Permit Case Summary

Case Number: Search Help

Case Number:XMP1997-00018 Case Status: Date Received:4/1/1997
Description:stream bank protection Date Issued:8/12/1997
Applicant:BRENDA MC INTYRE Expiration Date:8/12/1998 12:00:00 AM
Site Address: Case Finaled:
Parcel No:FRESH_SHOREOFSTATE Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: (F) Issue exemption
Date Completed: 8/12/1997
Disposition: F
Description: Site inspection
Date Completed: 4/16/1997
Disposition: P
Description: Planner Review
Date Completed:
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: FINDING: EXEMPTION SECTIONS
Wording The proposal is consistent with Exemptons Section 3.402(6) of the Jefferson-Port Townsend Shoreline Management Master Program.

Title: FINDING: HPA NUMBER
Wording A Hydraulic Project Approval was issued __________________ under Control Number _____________________. The HPA expires on _________ .

Title: site inspection
Wording A site inspection was conducted by Permit Center staff on April 16, 1997.

Title: CUSTOM FINDING
Wording The bank is heavily vegetated in some portions and partially eroded at other sections. The application is to stabilize the eroded sections of the bank.

Title: APPROVAL ONLY FOR J-PTSMMP
Wording This approval pertains to Jefferson-Port Townsend Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project.

Title: OTHER WORK/SEPARATE APPROVAL
Wording Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate review from this office.

Title: NO FILL OR OTHER MATERIAL
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: RIPRAP ALIGNED WITH OHW
Wording The riprap shall be placed as close to the bank as practicable and in substantial alignment with the ordinary high water mark. The placement of rock shall be kept to a mimimum and only used where necessary, that is, where the shoreline bank has been damaged, the stable bank areas shall not be armored as indicated in the submitted drawing.

Title: CUSTOM CONDITION
Wording The placement of wood and rock structures to enhance fish habitat (creating pools) shall be utilized as required by the Washington Department of Fish and Wildlife.

Title: no removal of vegetation
Wording Removal of existing vegetation at the stable portions shall not occur.