Permit Case Summary

Case Number: Search Help

Case Number:SEP2013-00062 Case Status:Finaled Date Received:5/23/2013
Description:SEP88-31 (decommissioned) and filed here. Date Issued:9/30/2013
Applicant:PIERRE BUSTANOBY Expiration Date:12/30/2013 12:00:00 AM
Site Address:260 CURTISS ST Case Finaled:11/21/2013
Parcel No:901013007 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 11/21/2013
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 11/25/2013
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 11/1/2013
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 9/30/2013
Disposition: DONE
Description: Up Front Review
Date Completed: 9/4/2013
Disposition: DONE
Description: Additional Info Request-DRD
Date Completed: 9/13/2013
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 9/30/2013
Disposition: DONE
Description: Pressure test required
Date Completed: 11/13/2013
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 11/18/2013
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 5/29/2013
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 9/13/2013
Disposition: DONE
Description: Case Entered "P"
Date Completed: 5/23/2013
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: Tank Abandonment
Wording H - Existing septic tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED BED
Wording BED TO BE EXCAVATED TO 48" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: VIOLATION-limited permit life
Wording This permit was issued to correct a violation of WAC 246-272A. The permit must be completed within 90 days of the date of issuance.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: NO SHOOTING AREA
Wording This parcel is within a no shooting area per JCC 8.50.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: WATER CROSSING
Wording The water sewer crossing must be per plan w/ the watere line 18" below the sewer line and cases 10' on each side.

Title: EXISTING SEWAGE SUMPS
Wording H - The two unpermitted sewage sumps must be decommissioned. Doccumentation by the designer and installer is required.

Title: UGA SEWER
Wording The septic system shall be decommissioned and the property connected to the sewer system within one year of sewer availability, defined as when the sewer extension is within 200 feet of the closest property line.

Title: ESA
Wording The site plan received on 5-23-13 was reviewed by the Department of Community Development on 9-4-13 and it was determined the new septic system meets the requirements in Jefferson County Code. The septic location is outside of Critical Area buffers and outside of Shoreline Jurisdiction. Any future permits on this site are subject to review for consistency with applicable code and ordinances and does not preclude review and condition which may be placed on future permits.

Title: NO BUILDING REVIEW
Wording The site plan submitted April 3, 2013 shows exisitng building and uses for sturctures. These buildings have not been approved under this application.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.