Permit Case Summary

Case Number: Search Help

Case Number:SEP2019-00218 Case Status:Approved Date Received:9/23/2019
Description:info from failed SEP95-243 filed here. Date Issued:1/4/2020
Applicant:ROBIN L WOODS Expiration Date:4/4/2020 12:00:00 AM
Site Address:147 RHODY CT Case Finaled:
Parcel No:963100012 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: System Incomplete (Fm) "A"
Date Completed:
Disposition:
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 1/13/2020
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 1/4/2020
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 9/23/2019
Disposition: DONE
Description: Update SOM Repair Recd
Date Completed: 9/23/2019
Disposition: DONE
Description: PRESSURE-PUMP TEST REQUEST
Date Completed:
Disposition:
Description: Asbuilt drawing submitted
Date Completed: 3/25/2020
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 3/25/2019
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/4/2020
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 1/4/2020
Disposition: DONE
Description: Case Entered "P"
Date Completed: 9/23/2019
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: dose counter & ETM
Wording Dose counter and elapsed time meter are required in the control panel for all system components.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A. The permit must be completed within 90 days of the date of issuance.

Title: SCREEN REQUIRED
Wording A screen shall be provided either at the outlet of the septic tank or around the pump or at both locations. A pump shroud is required if only an outlet baffle filter is used.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: Contaminated Material - onsite
Wording H - The material that is removed from the system that has come into contact with waste water must be treated/decontaminated prior to final disposal. The material from the system shall be removed and placed as described in the design to allow for pathogen die-off. The material shall be placed in lifts of no more than 6"-8", each lift covered with lime. It shall be covered and protected from erosion (covered with 6 inches of uncontaminated soil or other approved material covered with straw, etc.). If an offsite location is proposed the site shall be inspected and verified that is meets vertical and horizontal separation requirements of WAC246-272A.

Title: MONITORING PORTSHOLD
Wording H - Monitoring ports shall be installed to the bottom of the gravelless chambers and over the ends of the pressure lateral pipes to the surface of the ground.