Title:
|
| | |
FINDING: EXEMPTION SECTIONS
|
|
Wording
|
| | |
The proposal is consistent with Exemptons Section 3.402(6) of the Jefferson-Port Townsend Shoreline Management Master Program.
|
|
|
Title:
|
| | |
prior existing structure
|
|
Wording
|
| | |
A restroom facility had historically existed at the site, and was located approximately 25 feet from the ordinary high water mark.
|
|
|
Title:
|
| | |
old bulkhead
|
|
Wording
|
| | |
A deteriated log bulkheaded-like structure exists at the site.
|
|
|
Title:
|
| | |
failing septic
|
|
Wording
|
| | |
The prior restroom facility was removed along with the septic system due to a failing drainfield.
|
|
|
Title:
|
| | |
CUSTOM FINDING
|
|
Wording
|
| | |
The application is for replacement of the restroom structure with an open wall gazebo structure to be used for picnic purposes.
|
|
|
Title:
|
| | |
site inspection
|
|
Wording
|
| | |
Permit Center staff conducted a site inspection on September 4,1997.
|
|
|
Title:
|
| | |
applicant submitted info
|
|
Wording
|
| | |
On September 15, 1997, the applicant submitted additional information which indicates that the total square footage of impervious surface layers located at the site would be less with the proposed project than what existed previously.
|
|
|
Title:
|
| | |
APPROVAL ONLY FOR J-PTSMMP
|
|
Wording
|
| | |
This approval pertains to Jefferson-Port Townsend Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project.
|
|
|
Title:
|
| | |
OTHER WORK/SEPARATE APPROVAL
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate review from this office.
|
|
|
Title:
|
| | |
NO FILL OR OTHER MATERIAL
|
|
Wording
|
| | |
No fill or other material may be placed in the waters or intertidal areas of Jefferson County.
|
|
|
Title:
|
| | |
FISHERIES & HYDRAULICS CODE
|
|
Wording
|
| | |
Prior to commencing construction, proponent should contact the Washington State Department of Fisheries at (360) 895-4757 to determine whether this action is subject to the Washington State Hydraulics Code.
|
|
|
Title:
|
| | |
NOTIFICATION PRIOR TO BEGINNING
|
|
Wording
|
| | |
The proponent shall notify the Jefferson County Permit Center, (360) 379-4450, Development Review Division 48 hours in advance prior to commencing construction in order to allow monitoring and ensure conformance with project conditions.
|
|
|
Title:
|
| | |
RIPRAP ALIGNED WITH OHW
|
|
Wording
|
| | |
The rockwall shall be placed as close to the bank as practicable and in substantial alignment with the ordinary high water mark.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The gazebo structure shall be located no further waterward than the location of the prior restroom structure.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The replacement port-a-potty shall be located a minimum one hundred (100) feet from the ordinary high water mark.
|
|
|
Title:
|
| | |
building permit required
|
|
Wording
|
| | |
Prior to construction of any structures or foundations the applicant shall obtain an approved building permit from Jefferson County.
|
|
|
Title:
|
| | |
prior to construction
|
|
Wording
|
| | |
Prior to construction the applicant shall arrange with Permit Center staff to have the ordinary high water mark delineated in the field and all set backs staked out clearly with flagging.
|
|