Permit Case Summary

Case Number: Search Help

Case Number:SEP2015-00033 Case Status:Finaled Date Received:3/18/2015
Description:NOW FILED WITH SEP17-181-ADDING 1 LINE TO MAKE 480 GPD SYSTEM FOR BLD17-00493 Date Issued:4/24/2015
Applicant:PATRICK FOWLER Expiration Date:7/24/2015 12:00:00 AM
Site Address:51 MASONIC HALL RD Case Finaled:2/17/2016
Parcel No:994800601 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 2/17/2016
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 10/9/2015
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 6/23/2015
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 4/24/2015
Disposition: DONE
Description: Invoice for DCD Sent
Date Completed: 3/19/2015
Disposition:
Description: Septic Permit Application (Fm)
Date Completed: 3/18/2015
Disposition: DONE
Description: Pressure test required
Date Completed: 2/1/2016
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 6/18/2015
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 2/26/2015
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 4/21/2015
Disposition: DONE
Description: Case Entered "P"
Date Completed: 3/18/2015
Disposition:
Description: Stormwater Review-U
Date Completed: 4/24/2015
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: minimum land RESTRICTIVE COV
Wording H - This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots to meet the minimum land area required under WAC 246-272A Onsite Sewage Code. COVENANT recorded AFN 589753

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A for installing a septic system without a permit. The permit must be completed within 90 days of the date of issuance.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: OWNER INSTALLATION
Wording Owner installations require additional inspections by the septic system designer. Contact the designer prior to construction.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: Connection to Public Water
Wording This approval is valid only with a connection to an approved public water supply.