Case Number:SEP2009-00037 Case Status:Finaled Date Received:4/14/2009
Description: Date Issued:10/9/2009
Applicant:WALTER NORTON Expiration Date:10/9/2012 12:00:00 AM
Site Address:11368 RHODY DR Case Finaled:3/28/2012
Parcel No:994200006 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 1/15/2016
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 3/28/2012
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 6/26/2012
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 1/11/2012
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 10/9/2009
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 10/9/2009
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 10/6/2009
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 8/14/2009
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 10/9/2009
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 4/14/2009
Disposition:
Description: Septic Permit Application (F)
Date Completed: 4/14/2009
Disposition: DONE
Description: Case Entered
Date Completed: 4/14/2009
Disposition:
Description: Stormwater Review-U
Date Completed: 5/1/2009
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/6/2009
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 4/22/2009
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 3/28/2012
Disposition: DONE
Description: Pressure test required
Date Completed: 2/15/2012
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: C-5 FOOT STREAM SETBACK
Wording An additional setback of five (5) feet is required from the edge of the stream buffer area to the proposed development.

Title: Wetland Setback
Wording Based on the Level 1 Wetland Report dated June 3, 2009 prepared by Westech Company, the wetland is a category II requiring a setback of 110 feet plus 40 feet additional feet since a full delineation was not completed; total wetland setback is 150 feet. The setback is measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing, or other alteration of the wetland or its buffer is allowed.

Title: Identify Wetland Buffer
Wording A permanent physical separation along the upland boundary of the wetland buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator.

Title: Mark Wetland Buffer Drng Cnstrctn
Wording Wetland buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer - Do Not Remove or Alter Existing Vegetation."

Title: Streamside Setback
Wording The identified Fish and Wildlife Habitat Area (Type S Stream), shall maintain a vegetative buffer setback of 150-feet. The setback shall be measured horizontally from the Ordinary High Water Mark (OHWM) to the proposed development.

Title: Identify Streamside Buffer
Wording A permanent physical separation along the boundary of the stream buffer area shall be installed and permanently maintained. Such separation can include installing logs, trees, a hedgerow, or any other prominent physical marking approved by the UDC Administrator.

Title: Mark Stream During Construction
Wording Stream buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall be in place prior to and during construction activities. The signs shall contain the following statement: "Buffer - Do Not Remove or Alter Existing Vegetation."

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: DECLARATION OF REST COV
Wording A Declaration of Restrictive Covenant, Irondale/Hadlock Sanitary Sewer System No Protest Agreement has been recorded on July 22, 2009 under AFN 545145 for the purpose requiring property owner(s) to connect to the sanitary sewer at such time that it becomes available.