Permit Case Summary

Case Number: Search Help

Case Number:SEP2012-00091 Case Status:Canceled Date Received:8/7/2012
Description: Date Issued:9/25/2012
Applicant:DANIEL GRANSTROM Expiration Date:9/25/2015 12:00:00 AM
Site Address:LILLIAN ST Case Finaled:
Parcel No:901101018 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Cancel/Expire applic "C"
Date Completed: 7/18/2016
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 9/25/2012
Disposition: DONE
Description: Pending letter; add inf (Fm)
Date Completed: 9/25/2012
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 9/13/2012
Disposition: DONE
Description: Pressure test required
Date Completed:
Disposition:
Description: Asbuilt drawing submitted
Date Completed:
Disposition:
Description: Initial Site Inspection by HD
Date Completed: 8/13/2012
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 9/13/2012
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/31/2012
Disposition: DONE
Description: Case Entered "P"
Date Completed: 8/7/2012
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED TRENCH
Wording TRENCH TO BE EXCAVATED FROM 108" TO 120" OR AS NEEDED TO REACH WELL DRAINED SOILS BELOW. BACKFILL W/ ASTM 33 TYPE SAND TO 24" AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: domestic strength waste
Wording This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: SECOND SEPTIC TANK
Wording THE SECOND SEPTIC TANK W/ A PUMP IN THE SECOND COMPARTMENT MUST HAVE THE CENTER WALL HOLE LOCATED AT THE TOP OF THE TANK AND BE BAFFLED. THE EFFLUENT LEVEL IN THE FIRST COMPARTMENT CAN NOT MOVE UP AND DOWN W/ THE PUMP.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.