Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
12/29/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Close Case: Project Complete
|
|
Date Completed:
|
| | |
12/26/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Start Clock for Incidntl Cases
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Temporary Permit Approval
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print Dummy UDC Permit-UF
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
8/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Tmp Removed after termination
|
|
Wording
|
| | |
The Temporary Use Burger Stand shall be removed within five (5) days of the termination of authorized operation.
|
|
|
Title:
|
| | |
Tmp Setbacks
|
|
Wording
|
| | |
Temporary activities and structures shall be setback consistent with the district in which the activity or structure is located so as not to create a traffic hazzard.
|
|
|
Title:
|
| | |
Tmp Parking
|
|
Wording
|
| | |
All parking shall be located on site.
|
|
|
Title:
|
| | |
Tmp Traffic
|
|
Wording
|
| | |
Traffic resulting from temporary activities shall not adversely affect surrounding properties or adjoining rights-of-way.
|
|
|
Title:
|
| | |
Tmp Hours of Operation
|
|
Wording
|
| | |
Hours of operation shall not be disruptive to the normal use of adjacent residential properties. Hours of operation as stated on the application are from 6:00 a.m. thru 7:00 p.m.
|
|
|
Title:
|
| | |
Custom Universal Condition
|
|
Wording
|
| | |
Applicant shall adhere to all conditions as set forth in the August 8, 2001 letter from the Jefferson County Environmental Health Department.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
The applicant has entered into a written Agreement dated August 8, 2001 with the Port Townsend Paper to allow said temporary use on the premise. Said agreement will expire on August 8, 2002.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
Refer to file MLA01-00430 for list of existing permits.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on August 9, 2001 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: seismic; SUSC/COMM aquifer recharge area.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Geohazard Area
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(ii).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the Temporary Use Burger Stand application on August 9, 2001 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 9, 2001 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a Temporary Use Burger Stand only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|