Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
8/6/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
3/16/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
INSTALLATION START NOTICE
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Update SOM Repair Recd
|
|
Date Completed:
|
| | |
6/7/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
2/9/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
INSTALLATION START NOTICE
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue permit (Fm) "A"
|
|
Date Completed:
|
| | |
8/22/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
7/28/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
DRD Reviewer Letter (F)
|
|
Date Completed:
|
| | |
7/28/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Pending letter; add inf (Fm)
|
|
Date Completed:
|
| | |
8/22/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Miscellaneous Action
|
|
Date Completed:
|
| | |
7/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Permit Application (Fm)
|
|
Date Completed:
|
| | |
6/8/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
3/7/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Asbuilt drawing submitted
|
|
Date Completed:
|
| | |
3/7/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Initial Site Inspection by HD
|
|
Date Completed:
|
| | |
7/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
8/21/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
8/22/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered "P"
|
|
Date Completed:
|
| | |
6/8/2017
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
ONGOING MONITORING
|
|
Wording
|
| | |
H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED.
A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.
|
|
|
Title:
|
| | |
alternative-asbuilt required
|
|
Wording
|
| | |
H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.
|
|
|
Title:
|
| | |
Tank Abandonment
|
|
Wording
|
| | |
H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.
|
|
|
Title:
|
| | |
dose counter & ETM
|
|
Wording
|
| | |
Dose counter and elapsed time meter are required in the control panel for all system components.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
SAND LINED TRENCH/BED
|
|
Wording
|
| | |
TRENCH TO BE EXCAVATED TO 36" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" .
|
|
|
Title:
|
| | |
domestic strength waste
|
|
Wording
|
| | |
This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.
|
|
|
Title:
|
| | |
risers
|
|
Wording
|
| | |
Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.
|
|
|
Title:
|
| | |
surface water setback
|
|
Wording
|
| | |
Setback to surface waters- 100' required from drainfield and reserve areas. 50' required from tanks.
|
|
|
Title:
|
| | |
Water line setback
|
|
Wording
|
| | |
10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.
|
|
|
Title:
|
| | |
VIOLATION-limited permit life
|
|
Wording
|
| | |
This permit was issued to correct a violation of WAC 246-272A. The permit must be completed within 90 days of the date of issuance.
|
|
|
Title:
|
| | |
PUMP CHAMBER
|
|
Wording
|
| | |
Pump chamber shall be water tight and a minimum capacity of 1500 GALLON. It shall be equipped with a control panel outside within line of sight of the pump chamber. The panel shall have an audio and visual alarm, a cycle counter and a riser to grade. It shall be UL listed and meet L&I requirements.
|
|
|
Title:
|
| | |
SCREEN REQUIRED
|
|
Wording
|
| | |
A screen shall be provided either at the outlet of the septic tank or around the pump or at both locations. A pump shroud is required if only an outlet baffle filter is used.
|
|
|
Title:
|
| | |
O & M Manual required
|
|
Wording
|
| | |
Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.
|
|
|
Title:
|
| | |
System capacity/uses
|
|
Wording
|
| | |
Approval of this permit does not assure the existing septic system has capacity for all uses allowed by current code.
|
|
|
Title:
|
| | |
Designer Notification/inspections
|
|
Wording
|
| | |
Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.
|
|
|
Title:
|
| | |
Installation Inspection
|
|
Wording
|
| | |
Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.
|
|
|
Title:
|
| | |
No Building Permit Guaranteed
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.
|
|
|
Title:
|
| | |
Code Compliance
|
|
Wording
|
| | |
All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the septic repair and expansion application on June 7, 2017 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the approved site plan shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
APPROVAL FOR ONLY
|
|
Wording
|
| | |
This approval is for a septic repair and expansion only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
ADJACENT FOREST LANDS DISCLOSURE
|
|
Wording
|
| | |
Jefferson County has determined that the use of real property for agriculture and forestry operations is a high priority and favored use in the county. The county will not consider to be a nuisance those inconveniences or discomforts arising from such operations, if such operations are consistent with commonly accepted best management practices in compliance with local, state, and federal laws. If your real property includes or is within five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20, Rural Industrial, Rural Commercial, Agriculture, or Forestry, you may be subject to inconveniences or discomforts arising from such farming and forestry operations, including but not limited to noise, tree removal, odors, flies, fumes, dust, smoke, the operation of farm and forestry machinery during any 24-hour period, the storage and disposal of manure, and the application of permitted fertilizers and permitted pesticides. One or more of these inconveniences may occur as a result of agricultural and forestry operations which are in conformance with existing laws and regulations.
|
|
|
Title:
|
| | |
CONFIRMED ESA'S
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County staff for the potential presence of Critical Areas under the provisions of the Unified Development Code (UDC). After a Geographic Information Systems mapping review the following Critical Areas were confirmed to be present on the subject property: Category II wetland, FEMA Special Flood Hazard Area Zone A, seismic hazard, Special Aquifer Protection Area and suscptible aquifer recharge area.
|
|
|
Title:
|
| | |
GEOHAZARD AREA
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
Wetland Setback
|
|
Wording
|
| | |
Based on the wetalnd report, submitted July 6, 2017 by Meehan-Roulst Wetland Delineating, delineating the Category II wetland a setback of 110-feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the wetland or its buffer is allowed.
|
|
|
Title:
|
| | |
Identify Wetland Buffer
|
|
Wording
|
| | |
A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator.
|
|
|
Title:
|
| | |
Mark Wetland Buffer Drng Cnstrctn
|
|
Wording
|
| | |
Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer - Do Not Remove or Alter Existing Vegetation."
|
|