Case Number | | SDP2022-00013
|
|
Description | | SHORELINE EXEMPTION for repair and maintenance to an existing storm berm, permitting under SDP2014-00003, of an area of approximately 400-feet in length and 2,500 SF in area. Material to repair the berm will be identical to existing 2-inch and larger rounded rock (locally known as "bull rock"). In no case shall the replaced fill exceed 3-feet of depth.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 5/19/2022 9:34:05 AM
|
|
Status | | Approved
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2020-00019
|
|
Description | | Shoreline exemption (maintenance and repair) for dredging up to 1,000 cubic yards of sediments to be placed just south of the marina entrance.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 10/22/2020 12:20:44 PM
|
|
Status | | CLS
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2018-00799
|
|
Description | | permit requirements to add pervious or nonpervious asphalt to existing gravel roadway in marina, approx 925 feet long
|
|
Last Name | | BODKIN
|
|
Received Date | | 12/19/2018 1:13:06 PM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | WRF2017-00002
|
|
Description | | Cape George Colony Club
|
|
Last Name | | LEVY
|
|
Received Date | | 9/28/2017 12:47:21 PM
|
|
Status | | ACT
|
|
| | |
|
|
Case Number | | SDP2016-00027
|
|
Description | | SHORLINE EXEMPTION with Stormwater Management Permit and Flood Development Permit: Upgrade stormwater managment facilities to include on-site infiltration of stormwater into below-grade infiltration bed, with large storm event overflow into the marina (mimicking existing conditions). The project development consists of replacing a failed stormwater catch basin and infiltration trench with 2 new catch basins and a new 40’ long x 15’ wide x 1.5’ deep infiltration bed. The elevation of the trench bottom is proposed to maintain 12” of vertical separation above a tidally influenced ground water table. The stormwater flowing into the existing catch basin is from approximately 11,000 sf of paved parking lot. The new stormwater system is proposed to replace the existing, and increase its size to receive stormwater from 15,000 sf of paved and gravel driving surfaces.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/23/2016 10:37:39 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2016-00414
|
|
Description | | NEW MECHANICAL - HEAT PUMP
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/19/2016 9:31:43 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2016-00329
|
|
Description | | Replace damaged cabin in shoreline.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/12/2016 12:04:51 PM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2016-00035
|
|
Description | | Upgrade existing stormwater infiltration facilities.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 1/15/2016 12:42:12 PM
|
|
Status | | CLS
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SEP2015-00001
See SOM case for current septic system activity.
|
|
Description | | Adding Septic tank, permitting an unpermitted pump tank, Re-locating unpermitted
transport line, adding a 2" gravity line from maint building. Existing SEP83-6 filed here.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 1/6/2015 12:34:15 PM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2014-00020
|
|
Description | | Conditional Discretionary Use for Dredging of Marina, Disposal and related on-going maintenance of the marine facility.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/12/2014 2:43:12 PM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SDP2014-00011
|
|
Description | | One Year Extension granted per JCC 18.25.700 on August 2, 2019. The project involves a continuation of annual maintenance dredging of the marina entrance channel; dock repairs; raising the rock jetty to full height; dredging of shoaled areas in the basin; replacement of dock floats; repair of selected pilings and the creation of a sediment bypass basin. This applicant requires a Type II Shoreline Conditional Discretionary “C(d)” Use permit consistent with JCC 18.25.220. The project is deemed SEPA compliant under WAC 197-11-600, and has received permits and approvals from the U.S. Army Corps of Engineers, the Washington State Department of Fish & Wildlife, and the Department of Ecology. The proposal requires public notice but no public hearing except at the discretion of the UDC Administrator (JCC 18.40.520(2). On December 30, 2014 the UDC Administrator determined that the project would be processed as a Type II Conditional Administrative “C(a)” Use permit.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 5/27/2014 3:46:13 PM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2014-00003
|
|
Description | | Shoreline Substantial Development and Flood Development permits for an enhanced shore storm berm at Cape George Colony Club, in the vicinity of the clubhouse. The berm will be approximately 660 feet in length, 20 feet in width, and less than 4 feet above existing ground surface. The proposed berm will be constructed of gravel and gravelly sand and native species will be planted. Geotechnical and biological reports have been submitted as part of the application.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 1/21/2014 4:17:02 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | PRE2013-00021
|
|
Description | | ENHANCED SHORE STORM BERM
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 8/7/2013 4:28:27 PM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SDP2012-00068
|
|
Description | | SHORELINE EXEMPTION FOR ANNUAL MARINA ENTRANCE CHANNEL & INFRASTRUCTUREMAINTENANCE & REPAIR
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 12/26/2012 9:30:34 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2012-00023
|
|
Description | | SHORELINE EXEMPTION FOR ANNUAL MARINA MAINTENANCE DREDGING - Renewal of Shoreline Exemption MLA08-00279/SDP08-00040 previously MLA07-00263/SDP07-00039 for dredging marina entrance - Shoreline Exemption to conduct hydraulic dredging to remove approximately 1000 cubic yards of material which will be placed on the beach as stipulated through the conditions described in HPA 123964-1issued by the Washington Department of Fish and Wildlife on September 16, 2011, and a Section 10 & 404 permit number NWS 2004-00887 by the US Army Corps of Engineers. The proposal also includes the routine maintenance of docks, ramps, and other infrastructure of the marina. A SEPA threshold determination of non-significance for routine maintenance dredging was completed on June 2, 1999.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 4/23/2012 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | ZON2011-00015
|
|
Description | | Remove One Pacific Madrona Trees From Shoreline Bluff Within A Fish And Wildlife Habitat Conservation Buffer
|
|
Last Name | | EASTERDAY
|
|
Received Date | | 6/6/2011 12:00:00 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | BLD2010-00291
|
|
Description | | SWAP OUT (1) 500 GAL & (1) 120 GAL PROP TANKS
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 8/12/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2010-00055
|
|
Description | | REPAIR & REPLACE THE WALLS AT THE CAPE GEORGE COLONY CLUB'S SWIMMING POOL BUILDING - NO MLA REQ'D, STAYING W/IN EXISTING FOOTPRINT
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 3/1/2010 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | BLD2009-00022
|
|
Description | | REPLACE 2 SHOWER STALLS IN LADIES BATHROOM AND REPLACE 2 SHOWER STALLS IN MENS BATHROOM IN THE POOLHOUSE
NOT ADDING OR REPLACING ANY PLUMBING
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 2/2/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2008-00511
|
|
Description | | REPLACE (1) EXISTING HEAT PUMP, ADD (2) NEW HEAT PUMPS & 4X6' CONCRETE SLAB
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 12/16/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2008-00425
|
|
Description | | REPAIR & REPLACE THE WALLS AT THE CAPE GEORGE COLONY CLUB'S SWIMMING POOL BUILDING - NO MLA REQ'D, STAYING W/IN EXISTING FOOTPRINT
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/23/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2008-00040
|
|
Description | | Renewal of Shoreline Exemption MLA08-00279/SDP08-00040 previously MLA07-00263/SDP07-00039 for dredging marina entrance - Shoreline Exemption to conduct hydraulic dredging to remove approximately 1000 cubic yards of material which will be placed on the beach as stipulated through the conditions described in HPA 109023-4 issued by the Washington Department of Fish and Wildlife on June 17, 2009, and a Section 10 & 404 permit number NWS 2004-00887 by the US Army Corps of Engineers. The proposal also includes the routine maintenance of docks, ramps, and other infrastructure of the marina. A threshold determination for routine maintenance dredging was completed on June 2, 1999.
|
|
Last Name | | ROSSOW
|
|
Received Date | | 6/10/2008 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2007-00039
|
|
Description | | Shoreline Exemption for dredging marina entrance - Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits ST-G2933-03 issued by the Washington Department of Fish and Wildlife on January 31, 2005, and a Section 10 & 404 permit number 2004-00887 for the US Army Corps of Engineers. The proposal also includes the routing maintenance of docks, ramps, and other infrastructure of the marina. A threshold determination for routine maintenance dredging was completed on June 2, 1999.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 5/1/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2006-00012
|
|
Description | | SHORELINE EXEMPTION FOR DREDGING MARINA ENTRANCE-Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits ST-G2933-03 issued by the Washington Department of Fish and Wildlife on January 31, 2005, and a Section 10 & 404 permit number 2004-00887 for the US Army Corps of Engineers. The proposal also includes the routine maintenance of docks, ramps, and other infrastructure of the marina. A threshold determination for routine maintenance dredging was completed on June 2, 1999.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 5/24/2006 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2004-00036
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers. The proposal also includes the routine maintenance of docks, ramps, and other infrastructure of the marina. A threshold determination for routine maintenance dredging was completed on June 2, 1999.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 8/5/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2004-00007
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 4/20/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2003-00454
|
|
Description | | ABOVE GROUND PROPANE TANK, HOT WATER TANK AND POOL HEATER
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/24/2003 12:00:00 AM
|
|
Status | | Canceled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2003-00455
|
|
Description | | ROOF REPAIR AND ADD PARTITIONS
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/24/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2003-00456
|
|
Description | | INSTALLATION OF HEAT RECOVERY VENTILLATION SYSTEM
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/24/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2003-00004
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 1/23/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2001-00013
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers.
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 4/9/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP2000-00002
|
|
Description | | The proposal involves the routine maintenance dredging, over a one year period, of the existing marina access channel through the periodic removal of accumulated sand, silt and small stones. Dredged materials will be placed along the base of existing riprap located to the south side of the marina entrance. Review pursuant to the State Environmental Policy Act (SEPA) will be accomplished through the adoption of an existing environmental document.
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 2/14/2000 11:27:40 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1998-00047
|
|
Description | | Maintenance dredging of a reduced (depth and breath) marina access channel (20' wide at a depth of -3.5' MLLW). Dredging consists of the periodic removal of accumulated sand, silt and cobbles. Dredged materials shall be deposited at an approved site per permit review.
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 10/14/1998 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | OTH1998-00007
|
|
Description | |
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 2/5/1998 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | BLD1994-00021
|
|
Description | | remodel of men's swimming pool dressing rm
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 1/12/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1993-00443
|
|
Description | | cmu wellhouse
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 6/28/1993 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1992-00071
|
|
Description | | Replace 8 existing pilings associated with finger floats
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 11/6/1992 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1992-00036
|
|
Description | | Routine maintenance of the marina access channel and the adjacent sediment bypass harvest area.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 3/23/1992 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1987-10014
|
|
Description | | Extension of northern jetty of the Cape George Marina and a sediment harvest.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 12/7/1987 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00024
|
|
Description | | Repair groin adjacent to the north channel of marina
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 6/9/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SOM1983-00006
|
|
Description | | Now filed to SEP15-00001
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/9/1983 12:00:00 AM
|
|
Status | | RCR
|
|
| | |
|
|
Case Number | | SEP1983-00006
See SOM case for current septic system activity.
|
|
Description | | Serves Clubhouse & Pool. Now filed with SEP15-1 new tank for pool locker room
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 12/8/1982 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1978-10003
|
|
Description | | Swimming pool cover and 40 x 75 foot one story recreation hall.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 3/24/1980 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1974-00020
|
|
Description | | Emergency rip-rap repair
|
|
Last Name | | ANDERSON
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1977-00023
|
|
Description | | Annual removal by dredging 2,000 cubic yards of material from the marina entrance at Cape George.
|
|
Last Name | | PETHERICK
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|