Case Number:SEP2017-00144 Case Status:Finaled Date Received:7/20/2017
Description:PERMIT FOR SYSTEM REPAIR & EXPANSION (Ajax Cafe) Off site drainfield Building served on 989400601 Drainfield on 901013016 Date Issued:8/14/2018
Applicant:NORTHWEST SCHOOL OF WOODEN BOATBUILDING Expiration Date:11/14/2018 12:00:00 AM
Site Address:21 N WATER ST Case Finaled:4/3/2019
Parcel No:901013016 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 4/3/2019
Disposition: DONE
Description: Mon Agreement ATU Attach (Fm)
Date Completed:
Disposition:
Description: Monitoring Agreemt Sent (Fm)
Date Completed:
Disposition:
Description: INSTALLATION START NOTICE
Date Completed: 1/11/2019
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 8/14/2018
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 8/14/2018
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 1/29/2018
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed:
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 12/6/2017
Disposition:
Description: Env. Sensitive Area Review-U
Date Completed: 6/13/2018
Disposition: DONE
Description: REDESIGN SUBMITTED (Fm) "P"
Date Completed: 1/25/2018
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 1/30/2018
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 7/21/2017
Disposition: DONE
Description: Pressure test required
Date Completed: 4/3/2019
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 10/2/2017
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 3/21/2019
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 10/2/2017
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/23/2017
Disposition: DONE
Description: Case Entered "P"
Date Completed: 7/21/2017
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: TANK ABANDONMENTS
Wording H - 3 Existing tanks down at the Ajax Cafe need to be properly abandoned. They shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: Tank Abandonment
Wording H - The Existing septic system permitted under SEP77-295 is located up by Curtiss St. where contaminated soils are to be placed. This system shall be properly abandoned PRIOR to covering with any contaminated soils. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be sleeved/cased or equivalent.

Title: SAND LINED BED
Wording TRENCH TO BE EXCAVATED UP TO 63" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: MINIMUM LAND. EASEMENT
Wording H - This permit is granted based on the recorded Easement on the adjacent property to meet the minimum land area required under WAC 246-272A Onsite Sewage Code. COVENANT recorded under, 613953

Title: food serv annual monitoring
Wording WAC 246-272A REQUIRES ANNUAL MONITORING OF THE ONSITE SEWAGE SYSTEM WHEN IT IS SERVING A FOOD SERVICE ESTABLISHMENT.

Title: domestic strength waste
Wording This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.

Title: BOD-WASTE STRENGTH MONITORING
Wording Waste Strength (BOD, TSS, Grease and oils) is to be monitored quarterly for the first year of operation and annually thereafter. Responsibility is that of the owner. Results are to be submitted to the Jefferson County Health Dept.

Title: design flow/water usage monitorin
Wording Exceeding the permitted design flow of 2500 gal/day shall constitute a violation of this permit. Water usage monitoring shall be conducted daily for the first two months & weekly thereafter. These monitoring results shall be submitted to the Jefferson County Health Dept. no less than quarterly.

Title: ATU maintenance
Wording A maintenance and management contract is required with the manufacturers authorized representative. Maintenance of the system shall be completed by a manufacturers authorized representative at the frequency required by the manufacturer.

Title: protective barriers
Wording H - Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A for a failing drainfield. The permit must be completed within 90 days of the date of issuance. The permit expiration may be extended past 90 days if the building closes and does not generate any waste water, ie, restaurant, apartment, or other sources.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: System capacity/uses
Wording Approval of this permit does not assure the septic system has capacity for all uses allowed by current code.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Certified Installer Required
Wording This system must be constructed by an installer certified by the Jefferson County Public Health Department per Jefferson County Code 8.15.120 (9) and state code WAC246-272A-0250 due to distance to shoreline.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: Contaminated Material - onsite
Wording H - The material that is removed from the system that has come into contact with waste water must be treated/decontaminated prior to final disposal. The material from the system shall be removed and placed as described in the design to allow for pathogen die-off. The material shall be placed in lifts of no more than 6"-8", each lift covered with lime. It shall be covered and protected from erosion, covered with 6 inches of uncontaminated soil or other approved material.)

Title: CONTAMINATED SOILS
Wording Contaminated soils excavated at the cafe must be free of liquids and placed in specific areas approved in design.

Title: EXISTING WATER LINES
Wording Existing water lines, hose bibs, etc. must be 10' from any septic component, re-routing may be required.

Title: FLOWMETER
Wording Lift station pump tank to include a flow meter as per design.

Title: HIGH ALARM AT DF
Wording H - The high alarm in the pump tank up at the drainfield must have a remote alarm down at the cafe.

Title: CRICTICAL AREAS CONDITION
Wording The application was reviewed by the Jefferson County staff for the potential presence of Critical Areas under the provisions of the Unified Development Code (UDC). After a Geographic Information Systems mapping review, the following Critical Areas were confirmed to be present on the subject property: geologically hazardous areas (unstable shoreline slope stability, seismic); fish and wildlife habitat conservation area (Type N stream; functionally isolated from marine water); wetlands (functionally isolated); critical aquifer recharge area (susceptible and special aquifer recharge protection area); and seawater intrusion protection zone (coastal). The site plan shows the drainfield well beyond the 50-foot buffer stream buffer so no habitat managment plan was required. A Geology Hazard Report, prepared by Stratum Group (dated September 26, 2017), concluded that the proposal would not affect slope stability. An Aquifer Recharge Area Report, prepared by Streamline Environmental (dated September 2017), stated that groundwater generally flow east and southeast towards Port Townsend Bay.

Title: SDP CONDITION
Wording The applicant shall adhere to all shoreline permit conditions (MLA17-00065 and MLA17-00082).

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: Connection to Public Water
Wording This approval is valid only with a connection to an approved public water supply.