Permit Case Summary

Case Number: Search Help

Case Number:SEP2013-00142 Case Status:Canceled Date Received:12/13/2013
Description: Date Issued:
Applicant:STEPHEN PETERSON Expiration Date:
Site Address:57 SPOTTED OWL LN Case Finaled:
Parcel No:502151033 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Cancel/Expire applic "C"
Date Completed: 1/5/2022
Disposition: DONE
Description: Misc. Conversation or email
Date Completed: 1/20/2017
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 6/2/2015
Disposition:
Description: Miscellaneous action
Date Completed:
Disposition:
Description: Additional Info Request-DRD
Date Completed:
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 1/28/2015
Disposition:
Description: Pending letter; add inf (Fm)
Date Completed:
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 10/24/2014
Disposition:
Description: REDESIGN SUBMITTED (Fm) "P"
Date Completed:
Disposition:
Description: DCD Review Time
Date Completed: 1/14/2014
Disposition: PEND
Description: Miscellaneous action
Date Completed:
Disposition:
Description: Additional Info Request-DRD
Date Completed: 1/28/2015
Disposition: DONE
Description: Up Front Review
Date Completed:
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 10/24/2014
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 12/16/2013
Disposition: DONE
Description: Pressure test required
Date Completed:
Disposition:
Description: Asbuilt drawing submitted
Date Completed:
Disposition:
Description: Initial Site Inspection by HD
Date Completed:
Disposition:
Description: Env. Sensitive Area Review-U
Date Completed: 1/28/2015
Disposition: DONE
Description: Case Entered "P"
Date Completed: 12/16/2013
Disposition:
Description: Stormwater Review-U
Date Completed:
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: well setback requirement
Wording Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.

Title: trench depth
Wording MAXIMUM TRENCH DEPTH 12 INCHES

Title: reserve area, alternative
Wording When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required and must comply with code at the time of application for use.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: dose counter & ETM
Wording Dose counter and elapsed time meter are required in the control panel for all system components.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be sleeved/cased or equivalent.

Title: water tight tank
Wording Septic tank and pump chamber to be water tight. Extra protection (i.e. Bentonite) to be used around inlet, outlet, and risers due to high water table.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: surface water setback
Wording Setback to surface waters- 100' required from drainfield and reserve areas. 50' required from tanks.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.Location of existing water line to be verified to meet required 10'setback. At the time of use of the reserve area the water line will need to be moved to meet the setback requirements in effect at the time of permitting.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A. The permit must be completed within 90 days of the date of issuance.

Title: PUMP CHAMBER
Wording Pump chamber shall be water tight and a minimum capacity of 1,000 gallons. It shall be equipped with a control panel outside within line of sight of the pump chamber. The panel shall have an audio and visual alarm, a cycle counter and a riser to grade. It shall be UL listed and meet L&I requirements. Anti-buoyancy measures required if <12” soil cover over tank and water table has the potential to rise 36” or more above bottom of tank. The tank shall not be installed where the water level outside the tank exceeds the height of the outlet pipe saddle.

Title: SCREEN REQUIRED
Wording A screen shall be provided either at the outlet of the septic tank or around the pump or at both locations. A pump shroud is required if only an outlet baffle filter is used.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Certified Installer Required
Wording This system must be constructed by an installer certified by the Jefferson County Public Health Department per Jefferson County Code 8.15.120 (9) and state code WAC246-272A-0250.

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: REMOVE CONNECTION-HOLD
Wording H - The structure shall be disconnected from the existing system permitted to the west of this lot. The connection to this system was never approved.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.