Description:
|
| | |
Issue permit (Fm) "A"
|
|
Date Completed:
|
| | |
11/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Req-DRD (fm)
|
|
Date Completed:
|
| | |
11/8/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Req-DRD (fm)
|
|
Date Completed:
|
| | |
11/1/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
9/13/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Req-DRD (fm)
|
|
Date Completed:
|
| | |
9/13/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pending letter; add inf (Fm)
|
|
Date Completed:
|
| | |
11/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
REDESIGN SUBMITTED (Fm) "P"
|
|
Date Completed:
|
| | |
9/1/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
11/8/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pending letter; add inf (Fm)
|
|
Date Completed:
|
| | |
9/1/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
10 day Open - Under Review
|
|
Date Completed:
|
| | |
8/12/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Permit Application (Fm)
|
|
Date Completed:
|
| | |
7/26/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
7/26/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Asbuilt drawing submitted
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Initial Site Inspection by HD
|
|
Date Completed:
|
| | |
8/12/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
PRESSURE-PUMP TEST REQUEST
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
11/9/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered "P"
|
|
Date Completed:
|
| | |
7/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
8/12/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
ONGOING MONITORING
|
|
Wording
|
| | |
H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED.
A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT
|
|
|
Title:
|
| | |
trench depth
|
|
Wording
|
| | |
DUE TO THE PRESENCE OF FILL MATERIAL, TRENCH DEPTH MUST BE 36 INCHES
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
UDC compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.
|
|
|
Title:
|
| | |
domestic strength waste
|
|
Wording
|
| | |
This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.
|
|
|
Title:
|
| | |
conventional-asbuilt required
|
|
Wording
|
| | |
H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval.
|
|
|
Title:
|
| | |
O & M Manual required
|
|
Wording
|
| | |
Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.
|
|
|
Title:
|
| | |
Designer Notification/inspections
|
|
Wording
|
| | |
Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.
|
|
|
Title:
|
| | |
Installation Inspection
|
|
Wording
|
| | |
Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.
|
|
|
Title:
|
| | |
No Building Permit Guaranteed
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.
|
|
|
Title:
|
| | |
Code Compliance
|
|
Wording
|
| | |
All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.
|
|
|
Title:
|
| | |
APPROVAL FOR NEW SEPTIC
|
|
Wording
|
| | |
This APPROVAL is for a new septic system only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the new septic system application on August 25th, 2021 has been reviewed for consistency under the UDC by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the site plan shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
NO CRITICAL AREAS
|
|
Wording
|
| | |
Jefferson County Department of Community Development reviewed the application and the county GIS mapping system for the presence of critical areas and concluded that the property DOES NOT contain critical areas. However, future proposals will be subject to a new critical area review and conditions may be added if critical areas are found on the property.
|
|
|
Title:
|
| | |
IDP
|
|
Wording
|
| | |
Washington State Department of Archaeology and Historic Preservation (DAHP) has identified parcel 986702401 as a high probability area for cultural resources. DAHP has instructed Jefferson County to implement an Inadvertent Discovery Plan in lieu of an archaeological excavation permit and survey. All contractors and personnel shall be familiar with the inadvertent discovery plan as attached to this permit. If any possible historic, archaeological and/or cultural artifacts are inadvertently discovered, the applicant shall immediately stop all work on the project and shall notify the Washington Department of Archaeology and Historic Preservation, Jefferson County Department of Community Development, and affected tribes.
|
|
|
Title:
|
| | |
Stormwater BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) for the control of stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|