TANK INSTALLATION
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE
|
|
Received Date | | 9/25/1997 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1988-10007
|
|
Description | | RIPRAP
|
|
Last Name | | OLY CANAL MAINTENANCE CO
|
|
Received Date | | 5/6/1988 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1976-10016
|
|
Description | | Increase width of existing boat ramp ten feet, add parallel floating walk (4' X 100') with a landing and access ramp.
|
|
Last Name | | NAUD
|
|
Received Date | | 3/29/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10031
|
|
Description | | To improve the swimming area and construct a boat ramp
|
|
Last Name | | OLY CANAL MAINTENANCE CO
|
|
Received Date | | 10/3/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|