Case Number:ZON2020-00057 |
Case Status: |
Date Received:11/5/2020 |
|
Description:STORMWATER MANAGEMENT PERMIT WITH SEPA for Jefferson County Department of Public
Works (JCPW) to complete work under the Safe Routes to Schools Program Grant awarded by the
Washington State Department of Transportation (WSDOT). The project includes pedestrian and
bicycle improvements to enhance safety and mobility on State Route 116 (SR 116), Cedar Avenue,
the Jefferson County Library property, and the Chimacum Creek Primary School Property. On
Cedar Avenue, the project adds a concrete sidewalk, curb, gutter, ADA sidewalk ramps to the
Jefferson County Library driveway entrance, a bus pullout for Jefferson Transit, stormwater facilities
adjacent to the sidewalk, low level pedestrian illumination to the west side of the Cedar Avenue
sidewalk, crosswalks and bike lanes on both sides of Cedar Avenue and the Utility relocation by
Jefferson County Public Utility District #1. At the Jefferson County Library, the project adds concrete
sidewalks, ADA sidewalk ramps, and a crosswalk along the south side of the Jefferson County
Library driveway entrance, from Cedar Avenue to the library building. At Chimacum Creek Primary
School, the project adds a shared use path for pedestrians and bicyclists beginning at Cedar
Avenue and ending at the northeast corner of the Chimacum Creek Primary School Parking lot. The
path will be located on the north side of the existing fence between Chimacum Primary School and
Jefferson County Library. The path will be 10 feet wide with 2-foot-wide gravel shoulders and will
include low level pedestrian illumination. On SR 116, proposes to install Pedestrian Activated
Rectangular Rapid Flashing Beacons (RRFB) on the shoulders of SR 116 at the Chimacum Creek
Primary School driveway entrance. Stormwater management is treated separately for the path and
the additions to Cedar Avenue. The engineered stormwater plans have been prepared by Jefferson
County Public Works. Construction is tentatively scheduled for the summer of 2021. The Safe
Routes to School grant includes an estimated project coast of $880,300.
|
Date Issued:12/22/2020 |
|
Applicant: JEFFERSON COUNTY PUBLIC WORKS |
Expiration Date:12/22/2021 12:00:00 AM |
|
Site Address: |
Case Finaled: |
|
Parcel No:901023018
|
Other Cases |
Parcel Data |
Map It |
Parcels |
Images |
|
Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
12/22/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
(F) SEPA Threshold DNS +14
|
|
Date Completed:
|
| | |
12/22/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
(F) Issue Final DNS +10
|
|
Date Completed:
|
| | |
12/22/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
12/3/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +14-APO-U
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Ntc of App +14-Publish-U
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
11/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
11/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
11/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
11/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
11/5/2020
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
APPROVAL FOR
|
|
Wording
|
| | |
This APPROVAL is for a SEPA Determination of Non-Significance and a Stormwater Management Permit to complete the safe route to school proposal only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
OTHER REGS
|
|
Wording
|
| | |
Prior to any land disturbing activity, the applicant must comply with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development.
|
|
|
Title:
|
| | |
SEPA
|
|
Wording
|
| | |
Jefferson County has issued the SEPA DNS after using the optional DNS process in WAC 197 11 355. Jefferson County has considered all comments received on its preliminary determination of nonsignificance. Jefferson County has determined that the proposal conducted in conformance with the applicable Jefferson County Codes and Ordinances, will not have a probable significant adverse impact on the environment, and an environmental impact statement is not required. This decision was made after review of a completed environmental checklist and all other submitted information.
|
|
|
Title:
|
| | |
STORMWATER
|
|
Wording
|
| | |
The proposal will create 12,016 square feet of new impervious surface for the Cedar Avenue portion of the project and 2810.66 square feet of new impervious surface for the multiuse path. The 2019 SWMMWW requires proponents of developments that meet these criteria to develop and implement a Stormwater Site Plan that complies with Minimum Requirements #1 #9.
|
|
|
Title:
|
| | |
ENGINEERED STORMWATER PLAN
|
|
Wording
|
| | |
An Engineered Stormwater Plan designed by Jefferson County Department of Public Works has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.
|
|
|
Title:
|
| | |
BMPS
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-ADMIN
|
|
Wording
|
| | |
The Administrator finds that this application complies with applicable provisions of the Unified Development Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County Comprehensive Plan and Land Use map.
|
|
|
Title:
|
| | |
F-SEPA
|
|
Wording
|
| | |
Reviewed under the State Environmental Policy Act (SEPA) by Jefferson county acting as lead agency. Determination of Non Significance (DNS) issued on December 22, 2020.
|
|
|
Title:
|
| | |
F-SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the SEPA Review application on November 5, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 22, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-ECOLOGY COMMENT
|
|
Wording
|
| | |
The Department of Ecology (ECY) commented that clearing activities of one or more acres requires a Construction Stormwater General Permit subject to review and approval by the ECY prior to any land disturbance and all grading and filling of land must utilize only clean fill and have all erosion control measures in place prior to land disturbance.
|
|
|
Title:
|
| | |
F-CODE
|
|
Wording
|
| | |
Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-CRITICAL AREAS
|
|
Wording
|
| | |
The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: Critical Aquifer Recharge Area.
|
|
|
Title:
|
| | |
F-CARA
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
F-LARGE
|
|
Wording
|
| | |
The applicant is proposing to create or add 14,826 square feet of impervious surface and 35,805 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #9 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|