Permit Case Summary

Case Number: Search Help

Case Number:SEP2008-00132 Case Status:Finaled Date Received:6/24/2008
Description:lot 14 Date Issued:8/15/2008
Applicant:JASON DINGLE Expiration Date:8/15/2011 12:00:00 AM
Site Address:11 CHIMACUM CREEK DR Case Finaled:3/17/2009
Parcel No:943700015 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-6 Months
Date Completed: 3/12/2010
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 3/17/2009
Disposition: DONE
Description: Monitoring Agreement Sent
Date Completed: 3/5/2009
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: Issue permit (F)
Date Completed: 8/15/2008
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 8/15/2008
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 6/26/2008
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 6/26/2008
Disposition:
Description: Case Entered
Date Completed: 6/26/2008
Disposition:
Description: Stormwater Review-U
Date Completed: 7/29/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/29/2008
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 7/31/2008
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 3/6/2009
Disposition: DONE
Description: Pressure test required
Date Completed: 3/6/2009
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL SYSTEMS REQUIRE MONITORING. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING AGREEMENT RECORDED TO THE PROPERTY TITLE PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: trench depth
Wording MAXIMUM TRENCH DEPTH 12 INCHES

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: dose counter & ETM
Wording Dose counter and elapsed time meter are required in the control panel for all system components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO 48" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: AEROBIC TREATMENT SYS MANAGEMENT
Wording H - This onsite sewage system is permitted using an aerobic treatment unit (ATU). All ATU systems must have a continuous and perpetual maintenance agreement in place for the life of the system. A signed contract with an approved entity, authorized by the product manufacturer, shall be required prior to final approval.

Title: ATU maintenance
Wording A maintenance and management contract is required with the manufacturers authorized representative. Maintenance of the system shall be completed by a manufacturers authorized representative at the frequency required by the manufacturer. That frequency may be increased to meet State requirements for Treatment Standard 1 systems.

Title: ATU RECORDING/COMPLIANCE
Wording H - The signed Notice for Maintenance and Monitoring of an Onsite Sewage System shall be recorded to the property title prior to final approval. Non-compliance with the contract or maintenance requirements is a violation of this permit.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED PER JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: Setback - Drains
Wording A 30' setback shall be maintained from the disposal component and reserve area to any downslope footing, curtain or interceptor drain or drainage ditch.

Title: PUMP CHAMBER
Wording Pump chamber shall be water tight and a minimum capacity of 1000 gallons. It shall be equipped with a control panel outside within line of sight of the pump chamber. The panel shall have an audio and visual alarm, a cycle counter and a riser to grade. It shall be UL listed and meet L&I requirements.

Title: SCREEN REQUIRED
Wording A screen shall be provided either at the outlet of the septic tank or around the pump or at both locations. A pump shroud is required if only an outlet baffle filter is used.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County staff for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Critical Aquifer Recharge Area.