Permit Case Summary

Case Number: Search Help

Case Number:SEP2006-00043 Case Status:Canceled Date Received:2/13/2006
Description:expired-filed to orig. case SEP74-151 Date Issued:3/24/2006
Applicant: SECRETARY OF VETERANS AFFAIRS Expiration Date:3/24/2009 12:00:00 AM
Site Address:131 B ST Case Finaled:
Parcel No:996400807 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Cancel/withdraw application
Date Completed: 5/20/2009
Disposition: DONE
Description: Issue permit (F)
Date Completed: 3/24/2006
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 3/24/2006
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 2/13/2006
Disposition:
Description: Septic Permit Application (F)
Date Completed: 2/13/2006
Disposition: DONE
Description: Case Entered
Date Completed: 2/13/2006
Disposition:
Description: Stormwater Review-U
Date Completed: 3/13/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/13/2006
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 1/18/2006
Disposition: DONE
Description: Pressure test required
Date Completed:
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording H - AS PER WAC 246-272 AND JEFFERSON COUNTY CODE 8.15 ALL SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM. While the County strongly recommends that the property owner allow inspectors to enter their property to inspect the system in order to insure that the system is functioning correctly, the property owner always has the right under the Fourth Amendment and our State Constitution, to refuse the inspectors access to their property. The property owner never loses the right to refuse access and can do so despite never having refused access before.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO 45"- 48" DEPTH AND THEN BACKFILLED WITH 24" of ASTM 33 TYPE SAND AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: minimum land area waiver
Wording This site has been granted a waiver from WAC 246-272 under Jefferson County Policy 97-2. The site requires a minimum land area of 12,500 sq ft for a Type 2 soil. 10,200 square feet are available on the site. Compliance with conditions of the waiver are required, a maximum of 360 gallons of waste water per day can be applied to the site.

Title: minimum land RESTRICTIVE COV
Wording H - This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots 11 & 12 of block 8,South Port Townsend to meet the minimum land area required under WAC 246-272 Onsite Sewage Code. COVENANT to be recorded prior to final.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED AT 6 MONTHS, AT ONE YEAR AND ANNUALLY THEREAFTER.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components. If the existing water line is found to be less than 10' from the system it shall be rerouted to maintain the required 10' setback.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation.

Title: GRAVELLESS CHAM-NO HOLD
Wording If gravelless chambers are used a 3" layer of pea gravel shall be placed under the chambers on top of the sand lining to prevent migration. Pea gravel or drainrock shall be used between the chambers up to the louvers to achieve the full infiltrative area required in the system.