Case Number:SEP2005-00106 Case Status:Finaled Date Received:4/12/2005
Description:TRITON COVE. Replace existing VAULT TOILET with new model. SEP98-211 to be abandoned now filed here. case filed to SEP05-00106 Date Issued:6/2/2005
Applicant: WASHINGTON STATE PARKS & Expiration Date:6/2/2008 12:00:00 AM
Site Address:314515 HWY 101 Case Finaled:1/22/2007
Parcel No:502313013 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 1/22/2007
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 1/22/2007
Disposition: DONE
Description: Issue permit (F)
Date Completed: 6/2/2005
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 6/2/2005
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 4/13/2005
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 4/13/2005
Disposition:
Description: Case Entered
Date Completed: 4/13/2005
Disposition:
Description: Stormwater Review-U
Date Completed: 6/1/2005
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/1/2005
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 4/20/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Tank Abandonment
Wording Existing vault shall be properly abandoned. It shall be pumped out and filled with clean fill or removed and disposed of at a licensed landfill. Documentation to be provided to Health Dept. prior to final.

Title: comm- sep tank inspection
Wording Health Department is to be contacted for a final inspection of the vault upon completion

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: holding tank
Wording Risers to grade with secured lids shall be located over all compartments. Access ports intended for use as pump-out sites shall be fitted with an impervious pad that slopes towards the access. All pumping and related service must be performed by a Jefferson County licensed septic system pumper. Permit Holder shall maintain and keep operational records which include pumping intervals, sewage volume, disposal site, service and repair records. These records shall be available upon request of the Health officer representative.

Title: conventional-asbuilt required
Wording An asbuilt drawing and certification of completion by the Designer is required prior to final approval.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.