Description:
|
| | |
Close Case: Project Complete
|
|
Date Completed:
|
| | |
6/26/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
6/26/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Critical Area Review Complete
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
SEPA Review Complete
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Project Review Complete
|
|
Date Completed:
|
| | |
12/13/1999
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RETIRED-Planner Review
|
|
Date Completed:
|
| | |
12/13/1999
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
(F) Hearings Ex Public Hearing
|
|
Date Completed:
|
| | |
1/7/1997
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
(F) Issue Final MDNS +10
|
|
Date Completed:
|
| | |
12/28/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
BOCC DECISION APPR(Status "A")
|
|
Date Completed:
|
| | |
2/3/1997
|
|
Disposition:
|
| | |
A
|
|
|
Description:
|
| | |
Approval Expiration Ltr (F)
|
|
Date Completed:
|
| | |
7/8/1997
|
|
Disposition:
|
| | |
A
|
|
|
Description:
|
| | |
App Substantially Complete (F)
|
|
Date Completed:
|
| | |
5/15/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
(F) Notice of Application +15
|
|
Date Completed:
|
| | |
6/6/1996
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
No construction activities within the waters of Chimacum Creek shall occur.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The parking lot for the Interpretive Center shall be located no closer than 150 feet from the ordinary high water mark of Chimacum Creek, and the size of that parking lot shall be kept to the minimum necessary.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The interpretive center building shall be located no closer than 100 feet from the ordinary high water mark of Chimacum Creek.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
A requirement of the building permit for the interpretive center includes a flood area certificate. The flood area certificate shall be completed by a licensed surveyor and shall include a written and graphic portrayal of the following information: a. The location of the subject property in relation to the flood hazard area. b. The distances of the property and the proposed activity from the edge of the waterway. c. The height of the base flood (in relation to mean sea level) within the vicinity of the proposed activity. d. The height of the subject property (in relation to mean sea level).
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
All mitigation measures outlined in the Final Modified Threshold Determination dated December 18, 1996, shall be met.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The applicant shall submit a detailed trail plan for review and approval.
|
|
|
Title:
|
| | |
Spec Use HPA
|
|
Wording
|
| | |
Obtain a hydraulic Project Approval from Washington Department of Fish and Wildlife if required by that department.
|
|
|
Title:
|
| | |
Spec Use Final Site Plan
|
|
Wording
|
| | |
Prior to final approval, the applicant shall prepare a final site plan which is consistent with the requirements of Chapter 18.40.050 of the Jefferson Counmty Code. The final site plan shall be formatted in such a manner that upon its recording it will be a binding site plan.
|
|
|
Title:
|
| | |
Spec Use Sign
|
|
Wording
|
| | |
Prior to final approval, a sign plan shall be prepared and submitted to the County for review and approval. The plan shall be consistent with county policies and sign regulations.
|
|
|
Title:
|
| | |
Spec Use Water and Sewage Disp
|
|
Wording
|
| | |
Prior to the issuance of a building permit, the applicant shall document that water and sewage disposal methods for the recreation facility is in compliance with applicable State and County requirements for the proposed type of development.
|
|
|
Title:
|
| | |
Spec Use Fire Protection Plan
|
|
Wording
|
| | |
The applicant shall submit an approved Fire Protection Plan to the local fire protection district for review and approval.
|
|
|
Title:
|
| | |
Spec Use Preserve Trees
|
|
Wording
|
| | |
The applicant shall document the method of preserving trees and other wildlife habitat.
|
|
|
Title:
|
| | |
Spec Use Storm Water Management
|
|
Wording
|
| | |
The applicant shall submit an engineered drainage and storm water plan and report to the Jefferson County Department of Public Works for review and approval. The drainage plan shall incorporate the storm drainage criteria of the Washington State Department of Ecology "Storm Water Management Manual" (current edition). The plan shall be of sufficient detail to clearly illustrate the "Best Management Practives" utilized are adequate to treat and control the runoff. Drainage calculations which support the plan shall be included with the plan.
|
|
|
Title:
|
| | |
Spec Use Storm Water Maintenance
|
|
Wording
|
| | |
The applicant shall enter into a Maintenance Agreement for Drainage and Storm Water Facilities with Jefferson County to ensure that the drainage system, as approved by the Department of Public Works, will be maintained in accordance with the plan approved by Jefferson County.
|
|
|
Title:
|
| | |
Spec Use Storm Water Plan
|
|
Wording
|
| | |
Prior to the commencement of any land disturbing activities on the site, an erosion and sediment control plan shall be developed to the standards of the Washington State Department of Ecology "Storm Water Management Manual" (current edition) and be submitted to the County Department of Public Works for review and approval. Approved temporary erosion and sedimentation control Best Management Practices shall be employed during land disturbing activities. An approved set of plans shall be on site during construction.
|
|
|
Title:
|
| | |
Spec Use DPW Review
|
|
Wording
|
| | |
The applicant shall submit plans for construction of roads, storm water facilities, and/or land disturbing activities to the Department of Public Works for review and approval in accordance with the Department's plan review schedule.
|
|
|
Title:
|
| | |
Spec Use Notify DPW
|
|
Wording
|
| | |
The applicant shall notify the Department of Public Works during various phases of construction in accordance with the Department's inspection schedule.
|
|
|
Title:
|
| | |
Spec Use Easements
|
|
Wording
|
| | |
All easements of record shall be graphically portrayed on the site plan with the Auditor's File Number (AFN) of the easement(s) also referenced on the face of the site plan.
|
|
|
Title:
|
| | |
Spec Use Pay Costs
|
|
Wording
|
| | |
In accordance with Ordinance 12-1214-92, effective January 1, 1993, the applicant shall pay all costs of work incidental to approval before final approval is granted.
|
|
|
Title:
|
| | |
Spec Use DPW Final Approval
|
|
Wording
|
| | |
Site Plan Approval, Director's Signature: Upon verification that all conditions have been met, the applicant shall submit a final mylar of the conceptual site plan to the Department three days in advance of approval by the Director of Public Works.
|
|
|
Title:
|
| | |
Spec Use DPW Surety Agreement
|
|
Wording
|
| | |
The applicant may enter into a surety agreement with the Department of Public Works as an alternative to complete installation of required improvements prior to site plan approval. The surety may not exceed one (1) year, and must be in a form acceptable to the County Prosecutor. Acceptable examples of sureties are available from the Department of Public Works. All sureties must be accompanied by an estimate of the cost of all improvements and the estimate must be approved by the Department of Pubic Works prior to acceptance of surety.
|
|