|
Case Number | | BLD2021-00515
|
|
Description | | PICNIC SHELTER- REBUILD SAME FOR SAME
SEP2017-00047
|
|
Last Name | |
|
|
Received Date | | 8/17/2021 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2019-00451
|
|
Description | | QUESTIONS REGARDING REBUILDING A PICNIC STRUCTURE IN THE PARK.
|
|
Last Name | |
|
|
Received Date | | 7/25/2019 9:56:58 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2019-00340
|
|
Description | | QUESTIONS REGARDING REPLACING A PICNIC SHELTER AT MYSTERY BAY PARK.
|
|
Last Name | |
|
|
Received Date | | 7/18/2019 10:12:46 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SEP2017-00047
See SOM case for current septic system activity.
|
|
Description | | Mystery Bay St. Pk. Boat Pump Out, holding tank replacement only.
|
|
Last Name | | ST. PARKS
|
|
Received Date | | 3/30/2017 9:40:50 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2017-00001
|
|
Description | | Shoreline Exemption for Maintenance and Repair – 18.25.560(2). Fill and abandon
the existing, failing 2000 gallon boat pump out impervious sewer holding tank. Replace with new 2000 gallon boat pump out impervious sewer holding tank further upland from existing tank. Extend electrical conduit and effluent piping from existing tank to new tank. SEP17-00047
|
|
Last Name | | WA ST PARKS & REC COMM
|
|
Received Date | | 1/23/2017 4:00:25 PM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2016-00573
|
|
Description | | Washington State Parks and Recreation is proposing to abandon an existing imerveous sewer holding tank and install a new imperveous holding tank further up land to comply with shoreline regulations.
|
|
Last Name | | SENDZIK
|
|
Received Date | | 11/23/2016 7:56:06 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2016-00002
|
|
Description | | MOORING BUOY MAINTENANCE FOR 3 JEFFERSON COUNTY STATE PARKS.
FORT FLAGLER STATE PARK- 7 EXISTING BUOYS, FORT TOWNSEND 4 EXISTING BUOYS, MYSTERY BAY 7 EXISTING BUOYS.
WITH FLOOD DEVELOPMENT PERMIT.
|
|
Last Name | | PARKS AND RECREATION COMMISSION
|
|
Received Date | | 1/15/2016 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SOM2013-00017
|
|
Description | | Vault Toilet
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 11/10/2015 10:18:49 AM
|
|
Status | | ACT
|
|
| | |
|
|
Case Number | | SDP2013-00021
|
|
Description | | SHORELINE EXEMPTION FOR VAULT TOILET - MYSTERY BAY PARK
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 3/27/2013 2:33:24 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SEP2013-00017
See SOM case for current septic system activity.
|
|
Description | | Replace existing VAULT TOILET
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 2/13/2013 9:45:23 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2013-00046
|
|
Description | | MYSTERY BAY PARKS VAULT TOILET FACILITY REPLACEMENT
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 2/5/2013 10:52:01 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2012-00055
|
|
Description | | SHORELINE EXEMPTION FOR BOAT PUMP OUT REPLACEMENT
|
|
Last Name | | STATE OF WA PARKS & REC COMMISSION
|
|
Received Date | | 10/3/2012 1:56:32 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2005-00017
|
|
Description | | Improvements proposed to the Mystery Bay State Park on Marrowstone Island. The proposal includes resurfacing a portion of the existing 12 foot by 180 foot boat ramp and installation a paved approach approximately 150 feet long above the existing boat ramp. The improvements to the boat ramps will be required to be designed to ensure that stormwater run-off from these improvements are not directed into Mystery Bay as required by Performance Standards 2 & 5 of Section 5.40 (Boat Launches) of the Jefferson County Shoreline Management Master Program (SMMP).
The proposal also includes the construction of a new 7 foot wide by 20 foot long pier, a 4 foot wide by 20 foot long metal ramp, and a 6 foot wide by 80 foot long floating dock. The pier, ramp and float would be located adjacent (parallel) to the boat ramp.
The proposal also includes reconfiguring and upgrading the existing access and parking areas. A RV pad is proposed to accommodate the park attendant. The proposal also includes improving the restroom facilities. The RV Pad, restroom facilities, new paved approach, three new parking spaces, and other improvements would be located within the 150 foot buffer required for the Category I Wetland located to the west. The proposed drainfield would be located outside of the 150 foot wetland buffer. More specific details are provided in the application for this proposal, which is available at the Jefferson County Department of Community Development (DCD) office.
The Washington State Parks and Recreation Commission issued a Determination of Non-Significance (DNS) for this proposal on June 13, 2005. The comment period on the Threshold Determination ended on June 29, 2005. A copy of the Threshold Determination is available at the DCD office.
This proposed improvements to the park and a portion of the boat ramp that are located landward on the Ordinary High Water Mark (OHWM) are designated Conservancy by the SMMP. The portions of the boat ramp, pier, ramp, and floats located waterward of the OHWM are designated Aquatic by the SMMP. Boat launches, piers, ramps, floats, and recreational uses in these designations require a Shoreline Secondary and Substantial Development Permit by the SMMP.
Jefferson County will also require a building permit and septic permit for this proposal. A stormwater, wetland enhancement, and habitat management plan have been prepared for this proposal to address impacts from this proposal. A Biological Evaluation has also been prepared for this proposal for compliance with Section 7 of the Endangered Species Act. These plans and studies can be reviewed at the DCD office.
|
|
Last Name | | STATE PARKS & RECREATION COMMISSION
|
|
Received Date | | 6/14/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2004-00042
|
|
Description | | SHORELINE EXEMPTION to replace concrete anchors with helix anchors systems for 31 mooring buoys located in state parks, which include Fort Worden, Fort Flagler, Mystery Bay, Old Fort Townsend, and Shine Tidelands. These state parks are located in the following water bodies: Admiralty inlet, Kilisut Harbor, Port Townsend Bay, Bywater Bay, Hood Canal, and Puget Sound.
|
|
Last Name | | WA STATE PARKS AND RECREATION
|
|
Received Date | | 8/23/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | OTH2004-00004
|
|
Description | | WET SEASON EVALUATION. FILED WITH SEP13-17.
|
|
Last Name | | WASHINGTON STATE PARKS & RECREATION
|
|
Received Date | | 1/8/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2003-00031
|
|
Description | | Repair and Replace existing facilities serving Mystery Bay State Park
|
|
Last Name | | WA ST PARKS & RECREATIONS COMM
|
|
Received Date | | 7/31/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2001-00020
|
|
Description | | Routine clearing of debris from boat launches after storm events. A work will be conducted utilizing both a small tractor and some hand work. All debris generated through the activity will be dispursed upland.
|
|
Last Name | | WA STATE PARKS & RECREATION COMMISS
|
|
Received Date | | 5/17/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1992-00045
|
|
Description | | Place rip-rap along 25 ft of shoreline to protect existing dock
|
|
Last Name | |
|
|
Received Date | | 6/25/1992 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1988-00001
|
|
Description | | PIER WITH SANITATION PUMP-OUT
|
|
Last Name | |
|
|
Received Date | | 1/4/1988 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1982-00035
|
|
Description | | Moorage renovation at Mystery Bay Recreation Area
|
|
Last Name | | VINING
|
|
Received Date | | 11/12/1982 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1981-10009
|
|
Description | | Construct a picnic shelter, move existing pit toilets and replace with vault toilets and construct an entrance gate
|
|
Last Name | |
|
|
Received Date | | 3/25/1981 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1978-00021
|
|
Description | | Replacement of deteriorated decking and handrails on an existing 260' X 30' pier
|
|
Last Name | | E.P., CHIEF ENVIRONMENTAL COORDINAT
|
|
Received Date | | 6/29/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
|
Case Number | | XMP1974-00009
|
|
Description | | Repair of boat launch facility at Fort Flagler State Park and repair/replacement of approximately 340 feet of boat mooring floats at Mystery Bay State Park.
|
|
Last Name | | HEISER
|
|
Received Date | | 1/8/1974 12:00:00 AM
|
|
Status | | E
|
|
| | |
|