Permit Case Summary

Case Number: Search Help

Case Number:SEP2005-00086 Case Status:Finaled Date Received:3/21/2005
Description:lots 16-19 Date Issued:5/24/2005
Applicant:RYAN ANDERSON Expiration Date:5/24/2008 12:00:00 AM
Site Address:21 HAYDEN ST Case Finaled:4/19/2006
Parcel No:958800102 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-6 Months
Date Completed: 5/25/2007
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 11/1/2006
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 4/19/2006
Disposition: DONE
Description: Issue permit (F)
Date Completed: 5/24/2005
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 5/24/2005
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 3/22/2005
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 3/22/2005
Disposition:
Description: Case Entered
Date Completed: 3/22/2005
Disposition:
Description: Stormwater Review-U
Date Completed: 4/5/2005
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 4/5/2005
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 3/2/2005
Disposition: DONE
Description: Pressure test required
Date Completed: 3/14/2006
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 AND JEFFERSON COUNTY CODE 8.15 ALL SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM. While the County strongly recommends that the property owner allow inspectors to enter their property to inspect the system in order to insure that the system is functioning correctly, the property owner always has the right under the Fourth Amendment and our State Constitution, to refuse the inspectors access to their property. The property owner never loses the right to refuse access and can do so despite never having refused access before.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO 42" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: minimum land RESTRICTIVE COV
Wording This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots 16-19 of block 1, Hadens supplemental to Port Townsend to meet the minimum land area required under WAC 246-272 Onsite Sewage Code. COVENANT recorded 5/18/05, #498365

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED AT 6 MONTHS, AT ONE YEAR AND ANNUALLY THEREAFTER.

Title: protective barriers
Wording Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-No ESAs Found
Wording The application was reviewed by Jefferson County staff for the presence of Environmentally Sensitive Areas (ESAs) and has concluded that the property DOES NOT contain Environmentally Sensitive Areas. Future proposals will be subject to a new ESA review and conditions may be added if ESAs are found on the property.