Case Number:SEP2016-00075 Case Status:Finaled Date Received:5/17/2016
Description:info from SEP78-123(Failed) filed here Date Issued:6/9/2016
Applicant:NOLA BELL Expiration Date:9/9/2016 12:00:00 AM
Site Address:30 PATISON ST Case Finaled:12/5/2017
Parcel No:942600307 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 12/5/2017
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 12/5/2017
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 12/5/2017
Disposition: DONE
Description: System Incomplete (Fm) "A"
Date Completed: 12/5/2017
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 12/5/2017
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 7/15/2016
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 6/9/2016
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 5/17/2016
Disposition: DONE
Description: Update SOM Repair Recd
Date Completed: 5/17/2016
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 7/21/2016
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 5/26/2016
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/9/2016
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/9/2016
Disposition: DONE
Description: Case Entered "P"
Date Completed: 5/17/2016
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: conventional-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval.

Title: riser on d-box
Wording Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A for a failing drainfield. The permit must be completed within 90 days of the date of issuance.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: EXISTING LATERALS
Wording If the existing lateral is encountered during installation, the existing lateral must be sealed off in such a way to prevent the waste water from migrating into the old lateral. Use bentonite or fine compacted soils as a dam.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.