Permit Case Summary

Case Number: Search Help

Case Number:SEP2014-00029 Case Status:Finaled Date Received:3/6/2014
Description:Block 11 Spaces 433, 435, 437, 534, 536, 538 SEP89-26 failed and filed here. Date Issued:5/2/2014
Applicant: EVERGREEN COHO ESCAP RETREAT Expiration Date:8/2/2014 12:00:00 AM
Site Address:2481 ANDERSON LAKE RD Case Finaled:12/22/2014
Parcel No:901101039 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 12/22/2014
Disposition: DONE
Description: VIOLATION/COMPLIANCE (Fm) "V"
Date Completed: 12/24/2014
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: Issue permit (Fm) "A"
Date Completed: 5/2/2014
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 6/17/2014
Disposition: DONE
Description: REDESIGN SUBMITTED (Fm) "P"
Date Completed: 5/1/2014
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 5/1/2014
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 3/26/2014
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 3/7/2014
Disposition: DONE
Description: Pressure test required
Date Completed: 5/29/2014
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 12/24/2014
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 4/9/2014
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 4/17/2014
Disposition: DONE
Description: Case Entered "P"
Date Completed: 3/7/2014
Disposition:
Description: Stormwater Review-U
Date Completed: 4/17/2014
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED UP TO 78" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: domestic strength waste
Wording This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.

Title: BOD-WASTE STRENGTH MONITORING
Wording Waste Strength (BOD, TSS, Grease and oils) is to be monitored quarterly for the first year of operation and annually thereafter. Responsibility is that of the owner. Results are to be submitted to the Jefferson County Health Dept.

Title: AEROBIC TREATMENT SYS MANAGEMENT
Wording H - This onsite sewage system is permitted using an aerobic treatment unit (ATU.) All ATU systems must have a continuous and perpetual maintenance agreement in place for the life of the system. A signed contract with an approved entity, authorized by the product manufacturer, shall be required prior to final approval.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A. The permit must be completed within 90 days of the date of issuance.

Title: PUMP SCREEN REQUIRED
Wording A "Biotube" pump filter shall be provided around the pump, as per design

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: System capacity/uses
Wording Approval of this permit does not assure the existing septic system has capacity for all uses allowed by current code.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: DOSE
Wording The daily dose volume shall be limited to no more than 75% of the design flow, ie, 450gpd.

Title: TANK SUBSTITUTION
Wording PRIOR TO ANY TANK SUBSTITUTION CONTACT THE DESIGNER AND JEFFERSON COUNTY HEALTH DEPARTMENT.

Title: PRE TRASH TANK W/ FLOW EQUALLIZAT
Wording The first tank in the series is the "PRE TRASH TANK" with flow equalizing airlift. THE CENTER WALL OF THIS TANK MUST BE BAFFLED AT THE TOP AS SHOWN

Title: REMOVAL & STOCKPILE OF CONTAMINAT
Wording H - The contaminated soil removed from the failed bed shall be de-watered and transported to the shown location. Must be sanitized w/ lime and covered to prevent contact and run off from rain.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.