Permit Case Summary

Case Number: Search Help

Case Number:ZON2010-00051 Case Status: Date Received:5/10/2010
Description:CONDITIONAL ADMINISTRATIVE USE "C(a)" for a minor utility (sewer lines) in the Parks & Recreation and Rural Village Center zones. This permit will be processed under the Optional Consolidated Permit Processing provisions in JCC 18.40.030(2). See SDP10-00048. Date Issued:11/4/2010
Applicant: WASHINGTON STATE PARKS Expiration Date:4/14/2011 12:00:00 AM
Site Address:SR 116 Case Finaled:
Parcel No:502021001 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: DCD Review Time
Date Completed: 5/5/2014
Disposition: PEND
Description: File Archived
Date Completed: 1/9/2013
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 11/4/2010
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 10/18/2010
Disposition: DONE
Description: Review Complete-U
Date Completed: 10/14/2010
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 10/14/2010
Disposition: DONE
Description: Case Entered
Date Completed: 5/10/2010
Disposition:
Description: Septic Review Complete-U
Date Completed: 10/14/2010
Disposition: DONE
Description: Potable Water Approval Req
Date Completed: 10/14/2010
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 6/7/2010
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 10/14/2010
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/14/2010
Disposition: DONE
Description: Consistency Review-U
Date Completed: 10/14/2010
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 10/14/2010
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Custom Universal Condition
Wording 1. The applicant shall obtain Building Permit from Jefferson County for the structure to house the MBR treatment facility. The application shall address noise containment to meet the standards under JCC 18.30.190. 2. The applicant shall submit to and have approved by the Public Works Department, a Stormwater Plan (CSWPPP) that meets the Minimum Requirements #1 - #10 of Ecology's Stormwater Management Manual for Western Washington, before any land disturbing activities take place. 3. The applicant shall convey to Jefferson County in fee simple a right-of-way that is 30 feet in width from the constructed centerline of Church Road wherever that right-of-way would be located on the proposal site. 4. The applicant shall enter into a Stormwater Management Facility Maintenance Agreement with Jefferson County through the Public Works Department. 5. The applicant shall obtain a right-of-way use permit from the Public Works Department for construction of effluent lines within County road rights-of-way. 6. The applicant shall acquire a franchise from the State Department of Transportation and Jefferson County for construction of effluent lines in State and County road rights-of-ways. 7. The applicant shall implement design modifications to the utility line installation to meet the standards for flood damage reduction under 15.15.080(1)(c)(ii) " New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharges from the system into flood waters." 8. Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit. 9. The applicant shall obtain approval for the State Department of Ecology for an NPDES permit and approval from the State Department of Health for wastewater treatment. 10. The applicant shall meet the standards under JCC 18.30.180 for BMPs in a critical aquifer recharge area either through DOE permitting or meet the standards of 18.30.180 independent of State approval. 11. The applicant shall immediately restore the installation sites to their pre-project condition to the maximum extent possible. 12. New utility distribution lines shall be placed underground wherever reasonable and practical. 13. Utilities and transportation facilities shall be installed in the same rights-of-way when the effect will be to reduce the adverse impacts on the physical environment. 14. It shall be the affirmative duty of the applicant who proposes a minor utility development to determine if any state or federal permits or licenses are necessary and then to obtain those permits or licenses at their own expense. 15. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Waters of the state include but are not limited to waters in roadside ditches and storm drains. 16. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. 17. Soil in stockpiles should be stabilized or protected with sediment-trapping measures to prevent soil loss. All exposed areas of final grade or areas that are not scheduled for work, whether at final grade or otherwise, shall not remain exposed and un-worked for more than two days, between October 1 and April 30. Between May 1 and September 30, no soils shall remain exposed and un-worked for more than 7 days. 18. Source control best management practices such as plastic covering, mulch, temporary seeding, and pha


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Custom Universal Finding
Wording See Staff Report dated September 16, 2010 and Hearing Examiner Decision dated October 12, 2010 for findings.