Permit Case Summary

Case Number: Search Help

Case Number:SEP2019-00168 Case Status:Finaled Date Received:7/18/2019
Description:info from failed SEP74-226 filed here Date Issued:8/17/2019
Applicant:CHRISTINA I NELSON Expiration Date:11/17/2019 12:00:00 AM
Site Address:10 CEDAR LN Case Finaled:12/11/2019
Parcel No:956700501 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 12/11/2019
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 12/9/2019
Disposition: DONE
Description: Miscellaneous Action
Date Completed: 11/21/2019
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: Issue permit (Fm) "A"
Date Completed: 8/17/2019
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 7/22/2019
Disposition: DONE
Description: Update SOM Repair Recd
Date Completed: 8/1/2019
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 11/21/2019
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 8/7/2019
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/23/2019
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 7/23/2019
Disposition: DONE
Description: Case Entered "P"
Date Completed: 7/22/2019
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: minimum land RESTRICTIVE COV
Wording H - This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots 1 & 2 (north 84') & lot 3 (north 84' or east 43.5') of block 5, Harrisburg to meet the minimum land area required under WAC 246-272A Onsite Sewage Code. COVENANT recorded 7/18/19 under AFN 625561.

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: conventional-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval.

Title: riser on d-box
Wording Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A. The permit must be completed within 90 days of the date of issuance.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: No Reserve Area
Wording No reserve/repair area was reviewed or approved as part of this application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: APPROVAL TO REPAIR SEP ONLY
Wording This approval is to repair the existing septic system only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: SITE PLAN CHANGES
Wording The site plan as submitted with the septic repair application on July 22, 2019 has been reviewed for consistency under the UDC by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to tsite plan shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: UGA NO PROTEST NOT NEEDED
Wording This permit is for a septic repair only, the development is existing and therefore no UGA No Protest Agreement was required.

Title: NO CRITICAL AREAS
Wording Jefferson County Department of Community Development reviewed the application and the county GIS mapping system for the presence of critical areas and concluded that the property DOES NOT contain critical areas. However, future proposals will be subject to a new critical area review and conditions may be added if critical areas are found on the property.