Permit Case Summary

Case Number: Search Help

Case Number:ZON2007-00029 Case Status:Finaled Date Received:3/7/2007
Description:New Commercial Sign Date Issued:3/27/2007
Applicant: L & J ENTERPRISES Expiration Date:3/27/2008 12:00:00 AM
Site Address:972 NESS' CORNER RD Case Finaled:2/20/2008
Parcel No:901024064 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 1/27/2009
Disposition: DONE
Description: Close Case: Project Complete
Date Completed: 2/20/2008
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 3/27/2007
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 3/26/2007
Disposition: DONE
Description: Review Complete-U
Date Completed: 3/26/2007
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 3/26/2007
Disposition: DONE
Description: Case Entered
Date Completed: 3/26/2007
Disposition:
Description: App Substantially Complete-U
Date Completed: 3/26/2007
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 3/26/2007
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/26/2007
Disposition: DONE
Description: Consistency Review-U
Date Completed: 3/26/2007
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 3/26/2007
Disposition: DONE
Description: Start Clock for Incidntl Cases
Date Completed: 3/26/2007
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Sign Illumination
Wording The illumination of signs shall be shaded, shielded, or directed so as not to adversely affect surrounding properties or public and private rights-of-way or create a hazard or nuisance to the traveling public, or to surrounding properties.

Title: Sign No Moving Parts
Wording No sign or part thereof shall consist of rotating, revolving, or moving parts; consist of banners, streamers, or spinners; or involve flashing, blinking, or alternating lights.

Title: Sign Square Footage
Wording The total square foot of the sign shall not exceed 64 square feet per business.

Title: Sign Outside Dimensions
Wording Only one side of a double-faced sign shall be counted when determining total square footage. The square footage of the sign shall be calculated by the outside dimensions necessary to frame the information displayed.

Title: Sign Free Standing or Projecting
Wording There shall be no more than two (2) on-premise free standing or projecting signs or combination thereof.

Title: Sign Attached or Painted Against
Wording Signs attached to or painted against the structure to which it relates shall not be computed as part of the overall total square footage or number.

Title: Sign Maintenance
Wording All signs shall be continuously maintained. Signs that present a hazard shall be subject to abatement.

Title: Sign Freestanding & Vehicles
Wording Free-standing signs shall include measures to restrict vehicles from passing beneath them.

Title: Sign Landscaping
Wording Signs shall be incorporated into the landscaping of the site when landscaping is provided.

Title: Sign Building Permit Required
Wording The Jefferson County Building Official should be contacted to determine whether or not a building permit is required for the sign.

Title: C-OUT OF ROW
Wording No sign shall be placed in the public right-of-way or in the vision clearance triangle of intersections and curb cuts, unless otherwise approved by the Jefferson County Department of Public Works.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-NO PROTEST AGREEMENT
Wording A Restrictive Covenant for the Irondale/Hadlock Sanitary Sewer System No Protest Agreement has been recorded on May 15, 2006 under AFN 511202.

Title: F-ZON
Wording This parcel has been designated as Rural Village Center (RVC) under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on March 26, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Protection Area.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(2)(b).

Title: F-Site Plan Changes
Wording The site plan as submitted with the sign permit application on March 6, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated March 26, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR SIGN ONLY
Wording This approval is for a 8 ft by 5 ft monument sign only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.