Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
5/31/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
3/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
INSTALLATION START NOTICE
|
|
Date Completed:
|
| | |
2/1/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue permit (Fm) "A"
|
|
Date Completed:
|
| | |
7/12/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pending letter; add inf (Fm)
|
|
Date Completed:
|
| | |
7/12/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
3/30/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Miscellaneous Action
|
|
Date Completed:
|
| | |
3/20/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Permit Application (Fm)
|
|
Date Completed:
|
| | |
3/15/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
5/24/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Asbuilt drawing submitted
|
|
Date Completed:
|
| | |
5/31/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Initial Site Inspection by HD
|
|
Date Completed:
|
| | |
6/1/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered "P"
|
|
Date Completed:
|
| | |
3/15/2017
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.
|
|
|
Title:
|
| | |
alternative-asbuilt required
|
|
Wording
|
| | |
H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
UDC compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.
|
|
|
Title:
|
| | |
food serv annual monitoring
|
|
Wording
|
| | |
WAC 246-272A REQUIRES ANNUAL WASTE STRENGTH MONITORING OF THE ONSITE SEWAGE SYSTEM WHEN IT IS SERVING A FOOD SERVICE ESTABLISHMENT.
|
|
|
Title:
|
| | |
BOD-WASTE STRENGTH MONITORING
|
|
Wording
|
| | |
WAC 246-272A REQUIRES ANNUAL WASTE STRENGTH MONITORING OF THE ONSITE SEWAGE SYSTEM WHEN IT IS SERVING A FOOD SERVICE ESTABLISHMENT. Renewal of the annual food service permit held until this condition is met.
Waste Strength (BOD, TSS, Grease and oils) is to be tested annually. Responsibility is that of the owner. Results are to be submitted to the Jefferson County Health Dept.
|
|
|
Title:
|
| | |
design flow/water usage monitorin
|
|
Wording
|
| | |
Exceeding the permitted design flow of 1500gpd on a peak day, shall constitute a violation of this permit. Water usage monitoring shall be conducted daily for the first two months & weekly thereafter. These monitoring results shall be submitted to the Jefferson County Health Dept.
|
|
|
Title:
|
| | |
Water line setback
|
|
Wording
|
| | |
10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.
|
|
|
Title:
|
| | |
O & M Manual required
|
|
Wording
|
| | |
Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.
|
|
|
Title:
|
| | |
System capacity/uses
|
|
Wording
|
| | |
Approval of this permit does not assure the existing septic system has capacity for all uses allowed by current code.
|
|
|
Title:
|
| | |
Designer Notification/inspections
|
|
Wording
|
| | |
Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.
|
|
|
Title:
|
| | |
Installation Inspection
|
|
Wording
|
| | |
Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.
|
|
|
Title:
|
| | |
No Building Permit Guaranteed
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.
|
|
|
Title:
|
| | |
Code Compliance
|
|
Wording
|
| | |
All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.
|
|
|
Title:
|
| | |
LIMMITED INFLUENT
|
|
Wording
|
| | |
This portion of the septic system is designed to treat higher strength waste, and is limited to occasional peak flows of 1500gpd. This septic system does not add any gallon per day capacity to any septic system on the property.
Separate Water use monitoring (Dose counter readings) is required for this system, separate from the lager system (SEP16-09) it is connected to.
|
|
|
Title:
|
| | |
EXISTING RESTROOM EFFLUENT LINE
|
|
Wording
|
| | |
H - The existing Restroom building has its existing effluent line in the area to be built over. This transport line is to be re-constructed through the foundation as part of this septic design and part of the building permit. Inspection is required by this office prior to back filling. This was prefered over re-routing the effluent line that would require crossing a water line.
ALSO, the additional bathrooms in the proposed building are to be routed into this existing effluent line. NOT to be part of the kitchen plumbing going to the Re-Circulting Gravel Filter.
|
|
|
Title:
|
| | |
Stormwater BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|