Permit Case Summary

Case Number: Search Help

Case Number:SEP2004-00246 Case Status:Finaled Date Received:9/27/2004
Description:lot 11- connected to SEP95-00291, community system "B" Date Issued:10/20/2004
Applicant: BRODERS INC Expiration Date:10/20/2007 12:00:00 AM
Site Address:234 PORT HADLOCK HEIGHTS RD Case Finaled:4/4/2005
Parcel No:989506111 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 4/4/2005
Disposition: DONE
Description: Issue permit (F)
Date Completed: 10/20/2004
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 9/28/2004
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 9/28/2004
Disposition:
Description: Case Entered
Date Completed: 9/28/2004
Disposition:
Description: Stormwater Review-U
Date Completed: 10/1/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/1/2004
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 10/8/2004
Disposition: DONE
Description: Pressure test required
Date Completed: 4/4/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pressure test observation
Wording Health Dept. required to observe pump test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED EVERY 3 YEARS

Title: conventional-asbuilt required
Wording An asbuilt drawing and certification of completion by the Installer is required prior to final approval.

Title: surface water setback
Wording Setback to surface waters- 50' required from tanks.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County staff for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Critical aquifer Recharge Area.