Permit Case Summary

Case Number: Search Help

Case Number:SEP2010-00156 Case Status:Finaled Date Received:12/20/2010
Description:SEP81-94 abandoned in favor of this SEP. filed here Date Issued:1/6/2011
Applicant:BRUCE TURNER Expiration Date:1/6/2014 12:00:00 AM
Site Address:170 2ND ST Case Finaled:10/7/2011
Parcel No:986400402 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 10/7/2011
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 10/6/2011
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 10/7/2011
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 6/1/2011
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 1/6/2011
Disposition: DONE
Description: Pressure test required
Date Completed: 10/4/2011
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 12/20/2010
Disposition:
Description: Septic Permit Application (Fm)
Date Completed: 12/20/2010
Disposition: DONE
Description: Case Entered "P"
Date Completed: 12/22/2010
Disposition:
Description: Stormwater Review-U
Date Completed: 1/6/2011
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/6/2011
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 1/5/2011
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: minimum land area waiver
Wording This site has been granted a waiver from WAC 246-272A and JC Code 8.15 under Jefferson County Policy 97-2. The site requires a minimum land area of 21780 for a Type 1 soil. 13423 square feet are available on the site. Compliance with conditions of the waiver are required. Upgraded to TS-1 (levelA) 50% land area allowed w/o total gpd restriction.

Title: minimum land RESTRICTIVE COV
Wording H - This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots to meet the minimum land area required under WAC 246-272A Onsite Sewage Code. COVENANT recorded 556145

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: Connection to Public Water
Wording This approval is valid only with a connection to an approved public water supply.