Permit Case Summary

Case Number: Search Help

Case Number:SEP2016-00097 Case Status:Finaled Date Received:6/15/2016
Description:Serves two residences and a shop Date Issued:9/23/2016
Applicant:EDWIN R UDD Expiration Date:12/23/2016 12:00:00 AM
Site Address:811 NESS' CORNER RD Case Finaled:8/9/2017
Parcel No:901024028 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 8/9/2017
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 11/30/2016
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 11/28/2016
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 11/10/2016
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 9/23/2016
Disposition: DONE
Description: REDESIGN SUBMITTED (Fm) "P"
Date Completed: 9/23/2016
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 9/23/2016
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 6/15/2016
Disposition: DONE
Description: Pressure test required
Date Completed: 11/30/2016
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 11/30/2016
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 8/2/2016
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/22/2016
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/22/2016
Disposition: DONE
Description: Case Entered "P"
Date Completed: 6/15/2016
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be sleeved/cased or equivalent.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO 48" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: domestic strength waste
Wording This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A for a failing system. The permit must be completed within 90 days of the date of issuance.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: System capacity/uses
Wording Approval of this permit does not assure the existing septic system has capacity for all uses allowed by current code.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: EXISTING WATER LINES
Wording H -The water lines serving each residence must be located. Water lines likely exist between the two residences and or in other area of this septic permit. If a water line can not be re-routed to avoid a crossing or a 10' setback to a sewage component, then the water line must be made to be 18" above the sewage line and cased where less than 10' to any sewage component.

Title: SHOP TRANSPORT LINE
Wording H -The existing transport line from the shop must be cased where under a driven way

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.