Permit Case Summary

Case Number: Search Help

Case Number:SEP2003-00297 Case Status:Finaled Date Received:12/15/2003
Description: Date Issued:2/11/2004
Applicant:EDWARD MC CLAHAHAN Expiration Date:2/11/2007 12:00:00 AM
Site Address:101 FRAYNE ST Case Finaled:11/17/2004
Parcel No:931300001 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-1 Year
Date Completed: 4/13/2010
Disposition: DONE
Description: OSS Inspection-1 Year
Date Completed: 3/6/2007
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 3/15/2006
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 11/17/2004
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 9/30/2005
Disposition: DONE
Description: Issue permit (F)
Date Completed: 2/11/2004
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 2/11/2004
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 12/17/2003
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 12/17/2003
Disposition:
Description: Case Entered
Date Completed: 12/17/2003
Disposition:
Description: Stormwater Review-U
Date Completed: 2/11/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/21/2004
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 12/30/2003
Disposition: DONE
Description: Pressure test required
Date Completed: 10/28/2004
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 AND JEFFERSON COUNTY CODE 8.15 ALL SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM. While the County strongly recommends that the property owner allow inspectors to enter their property to inspect the system in order to insure that the system is functioning correctly, the property owner always has the right under the Fourth Amendment and our State Constitution, to refuse the inspectors access to their property. The property owner never loses the right to refuse access and can do so despite never having refused access before.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: reserve area, alternative
Wording When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO 48" DEPTH AND THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AND UP SIDE WALLS AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED AT 6 MONTHS, AT ONE YEAR AND ANNUALLY THEREAFTER.

Title: protective barriers
Wording Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.

Title: riser on d-box
Wording Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: BOOT AND VALVE-NO HOLD
Wording For the recirculating gravel filter: The boot exiting the recirculating gravel filter but be double clamped per state guidelines. The size of the bouyant-ball valve shall be determined by the designer prior to installation.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County staff for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Critical Aquifer Recharge Area.