Permit Case Summary

Case Number: Search Help

Case Number:XMP1997-00056 Case Status: Date Received:8/25/1997
Description:repair bulkhead, replace in-kind structures:restroom and gazebo Date Issued:10/27/1997
Applicant: COYLE COMMUNITY CLUB Expiration Date:10/27/1998 12:00:00 AM
Site Address: Case Finaled:
Parcel No:601334272 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: Site inspection
Date Completed: 9/4/1997
Disposition: P
Description: (F) Issue exemption
Date Completed: 10/27/1997
Disposition: F
Description: Planner Review
Date Completed: 10/27/1997
Disposition: F

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: FINDING: EXEMPTION SECTIONS
Wording The proposal is consistent with Exemptons Section 3.402(6) of the Jefferson-Port Townsend Shoreline Management Master Program.

Title: prior existing structure
Wording A restroom facility had historically existed at the site, and was located approximately 25 feet from the ordinary high water mark.

Title: old bulkhead
Wording A deteriated log bulkheaded-like structure exists at the site.

Title: failing septic
Wording The prior restroom facility was removed along with the septic system due to a failing drainfield.

Title: CUSTOM FINDING
Wording The application is for replacement of the restroom structure with an open wall gazebo structure to be used for picnic purposes.

Title: site inspection
Wording Permit Center staff conducted a site inspection on September 4,1997.

Title: applicant submitted info
Wording On September 15, 1997, the applicant submitted additional information which indicates that the total square footage of impervious surface layers located at the site would be less with the proposed project than what existed previously.

Title: APPROVAL ONLY FOR J-PTSMMP
Wording This approval pertains to Jefferson-Port Townsend Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project.

Title: OTHER WORK/SEPARATE APPROVAL
Wording Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate review from this office.

Title: NO FILL OR OTHER MATERIAL
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: FISHERIES & HYDRAULICS CODE
Wording Prior to commencing construction, proponent should contact the Washington State Department of Fisheries at (360) 895-4757 to determine whether this action is subject to the Washington State Hydraulics Code.

Title: NOTIFICATION PRIOR TO BEGINNING
Wording The proponent shall notify the Jefferson County Permit Center, (360) 379-4450, Development Review Division 48 hours in advance prior to commencing construction in order to allow monitoring and ensure conformance with project conditions.

Title: RIPRAP ALIGNED WITH OHW
Wording The rockwall shall be placed as close to the bank as practicable and in substantial alignment with the ordinary high water mark.

Title: CUSTOM CONDITION
Wording The gazebo structure shall be located no further waterward than the location of the prior restroom structure.

Title: CUSTOM CONDITION
Wording The replacement port-a-potty shall be located a minimum one hundred (100) feet from the ordinary high water mark.

Title: building permit required
Wording Prior to construction of any structures or foundations the applicant shall obtain an approved building permit from Jefferson County.

Title: prior to construction
Wording Prior to construction the applicant shall arrange with Permit Center staff to have the ordinary high water mark delineated in the field and all set backs staked out clearly with flagging.