Permit Case Summary

Case Number: Search Help

Case Number:SEP2021-00214 Case Status:Approved Date Received:11/29/2021
Description:info about abandoned well on site filed here. Date Issued:2/14/2022
Applicant:ROBERT L HAGEN Expiration Date:2/14/2025 12:00:00 AM
Site Address:1070 CHIMACUM RD Case Finaled:
Parcel No:901113004 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Miscellaneous Action
Date Completed: 4/21/2022
Disposition: DONE
Description: 10 day Open - Under Review
Date Completed: 12/16/2021
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 11/30/2021
Disposition: DONE
Description: Miscellaneous Action
Date Completed: 11/30/2021
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 11/30/2021
Disposition: DONE
Description: PRESSURE-PUMP TEST REQUEST
Date Completed:
Disposition:
Description: Asbuilt drawing submitted
Date Completed:
Disposition:
Description: Initial Site Inspection by HD
Date Completed: 12/16/2021
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 12/27/2021
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 12/16/2021
Disposition: DONE
Description: Case Entered "P"
Date Completed: 11/29/2021
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: well setback requirement
Wording Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO 48" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24"

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: EXISTING OLD 1979 SYSTEM
Wording H - The original 1979 septic tank must be located and confirmed to have been decommissioned. Prior to final pressure test

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) for the control of stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.