Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
4/3/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Mon Agreement ATU Attach (Fm)
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
INSTALLATION START NOTICE
|
|
Date Completed:
|
| | |
1/11/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue permit (Fm) "A"
|
|
Date Completed:
|
| | |
8/14/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pending letter; add inf (Fm)
|
|
Date Completed:
|
| | |
8/14/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
1/29/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
12/6/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
6/13/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
REDESIGN SUBMITTED (Fm) "P"
|
|
Date Completed:
|
| | |
1/25/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pending letter; add inf (Fm)
|
|
Date Completed:
|
| | |
1/30/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Permit Application (Fm)
|
|
Date Completed:
|
| | |
7/21/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
4/3/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Initial Site Inspection by HD
|
|
Date Completed:
|
| | |
10/2/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Asbuilt drawing submitted
|
|
Date Completed:
|
| | |
3/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
10/2/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
10/23/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered "P"
|
|
Date Completed:
|
| | |
7/21/2017
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
ONGOING MONITORING
|
|
Wording
|
| | |
H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED.
A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.
|
|
|
Title:
|
| | |
alternative-asbuilt required
|
|
Wording
|
| | |
H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.
|
|
|
Title:
|
| | |
TANK ABANDONMENTS
|
|
Wording
|
| | |
H - 3 Existing tanks down at the Ajax Cafe need to be properly abandoned. They shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.
|
|
|
Title:
|
| | |
Tank Abandonment
|
|
Wording
|
| | |
H - The Existing septic system permitted under SEP77-295 is located up by Curtiss St. where contaminated soils are to be placed.
This system shall be properly abandoned PRIOR to covering with any contaminated soils. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.
|
|
|
Title:
|
| | |
staking of drainfield
|
|
Wording
|
| | |
Contact designer prior to installation for staking of drainfield area.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be sleeved/cased or equivalent.
|
|
|
Title:
|
| | |
SAND LINED BED
|
|
Wording
|
| | |
TRENCH TO BE EXCAVATED UP TO 63" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.
|
|
|
Title:
|
| | |
UDC compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.
|
|
|
Title:
|
| | |
MINIMUM LAND. EASEMENT
|
|
Wording
|
| | |
H - This permit is granted based on the recorded Easement on the adjacent property to meet the minimum land area required under WAC 246-272A Onsite Sewage Code. COVENANT recorded under, 613953
|
|
|
Title:
|
| | |
food serv annual monitoring
|
|
Wording
|
| | |
WAC 246-272A REQUIRES ANNUAL MONITORING OF THE ONSITE SEWAGE SYSTEM WHEN IT IS SERVING A FOOD SERVICE ESTABLISHMENT.
|
|
|
Title:
|
| | |
domestic strength waste
|
|
Wording
|
| | |
This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.
|
|
|
Title:
|
| | |
BOD-WASTE STRENGTH MONITORING
|
|
Wording
|
| | |
Waste Strength (BOD, TSS, Grease and oils) is to be monitored quarterly for the first year of operation and annually thereafter. Responsibility is that of the owner. Results are to be submitted to the Jefferson County Health Dept.
|
|
|
Title:
|
| | |
design flow/water usage monitorin
|
|
Wording
|
| | |
Exceeding the permitted design flow of 2500 gal/day shall constitute a violation of this permit. Water usage monitoring shall be conducted daily for the first two months & weekly thereafter. These monitoring results shall be submitted to the Jefferson County Health Dept. no less than quarterly.
|
|
|
Title:
|
| | |
ATU maintenance
|
|
Wording
|
| | |
A maintenance and management contract is required with the manufacturers authorized representative. Maintenance of the system shall be completed by a manufacturers authorized representative at the frequency required by the manufacturer.
|
|
|
Title:
|
| | |
protective barriers
|
|
Wording
|
| | |
H - Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.
|
|
|
Title:
|
| | |
VIOLATION-limited permit life
|
|
Wording
|
| | |
This permit was issued to correct a violation of WAC 246-272A for a failing drainfield. The permit must be completed within 90 days of the date of issuance. The permit expiration may be extended past 90 days if the building closes and does not generate any waste water, ie, restaurant, apartment, or other sources.
|
|
|
Title:
|
| | |
O & M Manual required
|
|
Wording
|
| | |
Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.
|
|
|
Title:
|
| | |
System capacity/uses
|
|
Wording
|
| | |
Approval of this permit does not assure the septic system has capacity for all uses allowed by current code.
|
|
|
Title:
|
| | |
Designer Notification/inspections
|
|
Wording
|
| | |
Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.
|
|
|
Title:
|
| | |
Installation Inspection
|
|
Wording
|
| | |
Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.
|
|
|
Title:
|
| | |
Certified Installer Required
|
|
Wording
|
| | |
This system must be constructed by an installer certified by the Jefferson County Public Health Department per Jefferson County Code 8.15.120 (9) and state code WAC246-272A-0250 due to distance to shoreline.
|
|
|
Title:
|
| | |
No Building Permit Guaranteed
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.
|
|
|
Title:
|
| | |
Code Compliance
|
|
Wording
|
| | |
All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.
|
|
|
Title:
|
| | |
Contaminated Material - onsite
|
|
Wording
|
| | |
H - The material that is removed from the system that has come into contact with waste water must be treated/decontaminated prior to final disposal. The material from the system shall be removed and placed as described in the design to allow for pathogen die-off. The material shall be placed in lifts of no more than 6"-8", each lift covered with lime. It shall be covered and protected from erosion, covered with 6 inches of uncontaminated soil or other approved material.)
|
|
|
Title:
|
| | |
CONTAMINATED SOILS
|
|
Wording
|
| | |
Contaminated soils excavated at the cafe must be free of liquids and placed in specific areas approved in design.
|
|
|
Title:
|
| | |
EXISTING WATER LINES
|
|
Wording
|
| | |
Existing water lines, hose bibs, etc. must be 10' from any septic component, re-routing may be required.
|
|
|
Title:
|
| | |
FLOWMETER
|
|
Wording
|
| | |
Lift station pump tank to include a flow meter as per design.
|
|
|
Title:
|
| | |
HIGH ALARM AT DF
|
|
Wording
|
| | |
H - The high alarm in the pump tank up at the drainfield must have a remote alarm down at the cafe.
|
|
|
Title:
|
| | |
CRICTICAL AREAS CONDITION
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County staff for the potential presence of Critical Areas under the provisions of the Unified Development Code (UDC). After a Geographic Information Systems mapping review, the following Critical Areas were confirmed to be present on the subject property: geologically hazardous areas (unstable shoreline slope stability, seismic); fish and wildlife habitat conservation area (Type N stream; functionally isolated from marine water); wetlands (functionally isolated); critical aquifer recharge area (susceptible and special aquifer recharge protection area); and seawater intrusion protection zone (coastal). The site plan shows the drainfield well beyond the 50-foot buffer stream buffer so no habitat managment plan was required. A Geology Hazard Report, prepared by Stratum Group (dated September 26, 2017), concluded that the proposal would not affect slope stability. An Aquifer Recharge Area Report, prepared by Streamline Environmental (dated September 2017), stated that groundwater generally flow east and southeast towards Port Townsend Bay.
|
|
|
Title:
|
| | |
SDP CONDITION
|
|
Wording
|
| | |
The applicant shall adhere to all shoreline permit conditions (MLA17-00065 and MLA17-00082).
|
|
|
Title:
|
| | |
Stormwater BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|