Permit Case Summary

Case Number: Search Help

Case Number:ZON2020-00014 Case Status: Date Received:2/13/2020
Description:REPLACEMENT OF EXISTING MONUMENT SIGN TO INCLUDE: removal of existing sign and replacement in same location with an internally illuminated sign. Date Issued:2/24/2020
Applicant: DOLLBARGER PROPERTY LLC Expiration Date:2/24/2021 12:00:00 AM
Site Address:820 CHIMACUM RD Case Finaled:
Parcel No:901111010 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 2/24/2020
Disposition: DONE
Description: Consistency Review-U
Date Completed: 2/24/2020
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 2/24/2020
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 2/24/2020
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 2/24/2020
Disposition: DONE
Description: Case Entered
Date Completed: 2/13/2020
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Sign Square Footage
Wording The total square foot of the sign shall not exceed 64 square feet per business.

Title: Sign Free Standing or Projecting
Wording There shall be no more than two (2) on-premise free standing or projecting signs or combination thereof.

Title: BMPS
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: APPROVAL FOR SIGN REPLACEMENT
Wording This approval is for to replace an existing monument sign in the same location with an internally illuminated monument sign only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: ILLUMINATION
Wording The illumination of signs shall be shaded, shielded, or directed so as not to adversely affect surrounding properties or public and private rights-of-way or create a hazard or nuisance to the traveling public, or to surrounding properties.

Title: NO SIGN MOVEMENT
Wording No sign or part thereof shall consist of rotating, revolving, or moving parts; consist of banners, streamers, or spinners; or involve flashing, blinking, or alternating lights.

Title: SIGN MAINTENANCE
Wording All signs shall be continuously maintained. Signs that present a hazard shall be subject to abatement.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ADMIN
Wording The Administrator finds that this application complies with applicable provisions of the Unified Development Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County Comprehensive Plan and Land Use map.

Title: F-SITE PLAN CHANGES
Wording The site plan as submitted with the replacement sign application on February 13, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated February 24, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-UDC
Wording The proposal is consistent with JCC 18.30.150 Signs.

Title: F-CRITICAL AREAS
Wording The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: Critical Aquifer Recharge Area.

Title: F-CARA
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: F-ADJ TO MINERAL LAND
Wording If your real property is within five hundred (500) feet of real property within an area designated as Mineral Resource Land (MRL), you may be subject to inconveniences or discomforts arising from such operations, including but not limited to noise, tree removal, odors, fumes, dust, smoke, the operation of machinery, and the storage and disposal of aggregate products. One or more of the inconveniences described may occur as a result of extraction and processing operations which are in conformance with existing laws and regulations. Jefferson County has determined that the use of certain real properties for mineral resource extraction and processing activities is necessary to ensure resource availability in the County. The County will not consider to be a nuisance those inconveniences or discomforts arising from extraction and processing operations, if such operations are consistent with commonly accepted best management practices and comply with local, state, and federal laws.

Title: F-SEPA EXEMPT
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197 11 800(2)(c).