Title:
|
| | |
Custom Universal Condition
|
|
Wording
|
| | |
1. The applicant shall obtain Building Permit from Jefferson County for the structure to house the MBR treatment facility. The application shall address noise containment to meet the standards under JCC 18.30.190.
2. The applicant shall submit to and have approved by the Public Works Department, a Stormwater Plan (CSWPPP) that meets the Minimum Requirements #1 - #10 of Ecology's Stormwater Management Manual for Western Washington, before any land disturbing activities take place.
3. The applicant shall convey to Jefferson County in fee simple a right-of-way that is 30 feet in width from the constructed centerline of Church Road wherever that right-of-way would be located on the proposal site.
4. The applicant shall enter into a Stormwater Management Facility Maintenance Agreement with Jefferson County through the Public Works Department.
5. The applicant shall obtain a right-of-way use permit from the Public Works Department for construction of effluent lines within County road rights-of-way.
6. The applicant shall acquire a franchise from the State Department of Transportation and Jefferson County for construction of effluent lines in State and County road rights-of-ways.
7. The applicant shall implement design modifications to the utility line installation to meet the standards for flood damage reduction under 15.15.080(1)(c)(ii) " New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharges from the system into flood waters."
8. Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.
9. The applicant shall obtain approval for the State Department of Ecology for an NPDES permit and approval from the State Department of Health for wastewater treatment.
10. The applicant shall meet the standards under JCC 18.30.180 for BMPs in a critical aquifer recharge area either through DOE permitting or meet the standards of 18.30.180 independent of State approval.
11. The applicant shall immediately restore the installation sites to their pre-project condition to the maximum extent possible.
12. New utility distribution lines shall be placed underground wherever reasonable and practical.
13. Utilities and transportation facilities shall be installed in the same rights-of-way when the effect will be to reduce the adverse impacts on the physical environment.
14. It shall be the affirmative duty of the applicant who proposes a minor utility development to determine if any state or federal permits or licenses are necessary and then to obtain those permits or licenses at their own expense.
15. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Waters of the state include but are not limited to waters in roadside ditches and storm drains.
16. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants.
17. Soil in stockpiles should be stabilized or protected with sediment-trapping measures to prevent soil loss. All exposed areas of final grade or areas that are not scheduled for work, whether at final grade or otherwise, shall not remain exposed and un-worked for more than two days, between October 1 and April 30. Between May 1 and September 30, no soils shall remain exposed and un-worked for more than 7 days.
18. Source control best management practices such as plastic covering, mulch, temporary seeding, and pha
|
|